Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Folsom | U S Bureau of Reclamation | Folsom, CA | Balancing Authority of Northern California (BANC) | 509.9 GWh | Apr 1955 | Sep 2025 | Water |
| Keswick | U S Bureau of Reclamation | Redding, CA | Balancing Authority of Northern California (BANC) | 409.4 GWh | Sep 1949 | Sep 2025 | Water |
| Stampede | U S Bureau of Reclamation | Truckee, CA | Nevada Power Company (NEVP) | 15.6 GWh | Dec 1987 | Sep 2025 | Water |
| New Melones | U S Bureau of Reclamation | Jamestown, CA | Balancing Authority of Northern California (BANC) | 275.9 GWh | May 1979 | Sep 2025 | Water |
| US Borax | U S Borax Inc | Boron, CA | California Independent System Operator (CISO) | 279.4 GWh | Jun 1984 | Sep 2025 | Natural Gas |
| Frankenheimer Power Plant | Turlock Irrigation District | Oakdale, CA | California Independent System Operator (CISO) | 12.6 GWh | Feb 1983 | Oct 2024 | Water |
| Almond Power Plant | Turlock Irrigation District | Modesto, CA | Turlock Irrigation District (TIDC) | 160.9 GWh | Mar 1996 | Sep 2025 | Natural Gas |
| Turlock Lake | Turlock Irrigation District | Hickman, CA | Turlock Irrigation District (TIDC) | 7.0 GWh | Jun 1980 | Dec 2024 | Water |
| Don Pedro | Turlock Irrigation District | La Grange, CA | Turlock Irrigation District (TIDC) | 277.5 GWh | Apr 1971 | Sep 2025 | Water |
| La Grange | Turlock Irrigation District | La Grange, CA | Turlock Irrigation District (TIDC) | 4.4 GWh | Nov 1924 | Dec 2024 | Water |
| Hickman | Turlock Irrigation District | Hickman, CA | Turlock Irrigation District (TIDC) | 3.6 GWh | Aug 1979 | Dec 2024 | Water |
| Walnut Energy Center | Turlock Irrigation District | Turlock, CA | Turlock Irrigation District (TIDC) | 1.6 TWh | Jan 2006 | Sep 2025 | Natural Gas |
| Walnut | Turlock Irrigation District | Turlock, CA | Turlock Irrigation District (TIDC) | 429.0 MWh | Mar 1986 | Dec 2024 | Natural Gas : 90.5% Distillate Fuel Oil : 9.5% |
| Upper Dawson | Turlock Irrigation District | La Grange, CA | Turlock Irrigation District (TIDC) | 10.7 GWh | Oct 1983 | Dec 2024 | Water |
| Luciana | Tulare Solar Center, LLC | Richgrove, CA | California Independent System Operator (CISO) | 138.4 GWh | Mar 2022 | Sep 2025 | Solar |
| Trona Solar III | Trona Solar III LLC | Trona, CA | California Independent System Operator (CISO) | 4.5 GWh | Mar 2023 | Dec 2024 | Solar |
| 20333 Normandie PV, LLC | TRITEC Americas | Torrance, CA | Los Angeles Department of Water and Power (LDWP) | 5.3 GWh | Nov 2021 | Dec 2024 | Solar |
| Sand Bar Power Plant | Tri-Dam Power Authority | Stanislaus Ntl. Fores, CA | California Independent System Operator (CISO) | 85.5 GWh | Apr 1986 | Dec 2024 | Water |
| Transamerica Pyramid | Transamerica Pyramid Properties LLC | San Francisco, CA | California Independent System Operator (CISO) | 525.0 MWh | Jun 2007 | Dec 2023 | Natural Gas |
| Tranquillity ID | Tranquillity Solar 1, LLC | Tranquillity, CA | California Independent System Operator (CISO) | 2.8 GWh | Feb 2018 | Dec 2024 | Solar |
| Toyon Power Station | Toyon Landfill Gas Conversion, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 6.6 GWh | Dec 1985 | Dec 2024 | Landfill Gas |
| Torrance Refining Company, LLC | Torrance Refining Company, LLC | Torrance, CA | California Independent System Operator (CISO) | 83.1 GWh | Aug 1983 | Sep 2025 | Other Gas : 74.7% Waste Heat : 25.3% |
| Cold Canyon 1 | Toro Energy of California SLO | San Luis Obispo, CA | California Independent System Operator (CISO) | 3.8 GWh | Jun 2013 | Dec 2024 | Landfill Gas |
| Topaz Solar Farm | Topaz Solar Farms LLC | Santa Margarita, CA | California Independent System Operator (CISO) | 1.0 TWh | Mar 2013 | Sep 2025 | Solar |
| Titan Solar 1 (CA) | Titan Solar 1, LLC | Borrego Springs, CA | California Independent System Operator (CISO) | 131.9 GWh | Nov 2020 | Sep 2025 | Solar |
| THUMS | THUMS Long Beach Company | Long Beach, CA | California Independent System Operator (CISO) | 206.9 GWh | Dec 2002 | Sep 2025 | Natural Gas |
| University of the Pacific | The Greater Light USA LLC | Stockton, CA | California Independent System Operator (CISO) | 6.5 GWh | Apr 2022 | Dec 2024 | Solar |
| Berrenda Mesa Water District | The Greater Light USA LLC | Lost Hills, CA | California Independent System Operator (CISO) | 16.5 GWh | Jun 2023 | Dec 2024 | Solar |
| Equilon Los Angeles Refining | Tesoro Refining and Marketing Company | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 283.8 GWh | Nov 1982 | Sep 2025 | Other Gas : 97.5% Natural Gas : 2.5% |
| Marathon Bay Area Cogen | Tesoro Marketing & Refining Co. LLC (Martinez) | Martinez, CA | California Independent System Operator (CISO) | 613.4 GWh | Jan 1987 | Sep 2025 | Natural Gas |
| Division 2 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 541.0 MWh | May 2014 | Dec 2024 | Solar |
| Division 3 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 458.0 MWh | May 2014 | Dec 2024 | Solar |
| Division 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 2.7 GWh | May 2014 | Dec 2024 | Solar |
| Kettering Solar 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.6 GWh | May 2014 | Dec 2024 | Solar |
| Kettering Solar 2 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.9 GWh | May 2014 | Dec 2024 | Solar |
| Intel Folsom Phase 2 | Tesla Inc. | Folsom, CA | Balancing Authority of Northern California (BANC) | 1.5 GWh | Sep 2012 | Dec 2024 | Solar |
| Walnut Unified School District Walnut HS | Tesla Inc. | Walnut, CA | California Independent System Operator (CISO) | 809.0 MWh | Jan 2020 | Dec 2024 | Solar |
| Sacramento Regional County Sanitation PV | Tesla Inc. | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 7.3 GWh | Nov 2017 | Dec 2024 | Solar |
| Intel Folsom Phase 3 | Tesla Inc. | Folsom, CA | Balancing Authority of Northern California (BANC) | 9.0 GWh | Mar 2016 | Dec 2024 | Solar |
| Las Virgenes Municipal Water District | Tesla Inc. | Calabasas, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2014 | Dec 2024 | Solar |
| Monterey Regional Water Pollution Contro | Tesla Inc. | Marina, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2010 | Dec 2024 | Solar |
| Lancaster Baptist Church | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2011 | Dec 2024 | Solar |
| Sacramento Fairbain Water Treatment Plan | Tesla Inc. | Sacramento, CA | Balancing Authority of Northern California (BANC) | 961.0 MWh | Jan 2013 | Dec 2024 | Solar |
| Blue Shld Of Cal- El Dorado Hlls Mtr B | Tesla Inc. | El Dorado Hills, CA | Balancing Authority of Northern California (BANC) | 2.8 GWh | Jun 2019 | Dec 2024 | Solar |
| Genentech Vacaville Meter #1 | Tesla Inc. | Vacaville, CA | California Independent System Operator (CISO) | 11.0 GWh | Apr 2017 | Dec 2024 | Solar |
| AVS Lancaster 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 8.7 GWh | Nov 2016 | Dec 2024 | Solar |
| Intel Folsom | Tesla Inc. | Folsom, CA | Balancing Authority of Northern California (BANC) | 1.5 GWh | Jun 2010 | Dec 2024 | Solar |
| Genentech-Oceanside Hybrid | Tesla Inc. | Oceanside, CA | California Independent System Operator (CISO) | 3.6 GWh | Mar 2016 | Dec 2024 | Solar |
| US-TOPCO (Soccer Center) | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 7.0 GWh | Nov 2016 | Dec 2024 | Solar |
| US GSA - Sacramento | Tesla Inc. | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.0 GWh | Feb 2018 | Dec 2024 | Solar |
| Valley Sanitary District WTP Solar | Tesla Inc. | Indio, CA | Los Angeles Department of Water and Power (LDWP) | 1.4 GWh | Nov 2016 | Dec 2024 | Solar |
| Clovis High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 826.0 MWh | Mar 2018 | Dec 2024 | Solar |
| Clovis East High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Dec 2024 | Solar |
| Clovis North High School | Tesla Inc. | Fresno, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2017 | Dec 2024 | Solar |
| Fremont - Kato Rd | Tesla Inc. | Fremont, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2016 | Dec 2024 | Solar |
| Fremont CA AutoFactory | Tesla Inc. | Fremont, CA | California Independent System Operator (CISO) | 480.0 MWh | Feb 2022 | Dec 2024 | Solar |
| E&B Resources | Terraform Arcadia | Bakersfield, CA | California Independent System Operator (CISO) | 2.2 GWh | Nov 2013 | Dec 2024 | Solar |
| Little Rock Pham Solar | Terraform Arcadia | Palmdale, CA | Los Angeles Department of Water and Power (LDWP) | 7.6 GWh | Nov 2015 | Dec 2024 | Solar |
| Corcoran | Terraform Arcadia | Corcoran, CA | California Independent System Operator (CISO) | 1.7 GWh | Dec 2013 | Dec 2024 | Solar |
| Morgan Lancaster 1 | Terraform Arcadia | Lancaster, CA | California Independent System Operator (CISO) | 796.0 MWh | Aug 2015 | Dec 2024 | Solar |
| Sacramento (SMUD) | Terraform Arcadia | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.0 GWh | Jul 2014 | Dec 2024 | Solar |
| Coachella Hills Wind | Terra-Gen Operating Co-Wind | Palm Springs, CA | California Independent System Operator (CISO) | 221.7 GWh | Feb 2021 | Sep 2025 | Wind |
| Voyager Wind I | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 413.4 GWh | Nov 2019 | Sep 2025 | Wind |
| Point Wind | Terra-Gen Operating Co-Wind | Tehachapi, CA | California Independent System Operator (CISO) | 234.2 GWh | Feb 2021 | Sep 2025 | Wind |
| Oasis Alta | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 57.0 GWh | Mar 2021 | Dec 2024 | Wind |
| Voyager Wind II | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 505.9 GWh | Nov 2018 | Sep 2025 | Wind |
| Voyager Wind III | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 141.2 GWh | Nov 2018 | Sep 2025 | Wind |
| Voyager Wind IV | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 80.9 GWh | Nov 2018 | Dec 2024 | Wind |
| Painted Hills Wind Park | Terra-Gen Operating Co-Wind | Whitewater, CA | California Independent System Operator (CISO) | 173.5 GWh | Oct 1985 | Sep 2025 | Wind |
| San Gorgonio Westwinds II LLC | Terra-Gen Operating Co-Wind | North Palm Springs, CA | California Independent System Operator (CISO) | 124.4 GWh | May 1999 | Dec 2024 | Wind |
| Oak Creek Energy Systems I | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 54.5 GWh | May 1982 | Dec 2024 | Wind |
| East Winds Project | Terra-Gen Operating Co-Wind | Palm Springs, CA | California Independent System Operator (CISO) | 7.1 GWh | Nov 1983 | Dec 2024 | Wind |
| Mojave 16/17/18 | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 73.9 GWh | Nov 1989 | Dec 2024 | Wind |
| Ridgetop Energy LLC | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 27.0 GWh | Dec 1983 | Dec 2024 | Wind |
| Oasis Wind | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 238.4 GWh | Nov 2004 | Dec 2024 | Wind |
| Mojave 3/4/5 | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 132.8 GWh | Nov 1990 | Dec 2024 | Wind |
| Garnet Wind Energy Center | Terra-Gen Operating Co-Wind | North Palm Springs, CA | California Independent System Operator (CISO) | 11.9 GWh | May 2009 | Dec 2024 | Wind |
| Cameron Ridge LLC | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 144.0 GWh | Nov 1984 | Dec 2024 | Wind |
| Terra-Gen VG Wind LLC | Terra-Gen Operating Co-Wind | Tehachapi, CA | California Independent System Operator (CISO) | 7.6 GWh | Dec 1983 | Jun 2024 | Wind |
| TPC Windfarms LLC | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 46.5 GWh | Nov 1986 | Dec 2024 | Wind |
| Ridgetop | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 145.9 GWh | Mar 1994 | Dec 2024 | Wind |
| Difwind Farms Ltd VI | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 14.9 GWh | Dec 1986 | Dec 2024 | Wind |
| Lockhart Solar PV, LLC | Terra-Gen Operating Co-Solar | Hinkley, CA | California Independent System Operator (CISO) | 242.4 GWh | Nov 1989 | Sep 2025 | Solar |
| SEGS IX | Terra-Gen Operating Co-Solar | Hinkley, CA | California Independent System Operator (CISO) | 112.0 GWh | Aug 1990 | Sep 2024 | Solar |
| Lockhart Solar PV II | Terra-Gen Operating Co-Solar | Hinkley, CA | California Independent System Operator (CISO) | 205.8 GWh | Jun 2023 | Sep 2025 | Solar |
| Edwards Sanborn E3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 55.8 GWh | Nov 2021 | Sep 2025 | Solar |
| Edwards Sanborn E1B | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 355.4 GWh | Oct 2022 | Sep 2025 | Solar |
| Edwards Sanborn E4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 316.3 GWh | Nov 2022 | Sep 2025 | Solar |
| Edwards Sanborn E5 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 155.2 GWh | Nov 2022 | Sep 2025 | Solar |
| Edwards Sanborn S1 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 99.6 GWh | Feb 2022 | Sep 2025 | Solar |
| Edwards Sanborn E1A | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 333.4 GWh | Jul 2022 | Sep 2025 | Solar |
| Edwards Sanborn S3 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 83.4 GWh | Feb 2022 | Sep 2025 | Solar |
| Edwards Sanborn S4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 88.2 GWh | Oct 2022 | Sep 2025 | Solar |
| Edwards Sanborn E2 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 299.6 GWh | Nov 2021 | Sep 2025 | Solar |
| Temescal Canyon RV, LLC | Temescal Canyon RV, LLC | Corona, CA | California Independent System Operator (CISO) | 1.9 GWh | Apr 2011 | Dec 2024 | Solar |
| CBS Television City | Televison City Studios, LLC. | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 977.0 MWh | Jun 2013 | Dec 2024 | Solar |
| CDCR (CA) - Pleasant Valley State Prison | Team-Solar, Inc. | Coalinga, CA | California Independent System Operator (CISO) | 2.8 GWh | Jun 2014 | Dec 2024 | Solar |
| DSH (CA) - Coalinga State Hospital | Team-Solar, Inc. | Coalinga, CA | California Independent System Operator (CISO) | 4.6 GWh | Jun 2014 | Dec 2024 | Solar |
| TA-High Desert LLC | TA-High Desert LLC | Lancaster, CA | California Independent System Operator (CISO) | 56.8 GWh | Feb 2013 | Dec 2024 | Solar |
| Sycamore Energy LLC | Sycamore Energy LLC | Santee, CA | California Independent System Operator (CISO) | 23.1 GWh | Mar 2004 | Dec 2024 | Landfill Gas |
Browse Power Plants By California Counties
Figures are based on September 2025 generation numbers.| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Mendocino County, CA | # 55 | 5 | 12.3 GWh |
| Glenn County, CA | # 54 | 2 | 18.7 GWh |
| Marin County, CA | # 53 | 3 | 19.0 GWh |
| Sierra County, CA | # 52 | 3 | 33.2 GWh |
| Napa County, CA | # 51 | 9 | 51.0 GWh |
| Tehama County, CA | # 50 | 7 | 59.7 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.5 GWh |
| San Francisco County, CA | # 48 | 10 | 84.0 GWh |
| San Mateo County, CA | # 47 | 11 | 133.1 GWh |
| Yolo County, CA | # 46 | 15 | 216.2 GWh |
| Nevada County, CA | # 45 | 12 | 219.1 GWh |
| Siskiyou County, CA | # 44 | 8 | 236.7 GWh |
| Mariposa County, CA | # 43 | 2 | 299.7 GWh |
| San Benito County, CA | # 42 | 6 | 302.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 331.1 GWh |
| Lassen County, CA | # 40 | 9 | 341.0 GWh |
| Humboldt County, CA | # 39 | 10 | 467.8 GWh |
| Calaveras County, CA | # 38 | 6 | 513.9 GWh |
| Merced County, CA | # 37 | 31 | 522.8 GWh |
| Trinity County, CA | # 36 | 5 | 569.3 GWh |
| Amador County, CA | # 35 | 8 | 649.7 GWh |
| Ventura County, CA | # 34 | 32 | 756.5 GWh |
| Mono County, CA | # 33 | 9 | 785.9 GWh |
| Lake County, CA | # 32 | 10 | 905.4 GWh |
| Madera County, CA | # 31 | 28 | 950.7 GWh |
| Inyo County, CA | # 30 | 23 | 1.1 TWh |
| El Dorado County, CA | # 29 | 15 | 1.4 TWh |
| Tulare County, CA | # 28 | 69 | 1.5 TWh |
| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Yuba County, CA | # 27 | 5 | 1.6 TWh |
| Sutter County, CA | # 26 | 8 | 1.8 TWh |
| Plumas County, CA | # 25 | 13 | 1.9 TWh |
| Placer County, CA | # 24 | 24 | 2.0 TWh |
| San Joaquin County, CA | # 23 | 47 | 2.2 TWh |
| Alameda County, CA | # 22 | 47 | 2.5 TWh |
| Tuolumne County, CA | # 21 | 23 | 2.7 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.8 TWh |
| Orange County, CA | # 19 | 59 | 2.9 TWh |
| Colusa County, CA | # 18 | 3 | 2.9 TWh |
| Monterey County, CA | # 17 | 29 | 3.2 TWh |
| Solano County, CA | # 16 | 40 | 3.2 TWh |
| Butte County, CA | # 15 | 25 | 3.4 TWh |
| Santa Clara County, CA | # 14 | 75 | 4.1 TWh |
| Kings County, CA | # 13 | 57 | 4.3 TWh |
| San Diego County, CA | # 12 | 151 | 5.1 TWh |
| Sonoma County, CA | # 11 | 26 | 5.2 TWh |
| Sacramento County, CA | # 10 | 65 | 6.4 TWh |
| Fresno County, CA | # 9 | 119 | 7.6 TWh |
| Shasta County, CA | # 8 | 46 | 7.7 TWh |
| Imperial County, CA | # 7 | 84 | 9.7 TWh |
| San Bernardino County, CA | # 6 | 204 | 12.8 TWh |
| Contra Costa County, CA | # 5 | 56 | 13.2 TWh |
| Riverside County, CA | # 4 | 159 | 14.7 TWh |
| Los Angeles County, CA | # 3 | 308 | 18.9 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.7 TWh |
| Kern County, CA | # 1 | 313 | 34.9 TWh |