Broadway 3 - UC Merced 1
5200 N Lake Blvd., Merced, CA 95343Plant Summary Information
Broadway 3 - UC Merced 1 is ranked #862 out of 917 solar farms in California in terms of total annual net electricity generation.
Broadway 3 - UC Merced 1 generated 104.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Broadway 3 - UC Merced 1 |
|---|---|
| Utility Name | MN8 Energy LLC |
| Location | Merced County, CA |
| Initial Operation Date | October 2009 |
| Last Update | Dec 2025 |
| Annual Generation | 929.0 MWh |
| Annual Consumption | 3.3 k MMBtu |
| Ranked #12,183 out of 13,301 Power Plants Nationwide | |
| Ranked #6,872 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #1,564 out of 1,641 California Power Plants | |
| Ranked #862 out of 917 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2025) |
Map of Broadway 3 - UC Merced 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Broadway 3 - UC Merced 1.
Monthly Net Generation for Broadway 3 - UC Merced 1
Monthly Plant Fuel Consumption for Broadway 3 - UC Merced 1
Broadway 3 - UC Merced 1 Details
| Summary Information | |
|---|---|
| Plant Name | Broadway 3 - UC Merced 1 (65186) |
| Plant Address | 5200 N Lake Blvd., Merced, CA 95343 |
| Utility | MN8 Energy LLC (61944) |
| Latitude, Longitude | 37.36448, -120.43108 |
| Generation Dates on File | Jan 2021 to Dec 2025 |
| Initial Operation Date | October 2009 |
| Annual Generation | 929.0 MWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 10-136 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator GEN1 Details Operating October 2009
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 1 MW |
| Summer Capacity | 1 MW |
| Winter Capacity | 1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | October 2009 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 1.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Broadway 3 - UC Merced 1 Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Wells Fargo Equipment Finance Inc | 733 Marquette Ave, Minneapolis, MN 55402 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6862 | NEDC Solar Site | Whitinsville, MA | 953.0 MWh |
| #6863 | Bishop Ranch - BR 15-CC | San Ramon, CA | 950.0 MWh |
| #6864 | SunE Rochester | Rancho Cucamonga, CA | 946.0 MWh |
| #6865 | Hopewell Valley High School Hybrid | Pennington, NJ | 946.0 MWh |
| #6866 | 401 South | Dalton, MA | 945.0 MWh |
| #6867 | Shelby Solar Energy Generation Facility | Shelby, NC | 938.0 MWh |
| #6868 | LTMUA | Villas, NJ | 933.0 MWh |
| #6869 | Caldwell Wastewater Treatment Plant Hybr | West Caldwell, NJ | 932.0 MWh |
| #6870 | Rariton OMP | Raritan, NJ | 932.0 MWh |
| #6871 | Morgantown Solar Park | Morgantown, PA | 930.0 MWh |
| #6873 | USS Greenhouse Solar LLC CSG | Pine Island, MN | 927.0 MWh |
| #6874 | McKee City Solar Phase 2 | Egg Harbor Township, NJ | 922.0 MWh |
| #6875 | Novel Swenson Solar LLC CSG | North Branch, MN | 922.0 MWh |
| #6876 | Western Branch High School | Chesapeake, VA | 921.0 MWh |
| #6877 | 3100 Valleyview Drive | Columbus, OH | 916.0 MWh |
| #6878 | Cedarville CSG | Plymouth, MA | 914.0 MWh |
| #6879 | CPA 2132 E Dominguez | Carson, CA | 913.0 MWh |
| #6880 | Franklin CSG 1 | Franklin, MN | 913.0 MWh |
| #6881 | Rockville Solar II, LLC | Indianapolis, IN | 912.0 MWh |
| #6882 | Samuel Mickle School | Mickleton, NJ | 912.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Broadway 3 - UC Merced 1.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 2097 Helton Solar Project | Merced, CA | 1.1 GWh | 4.3 mi |
| Adera Solar | Chowchilla, CA | 32.7 GWh | 17.8 mi |
| Avenue 26 Solar | Chowchilla, CA | 13.3 GWh | 21.6 mi |
| Chowchilla II | Chowchilla, CA | 13.7 GWh | 20.4 mi |
| City of Atwater NEM | Atwater, CA | 1.6 GWh | 12.5 mi |
| Don Pedro | La Grange, CA | 288.3 GWh | 22.9 mi |
| East Cleveland Road Solar | El Nido, CA | 5.9 GWh | 16.6 mi |
| Exchequer | Snelling, CA | 245.8 GWh | 17.6 mi |
| Five H Farms Solar Array | Merced, CA | 2.2 GWh | 18.5 mi |
| La Grange | La Grange, CA | 6.6 GWh | 21.1 mi |
| McSwain | Snelling, CA | 26.9 GWh | 12.8 mi |
| Merced Falls | Snelling, CA | 9.1 GWh | 12.3 mi |
| Merced Pipeline | Merced, CA | 1.3 GWh | 11 mi |
| Merced Solar LLC | Merced, CA | 3.9 GWh | 7.3 mi |
| Mission Solar LLC | Merced, CA | 3.6 GWh | 7.3 mi |
| Parker | Snelling, CA | 6.0 GWh | 7.9 mi |
| Turlock Lake | Hickman, CA | 3.2 GWh | 19.3 mi |
| UC Merced Solar Hybrid | Merced, CA | 8.0 GWh | 0.1 mi |
| Upper Dawson | La Grange, CA | 8.9 GWh | 19.9 mi |
| West Tambo Clean Power II | Livingston, CA | 4.3 GWh | 15.8 mi |