Genentech-Oceanside Hybrid
1 Antibody Way, Oceanside, CA 92056Plant Summary Information
Genentech-Oceanside Hybrid is ranked #423 out of 917 solar farms in California in terms of total annual net electricity generation.
Genentech-Oceanside Hybrid generated 1.2 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Genentech-Oceanside Hybrid |
|---|---|
| Utility Name | Tesla Inc. |
| Location | San Diego County, CA |
| Initial Operation Date | April 2016 |
| Last Update | Dec 2025 |
| Annual Generation | 6.1 GWh |
| Annual Consumption | 22.2 k MMBtu |
| Ranked #7,880 out of 13,301 Power Plants Nationwide | |
| Ranked #3,214 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #1,012 out of 1,641 California Power Plants | |
| Ranked #423 out of 917 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
SolarCity Corporation (2015 to 2015) Tesla Inc. (2016 to 2025) |
Map of Genentech-Oceanside Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Genentech-Oceanside Hybrid.
Monthly Net Generation for Genentech-Oceanside Hybrid
Monthly Plant Fuel Consumption for Genentech-Oceanside Hybrid
Genentech-Oceanside Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | Genentech-Oceanside Hybrid (60231) |
| Plant Address | 1 Antibody Way, Oceanside, CA 92056 |
| Utility | Tesla Inc. (57313) |
| Latitude, Longitude | 33.2111, -117.29959 |
| Generation Dates on File | Apr 2016 to Dec 2025 |
| Initial Operation Date | April 2016 |
| Annual Generation | 6.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
| Grid Voltage | 1.00 kV |
| Energy Storage | Yes |
Generator BA1 Details Operating April 2016
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 2 MW |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2016 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 2 |
|---|---|
| Maximum Charge Rate | 1 MW |
| Maximum Discharge Rate | 1 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 1 |
| Storage Enclosure Type | CS |
| Load Management | Yes |
| Backup Power | Yes |
| Excess Wind And Solar Generation | P |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 60231 |
| Direct Support Gen Id | PV1 |
| Support T D Asset | No |
Generator PV1 Details Operating April 2016
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 4.5 MW |
| Summer Capacity | 4.5 MW |
| Winter Capacity | 4.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2016 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 25 |
| DC Net Capacity | 4.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 4.8 MW |
| Virtual Net Metering Agreement | No |
Genentech-Oceanside Hybrid Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #3204 | Shannon Farm | Shannon, NC | 6.2 GWh |
| #3205 | Richmond County GA S2 LLC | Hephzibah, GA | 6.2 GWh |
| #3206 | Reid Solar | Rome, NY | 6.2 GWh |
| #3207 | Caribou | Caribou, ME | 6.2 GWh |
| #3208 | Belair | Troy, NY | 6.2 GWh |
| #3209 | Vale Solar Center | Ontario, OR | 6.2 GWh |
| #3210 | 1001 Ebenezer Church Solar | StateRoad, NC | 6.2 GWh |
| #3211 | Junction Road | Raritan Township, NJ | 6.2 GWh |
| #3212 | NY PAVILION 6464 SHEPARD RD - Genesee 4 | Pavilion, NY | 6.2 GWh |
| #3213 | Shaker | Gray, ME | 6.2 GWh |
| #3215 | Gilead | Gilead, NC | 6.2 GWh |
| #3216 | Warrenton Farm | Warrenton, NC | 6.2 GWh |
| #3217 | Bruce A Henry Solar Farm | Georgetown, DE | 6.2 GWh |
| #3218 | GSPP Boxborough Littleton (MA) | Boxborough, MA | 6.2 GWh |
| #3219 | NIST Solar | Gaithersburg, MD | 6.1 GWh |
| #3220 | NL MA - Copicut | Freetown, MA | 6.1 GWh |
| #3221 | Hamlin 1 | Hamlin, NY | 6.1 GWh |
| #3222 | DG Iron Mountain | Edison, NJ | 6.1 GWh |
| #3223 | Geneseo Solar | Geneseo, NY | 6.1 GWh |
| #3224 | SSD Clackamas 1, LLC | Boring, OR | 6.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Genentech-Oceanside Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bear Valley | Escondido, CA | 2.7 GWh | 16.7 mi |
| CalPeak Power Enterprise Peaker Plant | Escondido, CA | 2.2 GWh | 12.2 mi |
| Carlsbad Energy Center | Carlsbad, CA | 202.6 GWh | 5.3 mi |
| Encina Water Pollution Control | Carlsbad, CA | 14.3 GWh | 6.7 mi |
| Escondido Energy Center | Escondido, CA | 3.2 GWh | 12.1 mi |
| GEN005 Antibody Fuel Cell | Oceanside, CA | 19.5 GWh | 0 mi |
| Gilead Oceanside Solar Project | Oceanside, CA | 952.0 MWh | 0.3 mi |
| Goal Line LP | Escondido, CA | 14.4 GWh | 13.2 mi |
| Legoland CA Phase I | Carlsbad, CA | 1.4 GWh | 5.8 mi |
| Life Technologies Carlsbad | Carlsbad, CA | 8.6 GWh | 5.2 mi |
| NLP Granger | Valley Center, CA | 4.5 GWh | 14.5 mi |
| Orange Grove Peaking Facility | Pala, CA | 9.1 GWh | 14.9 mi |
| Palomar Energy | Escondido, CA | 1.2 TWh | 12.3 mi |
| San Diego - NCRC at Vista | Vista, CA | 2.8 GWh | 2.9 mi |
| SDCWA - Twin Oaks | San Marcos, CA | 1.6 GWh | 7.5 mi |
| Vallecitos Water District | San Marcos, CA | 2.8 GWh | 7.1 mi |
| Valley Center | Valley Center, CA | 4.3 GWh | 16.2 mi |
| Valley Center 1 | Valley Center, CA | 3.6 GWh | 17.3 mi |
| Valley Center 2 | Valley Center, CA | 8.5 GWh | 17.3 mi |