Garnet Wind Energy Center
61983 Garnet Road, North Palm Springs, CA 92258Plant Summary Information
Garnet Wind Energy Center is ranked #84 out of 110 wind farms in California in terms of total annual net electricity generation.
Garnet Wind Energy Center generated 1.1 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Garnet Wind Energy Center |
---|---|
Utility Name | Terra-Gen Operating Co-Wind |
Location | Riverside County, CA |
Initial Operation Date | June 2009 |
Last Update | Dec 2024 |
Annual Generation | 11.9 GWh |
Annual Consumption | 41.8 k MMBtu |
Ranked #5,808 out of 12,312 Power Plants Nationwide | |
Ranked #1,121 out of 1,355 Wind Power Plants Nationwide | |
Ranked #801 out of 1,568 California Power Plants | |
Ranked #84 out of 110 California Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Garnet Energy Corporation (2013 to 2018) Terra-Gen Operating Co-Wind (2019 to 2024) |
Map of Garnet Wind Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Garnet Wind Energy Center.
Monthly Net Generation for Garnet Wind Energy Center
Garnet Wind Energy Center Details
Summary Information | |
---|---|
Plant Name | Garnet Wind Energy Center (57302) |
Plant Address | 61983 Garnet Road, North Palm Springs, CA 92258 |
Utility | Terra-Gen Operating Co-Wind (2770) |
Latitude, Longitude | 33.9053, -116.5825 |
Generation Dates on File | Jun 2009 to Dec 2024 |
Initial Operation Date | June 2009 |
Annual Generation | 11.9 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF05-183-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator 1 Details Operating June 2009
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 6.5 MW |
Summer Capacity | 6.5 MW |
Winter Capacity | 6.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2009 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 13 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 13 |
---|---|
Predominant Turbine Manufacturer | NedWind |
Predominant Turbine Model Number | NEDWIND 40 |
Design Wind Speed | 15 MPH |
Wind Quality Class | 1 - High Wind |
Turbine Hub Height Feet | 131 |
Garnet Wind Energy Center Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Dutch Energy Corporation | 1800 Bridgegate St. Suite 102, Westlake Village, CA 91631 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1111 | Red Lake Falls Community Hybrid | Red Lake Falls, MN | 14.0 GWh |
#1112 | Haviland Plastic Products | Haviland, OH | 12.9 GWh |
#1113 | Huerfano River Wind | Walsenburg, CO | 12.8 GWh |
#1114 | Cooper Farms VW Project | Van Wert, OH | 12.8 GWh |
#1115 | Fort Hays State University Wind Farm | Hays, KS | 12.7 GWh |
#1116 | Agriwind | Tiskilwa, IL | 12.7 GWh |
#1117 | Lamar Plant | Lamar, CO | 12.6 GWh |
#1118 | Edom Hills Project 1 LLC | Cathedral City, CA | 12.4 GWh |
#1119 | Western Plains Wind | Oakley, KS | 12.2 GWh |
#1120 | Shaokatan Hills LLC | Hendricks, MN | 12.1 GWh |
#1122 | Coastal Energy Project | Aberdeen, WA | 11.6 GWh |
#1123 | Foote Creek IV | Rock River, WY | 11.6 GWh |
#1124 | Polk County Renewables, LLC | Osceola, NE | 11.6 GWh |
#1125 | Searsburg Wind Turbine | Searsburg, VT | 11.3 GWh |
#1126 | Medicine Bow | Medicine Bow, WY | 11.1 GWh |
#1127 | Optimum Wind 7 LLC | Nevada, IA | 11.0 GWh |
#1128 | Butter Creek Power LLC | Echo, OR | 10.9 GWh |
#1129 | Cashton Greens Wind Farm | Cashton, WI | 10.7 GWh |
#1130 | Wind Colebrook South | Colebrook, CT | 10.7 GWh |
#1131 | Ralls Wind Farm | Ralls, TX | 10.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Garnet Wind Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Coachella Hills Wind | Palm Springs, CA | 216.5 GWh | 0.2 mi |
Desert Hot Springs Solar | Desert Hot Springs, CA | 4.8 GWh | 3.3 mi |
Dillon Wind LLC | North Palm Springs, CA | 142.4 GWh | 2.9 mi |
East Winds Project | Palm Springs, CA | 7.3 GWh | 2.6 mi |
Garnet Solar Generation Station I LLC | Palm Springs, CA | 6.1 GWh | 2.5 mi |
Indigo Energy Facility | North Palm Springs, CA | 24.6 GWh | 1.7 mi |
Karen Avenue Wind Farm | North Palm Springs, CA | 23.4 GWh | 1.6 mi |
Mountain View I & II | North Palm Springs, CA | 281.2 GWh | 1.5 mi |
Mountain View III | North Palm Springs, CA | 75.7 GWh | 0.8 mi |
Mountain View IV | North Palm Springs, CA | 186.8 GWh | 2.4 mi |
North Palm Springs 1A | Palm Springs, CA | 5.2 GWh | 1.4 mi |
North Palm Springs 4A | Palm Springs, CA | 7.9 GWh | 1.2 mi |
Painted Hills Wind Park | Whitewater, CA | 169.6 GWh | 3 mi |
Phoenix Wind Power LLC | North Palm Springs, CA | 2.8 GWh | 2 mi |
San Gorgonio Farms Wind Farm | Whitewater, CA | 61.3 GWh | 2.4 mi |
San Gorgonio Westwinds II LLC | North Palm Springs, CA | 124.4 GWh | 2 mi |
San Gorgonio Windplant WPP1993 | North Palm Springs, CA | 202.0 GWh | 1 mi |
Sentinel Energy Center, LLC | Desert Hot Springs, CA | 304.9 GWh | 2.1 mi |
Wagner Wind LLC | Palm Springs, CA | 15.5 GWh | 1.6 mi |
Whitewater Hill Wind Partners | North Palm Springs, CA | 128.3 GWh | 2.4 mi |