Sacramento Fairbain Water Treatment Plan

7501 College Town Dr, Sacramento, CA 95826

Plant Summary Information

Sacramento Fairbain Water Treatment Plan is ranked #823 out of 885 solar farms in California in terms of total annual net electricity generation.

Sacramento Fairbain Water Treatment Plan generated 155.0 MWh during the 3-month period between September 2025 to December 2025.

Plant NameSacramento Fairbain Water Treatment Plan
Utility NameTesla Inc.
LocationSacramento County, CA
Initial Operation DateFebruary 2013
Last Update Dec 2025
Annual Generation 1.2 GWh
Annual Consumption 4.2 k MMBtu
Ranked #11,899 out of 13,081 Power Plants Nationwide
Ranked #6,636 out of 7,015 Solar Power Plants Nationwide
Ranked #1,521 out of 1,606 California Power Plants
Ranked #823 out of 885 California Solar Power Plants
Fuel Types Solar
Previous Operator SolarCity Corporation (2013 to 2015)
Tesla Inc. (2016 to 2025)

Map of Sacramento Fairbain Water Treatment Plan

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sacramento Fairbain Water Treatment Plan.

Create Your Account Today

Monthly Net Generation for Sacramento Fairbain Water Treatment Plan

Monthly Plant Fuel Consumption for Sacramento Fairbain Water Treatment Plan

Sacramento Fairbain Water Treatment Plan Details

Summary Information
Plant NameSacramento Fairbain Water Treatment Plan (58636)
Plant Address7501 College Town Dr, Sacramento, CA 95826
UtilityTesla Inc. (57313)
Latitude, Longitude38.5548, -121.41679
Generation Dates on FileFeb 2013 to Dec 2025
Initial Operation DateFebruary 2013
Annual Generation 1.2 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityBalancing Authority of Northern California (BANC)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerSacramento Municipal Util Dist (16534) CA
Grid Voltage 0.48 kV
Energy StorageNo

Generator 1 Details Operating February 2013

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1 MW
Summer Capacity1 MW
Winter Capacity1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateFebruary 2013
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Single Axis TrackingYes
Azimuth Angle180
Tilt Angle10
DC Net Capacity1.1 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity1.1 MW
Virtual Net Metering AgreementNo

Sacramento Fairbain Water Treatment Plan Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#6626Colon PVWilmington, CA1.2 GWh
#6627Pembroke Lakes MallPembroke Pines, FL1.2 GWh
#6628Western 102 Power PlantMcCarran, NV385.1 GWh
#6629Brookhaven Landfill Solar Farm 1Brookhaven, NY1.2 GWh
#6630MA Solar Storage 1 HybridSterling, MA1.2 GWh
#6631Hartford Landfill Solar EGFHartford, CT1.2 GWh
#6632IKEA Miami 327Miami, FL1.2 GWh
#6633L'Oreal PiscatawayNew Brunswick, NJ1.2 GWh
#6634Murphy Farm Power, LLCCulberson, NC1.2 GWh
#6635CED Spring Creek SolarSt Anne, IL1.2 GWh
#6637USS Maverick Solar LLC (CSG)Good Thunder, MN1.2 GWh
#6638Masser Farms Realty SolarSacramento, PA1.2 GWh
#6639BWC Origination 8 LLC Sturbridge 1Sturbridge, MA1.2 GWh
#6640ADP Parsippany NJParsippany, NJ1.2 GWh
#6641NCS FCPA LLCWashington, DC1.2 GWh
#6642Lancaster Baptist ChurchLancaster, CA1.2 GWh
#6643White Plains RFP Shapham PlaceWhite Plains, NY1.2 GWh
#6644Haverhill Solar Power ProjectHaverhill, MA1.2 GWh
#6645Sabert SolarSayreville, NJ1.2 GWh
#6646Green Acres Solar Facility 2Elk Grove, CA1.2 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Sacramento Fairbain Water Treatment Plan.

Plant NamePlant LocationAnnual GenerationDistance
CA- US Foods- Sacramento (McClellan)McClellan, CA1.4 GWh6.5 mi
Campbell Power PlantSacramento, CA504.9 GWh4.3 mi
Carson Power PlantSacramento, CA83.0 GWh7.9 mi
CSU Sacramento ISacramento, CA2.1 GWh0.3 mi
Department of JusticeSacramento, CA3.5 GWh1.8 mi
Depot Park Solar SystemSacramento, CA2.7 GWh2.9 mi
Dept of General Services -FTBSacramento, CA4.8 GWh4 mi
FAA NorCal TRACONMather AFB, CA1.9 GWh8.6 mi
FRV SI Transport Solar LPSacramento, CA1.3 GWh4.9 mi
KP South Sacramento Hospital SolarSacramento, CA2.6 GWh6.6 mi
McClellan (CA)Sacramento, CA1.2 GWh6.9 mi
Procter & Gamble Power PlantSacramento, CA518.7 GWh1.9 mi
Rancho Cordova Medical OfficesRancho Cordova, CA2.0 GWh7 mi
Sacramento (SMUD)Sacramento, CA2.3 GWh3.1 mi
Sacramento Point West Medical OfficesSacramento, CA2.2 GWh2.9 mi
Sacramento Regional County Sanitation PVElk Grove, CA7.4 GWh7.8 mi
Solar Star California II LLCSacramento, CA3.8 GWh4.1 mi
Strata Roof 1Sacramento, CA1.4 GWh7.8 mi
US GSA - SacramentoSacramento, CA1.5 GWh3.4 mi
Wildflower Solar 1Elverta, CA28.1 GWh10.9 mi