Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Chili Bar | Sacramento Municipal Util Dist | Placerville, CA | California Independent System Operator (CISO) | 25.2 GWh | Feb 1965 | Dec 2025 | Water |
| White Rock/Slab Creek | Sacramento Municipal Util Dist | Placerville, CA | Balancing Authority of Northern California (BANC) | 446.1 GWh | Jan 1968 | May 2026 | Water |
| Campbell Power Plant | Sacramento Municipal Util Dist | Sacramento, CA | Balancing Authority of Northern California (BANC) | 504.9 GWh | Nov 1997 | May 2026 | Natural Gas |
| Procter & Gamble Power Plant | Sacramento Municipal Util Dist | Sacramento, CA | Balancing Authority of Northern California (BANC) | 518.7 GWh | Feb 1997 | May 2026 | Natural Gas |
| Carson Power Plant | Sacramento Municipal Util Dist | Sacramento, CA | Balancing Authority of Northern California (BANC) | 83.0 GWh | Sep 1995 | May 2026 | Natural Gas : 97.4% Other Biomass Gas : 2.6% |
| Solano Wind | Sacramento Municipal Util Dist | Rio Vista, CA | California Independent System Operator (CISO) | 723.8 GWh | May 1994 | May 2026 | Wind |
| Camino | Sacramento Municipal Util Dist | Camino, CA | Balancing Authority of Northern California (BANC) | 293.9 GWh | Sep 1963 | May 2026 | Water |
| Cosumnes Power Plant | Sacramento Municipal Util Dist | Herald, CA | Balancing Authority of Northern California (BANC) | 3.1 TWh | Jan 2006 | May 2026 | Natural Gas : 98.9% Other Biomass Gas : 1.1% |
| Jaybird | Sacramento Municipal Util Dist | Camino, CA | Balancing Authority of Northern California (BANC) | 454.3 GWh | Mar 1961 | May 2026 | Water |
| McClellan (CA) | Sacramento Municipal Util Dist | Sacramento, CA | Balancing Authority of Northern California (BANC) | 1.2 GWh | Feb 1986 | Dec 2025 | Natural Gas |
| Union Valley | Sacramento Municipal Util Dist | Fresh Pond, CA | Balancing Authority of Northern California (BANC) | 89.1 GWh | Sep 1963 | Dec 2025 | Water |
| Jones Fork | Sacramento Municipal Util Dist | Fresh Pond, CA | Balancing Authority of Northern California (BANC) | 14.9 GWh | May 1985 | Dec 2025 | Water |
| Kiefer Landfill | Sacramento County of Dpt Waste | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 34.6 GWh | Nov 1999 | Dec 2025 | Landfill Gas |
| Panoche Valley Solar Farm | RWE Clean Energy | Paicines, CA | California Independent System Operator (CISO) | 239.9 GWh | Dec 2017 | May 2026 | Solar |
| CED Ducor 2 | RWE Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 51.6 GWh | Nov 2016 | Dec 2025 | Solar |
| Atwell Island West Solar | RWE Clean Energy | Alpaugh, CA | California Independent System Operator (CISO) | 51.9 GWh | Apr 2015 | Dec 2025 | Solar |
| Corcoran Solar 2 | RWE Clean Energy | Corcoran, CA | California Independent System Operator (CISO) | 46.8 GWh | Apr 2015 | Dec 2025 | Solar |
| White River Solar 2 | RWE Clean Energy | Alpaugh, CA | California Independent System Operator (CISO) | 49.2 GWh | Aug 2014 | Dec 2025 | Solar |
| Wistaria Ranch Solar | RWE Clean Energy | Calexico, CA | California Independent System Operator (CISO) | 271.3 GWh | Nov 2018 | May 2026 | Solar |
| Great Valley Solar Portfolio Holdings, L | RWE Clean Energy | Cantua Creek, CA | California Independent System Operator (CISO) | 491.5 GWh | Nov 2017 | May 2026 | Solar |
| Blackwell Solar Park | RWE Clean Energy | Lost Hills, CA | California Independent System Operator (CISO) | 39.0 GWh | Dec 2018 | Dec 2025 | Solar |
| Corcoran Solar | RWE Clean Energy | Corcoran, CA | California Independent System Operator (CISO) | 22.1 GWh | Jul 2013 | Dec 2025 | Solar |
| White River Solar | RWE Clean Energy | Alpaugh, CA | California Independent System Operator (CISO) | 36.1 GWh | Jun 2013 | Dec 2025 | Solar |
| Fifth Standard Solar PV, LLC (Hybrid) | RWE Clean Energy | Huron, CA | California Independent System Operator (CISO) | 338.5 GWh | Aug 2023 | May 2026 | Solar |
| Alpaugh 50 | RWE Clean Energy | Alpaugh, CA | California Independent System Operator (CISO) | 57.3 GWh | Nov 2012 | Dec 2025 | Solar |
| Corcoran Solar 3 | RWE Clean Energy | Corcoran, CA | California Independent System Operator (CISO) | 48.1 GWh | Jan 2016 | Dec 2025 | Solar |
| CED Ducor 4 | RWE Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 51.8 GWh | Nov 2016 | Dec 2025 | Solar |
| Desert Hot Springs Solar | RWE Clean Energy | Desert Hot Springs, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2013 | Dec 2025 | Solar |
| CED Avenal | RWE Clean Energy | Avenal, CA | California Independent System Operator (CISO) | 16.0 GWh | Dec 2016 | Dec 2025 | Solar |
| CED Ducor 1 | RWE Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 52.3 GWh | Nov 2016 | Dec 2025 | Solar |
| Oro Loma | RWE Clean Energy | Oro Loma, CA | California Independent System Operator (CISO) | 49.2 GWh | Dec 2016 | Dec 2025 | Solar |
| Alpaugh North | RWE Clean Energy | Alpaugh, CA | California Independent System Operator (CISO) | 21.1 GWh | Nov 2012 | Dec 2025 | Solar |
| CED Ducor 3 | RWE Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 38.4 GWh | Nov 2016 | Dec 2025 | Solar |
| Northern Orchard Solar PV, LLC | RWE Clean Energy | Taft, CA | California Independent System Operator (CISO) | 366.4 GWh | Jun 2025 | May 2026 | Solar |
| Russell City Energy Center | Russell City Energy Company LLC | Hayward, CA | California Independent System Operator (CISO) | 1.7 TWh | Jul 2013 | May 2026 | Natural Gas |
| East Cleveland Road Solar | RPCA Solar 7, LLC | El Nido, CA | California Independent System Operator (CISO) | 5.9 GWh | Jan 2025 | Dec 2025 | Solar |
| Byron Highway Solar | RPCA Solar 3, LLC | Byron, CA | California Independent System Operator (CISO) | 12.0 GWh | Oct 2022 | Dec 2025 | Solar |
| Avenue 26 Solar | RPCA Solar 1, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 13.3 GWh | Oct 2024 | Dec 2025 | Solar |
| American Canyon Solar | RP Napa Solar 1, LLC | American Canyon, CA | California Independent System Operator (CISO) | 6.0 GWh | Aug 2019 | Dec 2025 | Solar |
| Roseburg Forest Products Biomass | Roseburg Forest Products | Weed, CA | PacifiCorp West (PACW) | 48.9 GWh | Nov 1989 | Dec 2025 | Wood/Wood Waste Solids |
| Riverside RWQCP Fuel Cell | Riverside Fuel Cell, LLC | Riverside, CA | California Independent System Operator (CISO) | 8.5 GWh | Jul 2016 | Dec 2024 | Other Biomass Gas : 83.8% Natural Gas : 16.2% |
| Rising Tree Wind Farm | Rising Tree Wind Farm LLC | Mojave, CA | California Independent System Operator (CISO) | 250.4 GWh | Dec 2014 | Dec 2025 | Wind |
| Rising Tree Wind Farm III | Rising Tree Wind Farm III LLC | Mojave, CA | California Independent System Operator (CISO) | 260.1 GWh | May 2015 | Dec 2025 | Wind |
| Rising Tree Wind Farm II | Rising Tree Wind Farm II LLC | Mojave, CA | California Independent System Operator (CISO) | 53.7 GWh | Dec 2014 | Dec 2025 | Wind |
| Rio Vista Solar | Rio Vista Executive Boat & RV Storage, LLC | Rio Vista, CA | California Independent System Operator (CISO) | 3.1 GWh | Mar 2025 | Dec 2025 | Solar |
| Rio Bravo Rocklin | Rio Bravo Rocklin | Lincoln, CA | California Independent System Operator (CISO) | 147.0 GWh | May 1989 | Dec 2025 | Wood/Wood Waste Solids : 99.0% Natural Gas : 1.0% |
| Resurgence Solar II | Resurgence Solar II | Boron, CA | California Independent System Operator (CISO) | 133.2 GWh | Jul 2023 | May 2026 | Solar |
| Resurgence Solar | Resurgence Solar | Boron, CA | California Independent System Operator (CISO) | 246.3 GWh | Jul 2023 | May 2026 | Solar |
| Danell Bros Inc | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 5.6 GWh | Aug 2021 | Dec 2025 | Solar |
| Open Sky Dairy | Renewable Solar, Inc | Riverdale, CA | California Independent System Operator (CISO) | 418.8 MWh | Jun 2024 | Dec 2025 | Solar |
| Allied Potato | Renewable Solar, Inc | Bakersfield, CA | California Independent System Operator (CISO) | 309.9 MWh | Apr 2025 | Dec 2025 | Solar |
| River Ranch Dairy | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 995.0 MWh | May 2024 | Dec 2025 | Solar |
| Avalon Dairy | Renewable Solar, Inc | Wasco, CA | California Independent System Operator (CISO) | 792.0 MWh | Aug 2024 | Dec 2025 | Solar |
| Superior Almond Hulling | Renewable Solar, Inc | Cantua Creek, CA | California Independent System Operator (CISO) | 472.0 MWh | Aug 2024 | Dec 2025 | Solar |
| Dover Dairy | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 2.1 GWh | Apr 2022 | Dec 2025 | Solar |
| Zonneveld Oak Grove | Renewable Solar, Inc | Laton, CA | California Independent System Operator (CISO) | 388.0 MWh | May 2024 | Dec 2025 | Solar |
| Vulcan San Emidio Solar | Renew Solar VMC LLC | Bakersfield, CA | California Independent System Operator (CISO) | 3.8 GWh | Feb 2023 | Dec 2024 | Solar |
| Regulus Solar Project | Regulus Solar, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 149.7 GWh | Oct 2014 | Dec 2025 | Solar |
| Sutter Home Winery TCC | REC SHW, LLC | Paso Robles, CA | California Independent System Operator (CISO) | 1.7 GWh | Apr 2024 | Dec 2025 | Solar |
| Sutter Home Winery Westside | REC SHW, LLC | Lodi, CA | California Independent System Operator (CISO) | 295.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Kern Del Oro | REC KDO, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2024 | Dec 2025 | Solar |
| Central San | REC CSD, LLC | Martinez, CA | California Independent System Operator (CISO) | 3.0 GWh | Dec 2024 | Dec 2025 | Solar |
| RE-VFO LLC | RE-VFO LLC | Visalia, CA | California Independent System Operator (CISO) | 1.8 GWh | Apr 2009 | Dec 2025 | Solar |
| Mustang Two | RE Mustang Two LLC | Lemoore, CA | California Independent System Operator (CISO) | 372.7 GWh | Oct 2020 | Apr 2026 | Solar |
| RE Kansas South LLC | RE Kansas South LLC | Lemoore, CA | California Independent System Operator (CISO) | 50.5 GWh | May 2013 | Dec 2025 | Solar |
| RE Gaskell West 5 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 48.0 GWh | Apr 2023 | Dec 2025 | Solar |
| RE Gaskell West 4 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 47.5 GWh | Apr 2023 | Dec 2025 | Solar |
| RE Gaskell West 3 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 50.8 GWh | Apr 2023 | Dec 2025 | Solar |
| RE Gaskell West 2 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 123.9 GWh | Apr 2023 | May 2026 | Solar |
| RE Barren Ridge 1 | RE Barren Ridge 1, LLC | Mojave, CA | Los Angeles Department of Water and Power (LDWP) | 164.4 GWh | Jul 2016 | Dec 2025 | Solar |
| RE Astoria | RE Astoria LLC | Rosamond, CA | California Independent System Operator (CISO) | 187.0 GWh | Nov 2016 | May 2026 | Solar |
| RE Astoria 2 | RE Astoria 2 LLC | Rosamond, CA | California Independent System Operator (CISO) | 177.2 GWh | Nov 2016 | May 2026 | Solar |
| Rancho Seco Solar, LLC | Rancho Seco Solar, LLC | Herald, CA | Balancing Authority of Northern California (BANC) | 18.0 GWh | Jul 2016 | Dec 2025 | Solar |
| Rancho Seco Solar II, LLC | Rancho Seco Solar II, LLC | Twin Cities, CA | Balancing Authority of Northern California (BANC) | 262.4 GWh | Jan 2021 | May 2026 | Solar |
| Kroger La Habra | Ralph's Grocery Company | La Habra, CA | California Independent System Operator (CISO) | 1.7 GWh | Mar 2020 | Dec 2024 | Solar |
| W Plant | Qualcomm Incorporated | San Diego, CA | California Independent System Operator (CISO) | 18.4 GWh | Jun 2005 | May 2026 | Natural Gas |
| PVN Milliken, LLC | PVN Milliken, LLC | Ontario, CA | California Independent System Operator (CISO) | 5.1 GWh | May 2017 | Dec 2025 | Solar |
| Proxima | Proxima Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 464.5 GWh | Mar 2024 | May 2026 | Solar |
| Chatsworth Industrial Center 1-SLLAX601 | Prologis Logistics Services Incorporated | Chatsworth, CA | California Independent System Operator (CISO) | 132.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Tracy 18 - SLCVA418 | Prologis Logistics Services Incorporated | Tracy, CA | California Independent System Operator (CISO) | 182.0 MWh | Sep 2025 | Dec 2025 | Solar |
| IPC 25 Solar | Prologis Logistics Services Incorporated | Tracy, CA | California Independent System Operator (CISO) | 4.9 GWh | Jun 2024 | Dec 2025 | Solar |
| CPA Wilmington 1 | Prologis Logistics Services Incorporated | Carson, CA | California Independent System Operator (CISO) | 1.1 GWh | Jul 2025 | Dec 2025 | Solar |
| CPA 2132 E Dominguez | Prologis Logistics Services Incorporated | Carson, CA | California Independent System Operator (CISO) | 913.0 MWh | Jul 2025 | Dec 2025 | Solar |
| Mountain View Ind Park 1-sline001 | Prologis Logistics Services Incorporated | Fontana, CA | California Independent System Operator (CISO) | 371.0 MWh | Aug 2023 | Dec 2025 | Solar |
| Oxnard | Procter&Gamble Paper Products Co-Oxnard | Oxnard, CA | California Independent System Operator (CISO) | 425.0 GWh | Jun 1982 | May 2026 | Natural Gas |
| Medline Ind. Phase 2 Tracy | Powerflex | Tracy, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Aug 2025 | Solar |
| Prologis L.P | Powerflex | Tracy, CA | California Independent System Operator (CISO) | 5.9 GWh | Jul 2018 | Dec 2025 | Solar |
| Potrero Hills Energy Producers | Potrero Hills Energy Producers, LLC | Suisun City, CA | California Independent System Operator (CISO) | 55.9 GWh | Mar 2016 | Dec 2025 | Landfill Gas |
| Portal Ridge Solar C, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 28.6 GWh | Jan 2017 | Dec 2025 | Solar |
| Portal Ridge Solar B, LLC | Portal Ridge Solar, LLC | Lancaster, CA | California Independent System Operator (CISO) | 52.7 GWh | Jan 2017 | Dec 2025 | Solar |
| PSREC/SIAD Solar | Plumas Sierra Rural Electric Coop | Herlong, CA | California Independent System Operator (CISO) | 5.6 GWh | Aug 2018 | Dec 2025 | Solar |
| High Sierra Cogeneration Plant | Plumas Sierra Rural Electric Coop | Susanville, CA | California Independent System Operator (CISO) | 33.2 GWh | Jan 2010 | Dec 2025 | Natural Gas |
| Ralston | Placer County Water Agency - (CA) | Foresthill, CA | California Independent System Operator (CISO) | 302.6 GWh | Sep 1966 | Dec 2025 | Water |
| Oxbow (CA) | Placer County Water Agency - (CA) | Foresthill, CA | California Independent System Operator (CISO) | 23.2 GWh | Sep 1966 | Dec 2025 | Water |
| French Meadows | Placer County Water Agency - (CA) | Foresthill, CA | California Independent System Operator (CISO) | 50.8 GWh | Sep 1966 | Dec 2024 | Water |
| Middle Fork | Placer County Water Agency - (CA) | Foresthill, CA | California Independent System Operator (CISO) | 444.4 GWh | Sep 1966 | May 2026 | Water |
| Pivot Energy PPA 22 | Pivot Energy | Visalia, CA | California Independent System Operator (CISO) | 2.2 GWh | Sep 2024 | Dec 2025 | Solar |
| Pio Pico Energy Center | Pio Pico Energy Center LLC | San Diego, CA | California Independent System Operator (CISO) | 46.9 GWh | Oct 2016 | Dec 2025 | Natural Gas |
| Pinyon Pine II | Pinyon Pines Wind II, LLC | Mojave, CA | California Independent System Operator (CISO) | 204.3 GWh | Oct 2012 | Dec 2025 | Wind |
| Pinyon Pine I | Pinyon Pines Wind I, LLC | Mojave, CA | California Independent System Operator (CISO) | 283.1 GWh | Oct 2012 | Dec 2025 | Wind |
Browse Power Plants By California Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Glenn County, CA | # 55 | 2 | 12.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Sierra County, CA | # 52 | 3 | 29.3 GWh |
| Napa County, CA | # 51 | 11 | 51.2 GWh |
| Tehama County, CA | # 50 | 7 | 52.9 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.8 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| San Francisco County, CA | # 47 | 10 | 79.8 GWh |
| San Mateo County, CA | # 46 | 11 | 131.4 GWh |
| Yolo County, CA | # 45 | 15 | 196.2 GWh |
| Nevada County, CA | # 44 | 12 | 225.0 GWh |
| San Benito County, CA | # 43 | 6 | 257.6 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 300.1 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Humboldt County, CA | # 39 | 10 | 442.1 GWh |
| Merced County, CA | # 38 | 33 | 484.8 GWh |
| Trinity County, CA | # 37 | 5 | 488.3 GWh |
| Calaveras County, CA | # 36 | 6 | 502.3 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Amador County, CA | # 34 | 8 | 610.5 GWh |
| Ventura County, CA | # 33 | 33 | 672.3 GWh |
| Lake County, CA | # 32 | 10 | 896.8 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 28 | 1.2 TWh |
| San Joaquin County, CA | # 29 | 53 | 1.5 TWh |
| Yuba County, CA | # 28 | 5 | 1.5 TWh |
| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| El Dorado County, CA | # 27 | 15 | 1.6 TWh |
| Tulare County, CA | # 26 | 71 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.7 TWh |
| Placer County, CA | # 24 | 24 | 1.8 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Monterey County, CA | # 21 | 29 | 2.3 TWh |
| Orange County, CA | # 20 | 59 | 2.5 TWh |
| Alameda County, CA | # 19 | 51 | 2.6 TWh |
| Stanislaus County, CA | # 18 | 25 | 2.7 TWh |
| Tuolumne County, CA | # 17 | 23 | 2.9 TWh |
| Solano County, CA | # 16 | 41 | 3.1 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 14 | 76 | 3.5 TWh |
| Kings County, CA | # 13 | 58 | 4.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.3 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| Sacramento County, CA | # 10 | 67 | 5.6 TWh |
| Shasta County, CA | # 9 | 46 | 7.2 TWh |
| Fresno County, CA | # 8 | 127 | 7.3 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| San Bernardino County, CA | # 6 | 208 | 12.0 TWh |
| Contra Costa County, CA | # 5 | 59 | 12.7 TWh |
| Riverside County, CA | # 4 | 162 | 14.1 TWh |
| Los Angeles County, CA | # 3 | 319 | 16.8 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.5 TWh |
| Kern County, CA | # 1 | 317 | 34.2 TWh |