McFarland A Solar and Storage
67201 E. Palomas Rd., Dateland, AZ 85333Plant Summary Information
McFarland A Solar and Storage is ranked #36 out of 168 power plants in Arizona in terms of total annual net electricity generation.
McFarland A Solar and Storage generated 148.2 GWh during the 3-month period between July 2025 to October 2025.
| Plant Name | McFarland A Solar and Storage |
|---|---|
| Utility Name | AES Clean Energy |
| Location | Yuma County, AZ |
| Initial Operation Date | December 2023 |
| Last Update | Oct 2025 |
| Annual Generation | 532.4 GWh |
| Annual Consumption | 2.0 M MMBtu |
| Ranked #1,282 out of 12,553 Power Plants Nationwide | |
| Ranked #91 out of 6,410 Solar Power Plants Nationwide | |
| Ranked #36 out of 168 Arizona Power Plants | |
| Ranked #8 out of 115 Arizona Solar Power Plants | |
| Fuel Types | Solar |
Map of McFarland A Solar and Storage
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for McFarland A Solar and Storage.
Monthly Net Generation for McFarland A Solar and Storage
McFarland A Solar and Storage Details
| Summary Information | |
|---|---|
| Plant Name | McFarland A Solar and Storage (66636) |
| Plant Address | 67201 E. Palomas Rd., Dateland, AZ 85333 |
| Utility | AES Clean Energy (64904) |
| Latitude, Longitude | 32.95129, -113.49052 |
| Generation Dates on File | Dec 2023 to Oct 2025 |
| Initial Operation Date | December 2023 |
| Annual Generation | 532.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG23-84 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
| Grid Voltage | 500.00 kV |
| Energy Storage | Yes |
Generator BESS Details Operating December 2023
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 100 MW |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 400 |
|---|---|
| Maximum Charge Rate | 100 MW |
| Maximum Discharge Rate | 100 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 45 |
| Storage Enclosure Type | CS |
| Frequency Regulation | Yes |
| Ramping Spinning Reserve | Yes |
| System Peak Shaving | P |
| Voltage Or Reactive Power Support | Yes |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 66636 |
| Direct Support Gen Id | MCFRA |
| Support T D Asset | Yes |
Generator MCFRA Details Operating December 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 200 MW |
| Summer Capacity | 200 MW |
| Winter Capacity | 200 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 180 |
| Tilt Angle | 52 |
| DC Net Capacity | 250 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
McFarland A Solar and Storage Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #81 | Golden Field Solar III, LLC | Rosamond, CA | 529.0 GWh |
| #82 | Dodge Flat | Reno, NV | 546.0 GWh |
| #83 | Galloway 1 Solar Farm | Paint Rock, TX | 549.4 GWh |
| #84 | Daggett 2 | Daggett, CA | 525.9 GWh |
| #85 | Stampede Solar Hybrid | Saltillo, TX | 541.0 GWh |
| #86 | Sun Valley Solar Project | Abbott, TX | 546.3 GWh |
| #87 | Porter Solar, LLC (TX) | Krum, TX | 545.8 GWh |
| #88 | Agua Caliente Solar Project | Dateland, AZ | 543.7 GWh |
| #89 | Peregrine Solar | Gollad, TX | 542.8 GWh |
| #90 | Azure Sky Solar | Haskell, TX | 534.3 GWh |
| #92 | Noble Solar | Krum, TX | 532.7 GWh |
| #93 | SR Toombs, LLC | Vidalia, GA | 533.2 GWh |
| #94 | McFarland B Solar and Storage | Dateland, AZ | 524.3 GWh |
| #95 | Fence Post Solar Hybrid Project, LLC | Corsicana, TX | 525.9 GWh |
| #96 | Taygete Energy Project LLC | Coyanosa, TX | 529.0 GWh |
| #97 | True North Solar, LLC | Otto, TX | 527.8 GWh |
| #98 | Escalante (NM) | Grants, NM | 527.1 GWh |
| #99 | RE Maplewood | McCamey, TX | 522.5 GWh |
| #100 | Great Valley Solar Portfolio Holdings, L | Cantua Creek, CA | 521.5 GWh |
| #101 | Delilah Solar Energy LLC | Bogota, TX | 521.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding McFarland A Solar and Storage.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Agua Caliente Solar Project | Dateland, AZ | 543.7 GWh | 1.8 mi |
| Arlington Valley Energy Facility | Arlington, AZ | 3.4 TWh | 44 mi |
| Arlington Valley Solar Energy II | Arlington, AZ | 341.2 GWh | 45.2 mi |
| Gila Bend Hybrid | Gila Bend, AZ | 84.7 GWh | 35.3 mi |
| Harquahala 2 | Tonopah, AZ | 559.6 GWh | 41.5 mi |
| Harquahala Generating Project | Tonopah, AZ | 3.2 TWh | 42.3 mi |
| Harquahala Sun Solar Project | Tonopah, AZ | 265.4 GWh | 39.6 mi |
| Hyder II Hybrid | Hyder, AZ | 32.5 GWh | 9.7 mi |
| Hyder Solar Hybrid | Hyder, AZ | 35.3 GWh | 9.9 mi |
| McFarland B Solar and Storage | Dateland, AZ | 524.3 GWh | 0.9 mi |
| Mesquite Generating Station Block 1 | Arlington, AZ | 3.4 TWh | 45.3 mi |
| Mesquite Generating Station Block 2 | Arlington, AZ | 4.1 TWh | 45.3 mi |
| Mesquite Solar 1 | Tonopah, AZ | 401.4 GWh | 43.4 mi |
| Mesquite Solar 2, LLC | Tonopah, AZ | 287.9 GWh | 42.6 mi |
| Mesquite Solar 3, LLC | Tonopah, AZ | 446.8 GWh | 42.1 mi |
| Mesquite Solar 4, LLC | Tonopah, AZ | 146.7 GWh | 42 mi |
| Mesquite Solar 5, LLC | Tonopah, AZ | 134.4 GWh | 42 mi |
| Saddle Mountain Solar I | Tonopah, AZ | 34.5 GWh | 34.5 mi |
| Solana Generating Station | Gila Bend, AZ | 851.8 GWh | 31.1 mi |
| White Wing Solar | Yuma, AZ | 460.4 GWh | 3.1 mi |