Intel Folsom
1900 Prairie City Road, Folsom, CA 95630Plant Summary Information
Intel Folsom is ranked #817 out of 885 solar farms in California in terms of total annual net electricity generation.
Intel Folsom generated 202.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Intel Folsom |
|---|---|
| Utility Name | Tesla Inc. |
| Location | Sacramento County, CA |
| Initial Operation Date | July 2010 |
| Last Update | Dec 2025 |
| Annual Generation | 1.3 GWh |
| Annual Consumption | 4.5 k MMBtu |
| Ranked #11,838 out of 13,081 Power Plants Nationwide | |
| Ranked #6,593 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #1,513 out of 1,606 California Power Plants | |
| Ranked #817 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
SolarCity Corporation (2013 to 2015) Tesla Inc. (2016 to 2025) |
Map of Intel Folsom
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Intel Folsom.
Monthly Net Generation for Intel Folsom
Monthly Plant Fuel Consumption for Intel Folsom
Intel Folsom Details
| Summary Information | |
|---|---|
| Plant Name | Intel Folsom (58086) |
| Plant Address | 1900 Prairie City Road, Folsom, CA 95630 |
| Utility | Tesla Inc. (57313) |
| Latitude, Longitude | 38.64512, -121.173 |
| Generation Dates on File | Jan 2012 to Dec 2025 |
| Initial Operation Date | July 2010 |
| Annual Generation | 1.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Balancing Authority of Northern California (BANC) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Sacramento Municipal Util Dist (16534) CA |
| Grid Voltage | 0.48 kV |
| Energy Storage | No |
Generator 1 Details Operating July 2010
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 0.5 MW |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2010 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 20 |
| DC Net Capacity | 0.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 0.6 MW |
| Virtual Net Metering Agreement | No |
Generator 2 Details Operating July 2010
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 0.5 MW |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2010 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 230 |
| Tilt Angle | 5 |
| DC Net Capacity | 0.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 0.6 MW |
| Virtual Net Metering Agreement | No |
Intel Folsom Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Banyan SolarCity Owner 2010 LLC | 6800 Dumbarton Circle, Fremont, CA 94555 | Generator 1 | 100.00% |
| Banyan SolarCity Owner 2010 LLC | 6800 Dumbarton Circle, Fremont, CA 94555 | Generator 2 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6583 | Sutton Solar 2, LLC CSG | Sutton, MA | 1.3 GWh |
| #6584 | Green Lake Solar | Interlochen, MI | 1.3 GWh |
| #6585 | E. Goenner Project CSG | Clear Lake, MN | 1.3 GWh |
| #6586 | ALDI DC 2 | South Windsor, CT | 1.3 GWh |
| #6587 | MN CSG 2019-77 | Northfield, MN | 1.3 GWh |
| #6588 | CSU Fresno Solar Project | Fresno, CA | 1.3 GWh |
| #6589 | Sudbury Landfill | Sudbury, MA | 1.3 GWh |
| #6590 | Elroy Solar | Mauston, WI | 1.3 GWh |
| #6591 | SCH County - (1E) 398 Anthony St Schenec | Schenectady, NY | 1.3 GWh |
| #6592 | CS Murphy Point, LLC | Murphy, NC | 1.3 GWh |
| #6594 | Kent County - Worton Complex | Worton, MD | 1.3 GWh |
| #6595 | Dinuba Wastewater Treatment Plant | Dinuba, CA | 1.3 GWh |
| #6596 | Afton Solar | Afton, NY | 1.3 GWh |
| #6597 | Summit Water Nexus Mt. Holly, LLC Solar | Lumberton, NJ | 1.3 GWh |
| #6598 | Barneveld Solar | Barneveld, NY | 1.3 GWh |
| #6599 | Webster Solar | Webster, MA | 1.2 GWh |
| #6600 | Conn Mun Electric Energy Coop | Norwich, CT | 1.2 GWh |
| #6601 | Chaberton Solar Greyrock | Pittsville, MD | 1.2 GWh |
| #6602 | MN CSG 2019-105 | Wabash, MN | 1.2 GWh |
| #6603 | Martins Creek Solar NC, LLC | Murphy, NC | 1.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Intel Folsom.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Aerojet I | Rancho Cordova, CA | 6.0 GWh | 2.3 mi |
| Aerojet II | Rancho Cordova, CA | 3.7 GWh | 2.5 mi |
| Blue Shld Of Cal- El Dorado Hlls Mtr B | El Dorado Hills, CA | 2.6 GWh | 5.3 mi |
| Broadridge Cogen | El Dorado Hills, CA | 15.8 GWh | 6.6 mi |
| Deer Creek 2 | Shingle Springs, CA | 2.6 GWh | 10.3 mi |
| Dept of General Services -FTB | Sacramento, CA | 4.8 GWh | 10.7 mi |
| El Dorado Solar, LLC | El Dorado Hills, CA | 3.3 GWh | 6.2 mi |
| FAA NorCal TRACON | Mather AFB, CA | 1.9 GWh | 7.5 mi |
| Folsom | Folsom, CA | 537.6 GWh | 4.3 mi |
| Folsom SP and CSP Sacramento | Represa, CA | 2.3 GWh | 3 mi |
| Intel Folsom Phase 2 | Folsom, CA | 1.5 GWh | 0.5 mi |
| Intel Folsom Phase 3 | Folsom, CA | 9.1 GWh | 0.6 mi |
| Kiefer Landfill | Sloughhouse, CA | 34.6 GWh | 9.2 mi |
| Kiefer Landfill Generating Phase II | Sloughhouse, CA | 30.2 GWh | 9.1 mi |
| McClellan (CA) | Sacramento, CA | 1.2 GWh | 11.9 mi |
| Nimbus | Folsom, CA | 50.6 GWh | 2.6 mi |
| Rancho Cordova Medical Offices | Rancho Cordova, CA | 2.0 GWh | 7.9 mi |
| RE Dillard 1 LLC | Sloughhouse, CA | 4.9 GWh | 12.2 mi |
| RE Dillard 2 LLC | Sloughhouse, CA | 5.9 GWh | 12.4 mi |
| SloughHouse Solar, LLC | SloughHouse, CA | 97.9 GWh | 12.3 mi |