Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Belden | Pacific Gas & Electric Co. | Belden, CA | California Independent System Operator (CISO) | 365.1 GWh | Aug 1969 | Nov 2024 | Water |
Bucks Creek | Pacific Gas & Electric Co. | Storrie, CA | California Independent System Operator (CISO) | 96.0 GWh | Feb 1928 | Mar 2024 | Water |
Butt Valley | Pacific Gas & Electric Co. | Belden, CA | California Independent System Operator (CISO) | 149.3 GWh | Nov 1958 | Dec 2024 | Water |
Caribou 1 | Pacific Gas & Electric Co. | Belden, CA | California Independent System Operator (CISO) | 221.0 GWh | May 1921 | Dec 2024 | Water |
Caribou 2 | Pacific Gas & Electric Co. | Belden, CA | California Independent System Operator (CISO) | 338.4 GWh | Oct 1958 | Apr 2025 | Water |
Coleman PH | Pacific Gas & Electric Co. | Anderson, CA | California Independent System Operator (CISO) | 26.6 GWh | May 1979 | Dec 2024 | Water |
James B Black | Pacific Gas & Electric Co. | Big Bend, CA | California Independent System Operator (CISO) | 432.7 GWh | Nov 1965 | Apr 2025 | Water |
De Sabla | Pacific Gas & Electric Co. | Magalia, CA | California Independent System Operator (CISO) | 23.0 GWh | Jan 1963 | Dec 2024 | Water |
Drum 1 | Pacific Gas & Electric Co. | Alta, CA | California Independent System Operator (CISO) | 46.4 GWh | Oct 1913 | Oct 2024 | Water |
Drum 2 | Pacific Gas & Electric Co. | Alta, CA | California Independent System Operator (CISO) | 148.6 GWh | Nov 1965 | Dec 2024 | Water |
Dutch Flat | Pacific Gas & Electric Co. | Alta, CA | California Independent System Operator (CISO) | 27.1 GWh | Feb 1943 | Dec 2024 | Water |
Electra | Pacific Gas & Electric Co. | Jackson, CA | California Independent System Operator (CISO) | 244.8 GWh | May 1948 | Apr 2025 | Water |
Haas | Pacific Gas & Electric Co. | Balch Camp, CA | California Independent System Operator (CISO) | 427.9 GWh | Nov 1958 | Apr 2025 | Water |
Halsey | Pacific Gas & Electric Co. | Auburn, CA | California Independent System Operator (CISO) | 7.6 GWh | Nov 1916 | Oct 2024 | Water |
Hat Creek 1 | Pacific Gas & Electric Co. | Burney, CA | California Independent System Operator (CISO) | 26.8 GWh | Jul 1921 | Dec 2024 | Water |
Hat Creek 2 | Pacific Gas & Electric Co. | Burney, CA | California Independent System Operator (CISO) | 26.0 GWh | Aug 1921 | Dec 2024 | Water |
Humboldt Bay | Pacific Gas & Electric Co. | Eureka, CA | California Independent System Operator (CISO) | 365.1 GWh | Aug 2010 | Apr 2025 | Natural Gas : 99.6% |
Huron Solar Station | Pacific Gas & Electric Co. | Huron, CA | California Independent System Operator (CISO) | 28.8 GWh | May 2012 | Dec 2024 | Solar |
Colusa Generating Station | Pacific Gas & Electric Co. | Maxwell, CA | California Independent System Operator (CISO) | 2.7 TWh | Nov 2010 | Apr 2025 | Natural Gas |
Vaca Dixon Solar Station | Pacific Gas & Electric Co. | Vacaville, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2009 | Dec 2024 | Solar |
Stroud Solar Station | Pacific Gas & Electric Co. | Helm, CA | California Independent System Operator (CISO) | 25.0 GWh | Aug 2011 | Oct 2024 | Solar |
Five Points Solar Station | Pacific Gas & Electric Co. | Five Points, CA | California Independent System Operator (CISO) | 15.4 GWh | Aug 2011 | Dec 2024 | Solar |
Westside Solar Station | Pacific Gas & Electric Co. | Five Points, CA | California Independent System Operator (CISO) | 13.9 GWh | Jul 2011 | Dec 2024 | Solar |
Diablo Canyon | Pacific Gas & Electric Co. | Avila Beach, CA | California Independent System Operator (CISO) | 18.4 TWh | Apr 1985 | Apr 2025 | Nuclear |
Giffen | Pacific Gas & Electric Co. | TBD, CA | California Independent System Operator (CISO) | 13.6 GWh | May 2012 | Dec 2024 | Solar |
Cantua Solar Station | Pacific Gas & Electric Co. | TBD, CA | California Independent System Operator (CISO) | 31.2 GWh | May 2012 | Dec 2024 | Solar |
Wise | Pacific Gas & Electric Co. | Auburn, CA | California Independent System Operator (CISO) | 31.5 GWh | Feb 1917 | Oct 2024 | Water |
Toadtown | Pacific Gas & Electric Co. | Magalia, CA | California Independent System Operator (CISO) | 2.4 GWh | Mar 1986 | Oct 2024 | Water |
Kerckhoff 2 | Pacific Gas & Electric Co. | Auberry, CA | California Independent System Operator (CISO) | 407.9 GWh | Apr 1983 | Apr 2025 | Water |
Newcastle | Pacific Gas & Electric Co. | Auburn, CA | California Independent System Operator (CISO) | 7.5 GWh | Nov 1986 | Dec 2024 | Water |
A G Wishon | Pacific Gas & Electric Co. | North Fork, CA | California Independent System Operator (CISO) | 21.6 GWh | Aug 1910 | Dec 2024 | Water |
West Gates Solar Station | Pacific Gas & Electric Co. | Huron, CA | California Independent System Operator (CISO) | 19.2 GWh | Apr 2013 | Dec 2024 | Solar |
Gates Solar Station | Pacific Gas & Electric Co. | Huron, CA | California Independent System Operator (CISO) | 31.7 GWh | May 2013 | Dec 2024 | Solar |
Guernsey Solar Station | Pacific Gas & Electric Co. | Hanford, CA | California Independent System Operator (CISO) | 22.7 GWh | Jul 2013 | Dec 2024 | Solar |
Oxnard Wastewater Treatment Plant | Oxnard City of | Oxnard, CA | California Independent System Operator (CISO) | 4.5 GWh | Jul 1981 | Apr 2025 | Other Biomass Gas : 94.0% Natural Gas : 6.0% |
Otay Mesa Generating Project | Otay Mesa Energy Center LLC | San Diego, CA | California Independent System Operator (CISO) | 2.2 TWh | Sep 2009 | Apr 2025 | Natural Gas |
Ormond Beach | Ormond Beach Power, LLC | Oxnard, CA | California Independent System Operator (CISO) | 50.3 GWh | Jul 1971 | Apr 2025 | Natural Gas |
Ormesa III | Ormat Nevada Inc | Holtville, CA | Imperial Irrigation District (IID) | 44.4 GWh | Apr 1989 | Dec 2024 | Geothermal |
Ormesa II | Ormat Nevada Inc | Holtville, CA | Imperial Irrigation District (IID) | 131.7 GWh | Apr 1989 | Dec 2024 | Geothermal |
North Brawley Geothermal Plant | Ormat Nevada Inc | Brawley, CA | Imperial Irrigation District (IID) | 16.9 GWh | Sep 2009 | Dec 2024 | Geothermal |
Mammoth G3 | Ormat Nevada Inc | Mammoth Lakes, CA | California Independent System Operator (CISO) | 103.1 GWh | Nov 1990 | Dec 2024 | Geothermal |
Mammoth G1 | Ormat Nevada Inc | Mammoth lakes, CA | California Independent System Operator (CISO) | 59.6 GWh | Nov 1984 | Dec 2024 | Geothermal |
Mammoth G2 | Ormat Nevada Inc | Mammoth Lakes, CA | California Independent System Operator (CISO) | 82.3 GWh | Nov 1990 | Dec 2024 | Geothermal |
Ormesa I | Ormat Nevada Inc | Holtville, CA | Imperial Irrigation District (IID) | 70.2 GWh | Nov 1986 | Dec 2024 | Geothermal |
Orion Solar II | Orion Solar II, LLC | Arvin, CA | California Independent System Operator (CISO) | 19.0 GWh | May 2014 | Dec 2024 | Solar |
Orion Solar I | Orion Solar I LLC | Arvin, CA | California Independent System Operator (CISO) | 28.3 GWh | Mar 2014 | Dec 2024 | Solar |
OES Biogas Power | Organic Energy Solutions, Inc. | San Bernardino, CA | California Independent System Operator (CISO) | 4.9 GWh | - | Dec 2024 | Other Biomass Gas |
Second Imperial Geothermal | ORCAL Geothermal, Inc | Heber, CA | Imperial Irrigation District (IID) | 302.3 GWh | May 1993 | Dec 2024 | Geothermal |
Heber Geothermal | ORCAL Geothermal, Inc | Heber, CA | Imperial Irrigation District (IID) | 384.9 GWh | May 1985 | Dec 2024 | Geothermal |
Orange Grove Peaking Facility | Orange Grove Energy LP | Pala, CA | California Independent System Operator (CISO) | 23.6 GWh | May 2010 | Dec 2024 | Natural Gas |
Kings River Syphon | Orange Cove Irrigation District | Sanger, CA | California Independent System Operator (CISO) | 325.0 MWh | Aug 1990 | May 2024 | Water |
Plant No 1 Orange County | Orange County Sanitation Dist | Fountain Valley, CA | California Independent System Operator (CISO) | 40.3 GWh | May 1993 | Dec 2024 | Other Biomass Gas : 80.1% Natural Gas : 19.9% |
Plant No 2 Orange County | Orange County Sanitation Dist | Huntington Beach, CA | California Independent System Operator (CISO) | 59.3 GWh | May 1993 | Dec 2024 | Other Biomass Gas : 73.9% Natural Gas : 26.1% |
SeaWorld Aquatica | Onyx Asset Services Group | Chula Vista, CA | California Independent System Operator (CISO) | 1.9 GWh | Apr 2018 | Dec 2023 | Solar |
RE Kansas Solar, LLC | Onward Energy | Lemoore, CA | California Independent System Operator (CISO) | 35.7 GWh | Nov 2014 | Dec 2024 | Solar |
RE Adams East, LLC | Onward Energy | Fresno, CA | California Independent System Operator (CISO) | 39.3 GWh | Nov 2014 | Dec 2024 | Solar |
Alamo Solar | Onward Energy | Oro Grande, CA | California Independent System Operator (CISO) | 47.7 GWh | Apr 2015 | Dec 2024 | Solar |
Cottonwood Solar, LLC Cottonwood Carport | Onward Energy | Novato, CA | California Independent System Operator (CISO) | 1.8 GWh | Apr 2016 | Dec 2024 | Solar |
RE Camelot LLC | Onward Energy | Mojave, CA | California Independent System Operator (CISO) | 125.1 GWh | Nov 2014 | Dec 2024 | Solar |
TA-Acacia, LLC | Onward Energy | Lancaster, CA | California Independent System Operator (CISO) | 52.0 GWh | Oct 2014 | Dec 2024 | Solar |
Catalina Solar 2, LLC | Onward Energy | Rosamond, CA | California Independent System Operator (CISO) | 52.8 GWh | Jul 2015 | Dec 2024 | Solar |
RE Kent South, LLC | Onward Energy | Lemoore, CA | California Independent System Operator (CISO) | 44.3 GWh | Nov 2014 | Dec 2024 | Solar |
Imperial Valley Solar Co (IVSC) 2, LLC | Onward Energy | Niland, CA | Imperial Irrigation District (IID) | 46.2 GWh | May 2015 | Dec 2024 | Solar |
RE Old River One, LLC | Onward Energy | Bakersfield, CA | California Independent System Operator (CISO) | 35.6 GWh | Nov 2014 | Dec 2024 | Solar |
Cottonwood Solar, LLC (Goose Lake) | Onward Energy | Lost Hills, CA | California Independent System Operator (CISO) | 31.5 GWh | Apr 2015 | Dec 2024 | Solar |
Maricopa West Solar PV, LLC | Onward Energy | Taft, CA | California Independent System Operator (CISO) | 47.6 GWh | Nov 2015 | Dec 2024 | Solar |
CID Solar, LLC | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 45.0 GWh | Nov 2014 | Dec 2024 | Solar |
RE Columbia Two, LLC | Onward Energy | Mojave, CA | California Independent System Operator (CISO) | 40.4 GWh | Nov 2014 | Dec 2024 | Solar |
Cottonwood Solar, LLC (City of Corcoran) | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 22.9 GWh | Apr 2015 | Dec 2024 | Solar |
One Ten Partners PV | One Ten Partners, LLC | Palmdale, CA | California Independent System Operator (CISO) | 6.1 GWh | Aug 2017 | Dec 2024 | Solar |
Olsen | Olsen Power Partners | Whitmore, CA | California Independent System Operator (CISO) | 13.5 GWh | Dec 1989 | Dec 2024 | Water |
Agnews Power Plant | OLS Energy-Agnews Inc. | San Jose, CA | California Independent System Operator (CISO) | 10.3 GWh | Oct 1990 | Dec 2024 | Natural Gas |
Rio Bravo Hydro Project | Olcese Water District | Bakersfield, CA | California Independent System Operator (CISO) | 34.6 GWh | Apr 1989 | Oct 2024 | Water |
OK Produce Fresno Carport | OK Produce | Fresno, CA | California Independent System Operator (CISO) | 3.6 GWh | Dec 2018 | Dec 2024 | Solar |
Occidental College Solar Project | Occidental College | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 1.3 GWh | Jan 2013 | Dec 2024 | Solar |
Oakley Solar Project | Oakley Solar Project LLC | Oakley, CA | California Independent System Operator (CISO) | 2.4 GWh | May 2013 | Dec 2023 | Solar |
Beardsley | Oakdale&South San Joaquin Irrigation D. | None, CA | California Independent System Operator (CISO) | 55.7 GWh | Apr 1957 | Dec 2024 | Water |
Donnells | Oakdale&South San Joaquin Irrigation D. | None, CA | California Independent System Operator (CISO) | 219.2 GWh | May 1957 | Dec 2024 | Water |
Tulloch | Oakdale&South San Joaquin Irrigation D. | Jamestown, CA | California Independent System Operator (CISO) | 103.6 GWh | May 1958 | Dec 2024 | Water |
Solar Borrego I | NRG Solar Borrego I | Borrego Springs, CA | California Independent System Operator (CISO) | 62.2 GWh | Jan 2013 | Dec 2024 | Solar |
Solar Blythe 2 | NRG Solar Blythe II LLC | Blythe, CA | California Independent System Operator (CISO) | 38.1 GWh | Mar 2017 | Dec 2024 | Solar |
Solar Blythe LLC | NRG Solar Blythe | Blythe, CA | California Independent System Operator (CISO) | 41.8 GWh | Nov 2009 | Dec 2024 | Solar |
El Segundo Energy Center LLC | NRG Energy Services LLC | El Segundo, CA | California Independent System Operator (CISO) | 141.2 GWh | Jun 2013 | Apr 2025 | Natural Gas |
Ivanpah 3 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 261.8 GWh | Nov 2013 | Apr 2025 | Solar : 96.2% Natural Gas : 3.8% |
Ivanpah 1 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 179.1 GWh | Nov 2013 | Apr 2025 | Solar : 96.4% Natural Gas : 3.6% |
Ivanpah 2 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 276.7 GWh | Nov 2013 | Apr 2025 | Solar : 95.9% Natural Gas : 4.1% |
Carlsbad Energy Center | NRG California Peaker Operations LLC | Carlsbad, CA | California Independent System Operator (CISO) | 259.1 GWh | Nov 2018 | Apr 2025 | Natural Gas |
Lodi Energy Center | Northern California Power Agny | Lodi, CA | California Independent System Operator (CISO) | 785.1 GWh | Oct 2012 | Mar 2025 | Natural Gas |
Spicer Meadow Project | Northern California Power Agny | Murphys, CA | California Independent System Operator (CISO) | 21.6 GWh | Oct 1989 | Dec 2024 | Water |
Collierville Powerhouse | Northern California Power Agny | Murphys, CA | California Independent System Operator (CISO) | 465.2 GWh | Oct 1989 | Apr 2025 | Water |
Lodi | Northern California Power Agny | Lodi, CA | California Independent System Operator (CISO) | 2.8 GWh | Jan 1986 | Dec 2024 | Natural Gas |
Alameda | Northern California Power Agny | Alameda, CA | California Independent System Operator (CISO) | 3.1 GWh | Apr 1986 | Dec 2024 | Natural Gas |
Combustion Turbine Project No 2 | Northern California Power Agny | Lodi, CA | California Independent System Operator (CISO) | 8.3 GWh | Mar 1996 | Dec 2024 | Natural Gas |
Geothermal 1 | Northern California Power Agny | Middletown, CA | California Independent System Operator (CISO) | 402.6 GWh | Dec 1982 | Apr 2025 | Geothermal |
Geothermal 2 | Northern California Power Agny | Middletown, CA | California Independent System Operator (CISO) | 303.9 GWh | Nov 1985 | Apr 2025 | Geothermal |
North Sky River Energy LLC | North Sky River Energy LLC | Weldon, CA | California Independent System Operator (CISO) | 435.0 GWh | Nov 2012 | Dec 2024 | Wind |
North Rosamond Solar LLC | North Rosamond Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 398.4 GWh | May 2019 | Apr 2025 | Solar |
Coram Tehachapi | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 55.4 GWh | Aug 1992 | Dec 2024 | Wind |
Windstar 1 | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 263.0 GWh | Jan 2012 | Dec 2024 | Wind |
Coram Energy LLC (ECT) | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 17.6 GWh | Apr 2005 | Dec 2024 | Wind |
Browse Power Plants By California Counties
Figures are based on December 2024 generation numbers.County | State Rank | Active Plants | Dec 2024 Generation |
---|---|---|---|
Mendocino County, CA | # 55 | 5 | 12.3 GWh |
Glenn County, CA | # 54 | 2 | 18.7 GWh |
Marin County, CA | # 53 | 3 | 19.0 GWh |
Sierra County, CA | # 52 | 3 | 31.1 GWh |
Napa County, CA | # 51 | 9 | 49.2 GWh |
Santa Cruz County, CA | # 50 | 6 | 56.2 GWh |
Tehama County, CA | # 49 | 7 | 59.7 GWh |
San Francisco County, CA | # 48 | 10 | 85.0 GWh |
San Mateo County, CA | # 47 | 10 | 133.4 GWh |
Nevada County, CA | # 46 | 12 | 207.0 GWh |
Yolo County, CA | # 45 | 15 | 222.2 GWh |
Siskiyou County, CA | # 44 | 8 | 242.5 GWh |
Mariposa County, CA | # 43 | 2 | 299.7 GWh |
Santa Barbara County, CA | # 42 | 18 | 327.1 GWh |
San Benito County, CA | # 41 | 6 | 332.7 GWh |
Lassen County, CA | # 40 | 9 | 341.0 GWh |
Merced County, CA | # 39 | 30 | 418.2 GWh |
Humboldt County, CA | # 38 | 10 | 480.9 GWh |
Trinity County, CA | # 37 | 5 | 573.8 GWh |
Calaveras County, CA | # 36 | 6 | 613.6 GWh |
Amador County, CA | # 35 | 8 | 666.5 GWh |
Mono County, CA | # 34 | 9 | 785.9 GWh |
Ventura County, CA | # 33 | 32 | 828.4 GWh |
Lake County, CA | # 32 | 10 | 921.2 GWh |
Madera County, CA | # 31 | 28 | 994.0 GWh |
Tulare County, CA | # 30 | 68 | 1.0 TWh |
Inyo County, CA | # 29 | 23 | 1.2 TWh |
El Dorado County, CA | # 28 | 15 | 1.5 TWh |
County | State Rank | Active Plants | Dec 2024 Generation |
---|---|---|---|
Yuba County, CA | # 27 | 5 | 1.7 TWh |
Sutter County, CA | # 26 | 8 | 1.8 TWh |
Plumas County, CA | # 25 | 13 | 2.0 TWh |
Placer County, CA | # 24 | 23 | 2.1 TWh |
San Joaquin County, CA | # 23 | 45 | 2.3 TWh |
Alameda County, CA | # 22 | 46 | 2.4 TWh |
Stanislaus County, CA | # 21 | 25 | 2.6 TWh |
Colusa County, CA | # 20 | 3 | 2.9 TWh |
Tuolumne County, CA | # 19 | 23 | 3.0 TWh |
Solano County, CA | # 18 | 40 | 3.0 TWh |
Orange County, CA | # 17 | 59 | 3.2 TWh |
Monterey County, CA | # 16 | 29 | 3.7 TWh |
Butte County, CA | # 15 | 25 | 3.8 TWh |
Kings County, CA | # 14 | 57 | 4.1 TWh |
Santa Clara County, CA | # 13 | 74 | 4.4 TWh |
San Diego County, CA | # 12 | 150 | 5.0 TWh |
Sonoma County, CA | # 11 | 26 | 5.2 TWh |
Sacramento County, CA | # 10 | 64 | 6.4 TWh |
Shasta County, CA | # 9 | 46 | 7.2 TWh |
Fresno County, CA | # 8 | 109 | 8.1 TWh |
Imperial County, CA | # 7 | 84 | 9.7 TWh |
Contra Costa County, CA | # 6 | 56 | 13.4 TWh |
San Bernardino County, CA | # 5 | 203 | 13.4 TWh |
Riverside County, CA | # 4 | 159 | 14.3 TWh |
San Luis Obispo County, CA | # 3 | 22 | 20.6 TWh |
Los Angeles County, CA | # 2 | 307 | 20.7 TWh |
Kern County, CA | # 1 | 311 | 34.0 TWh |