Lockhart Solar PV, LLC
43880 Harper Lake Road, Hinkley, CA 92347Plant Summary Information
Lockhart Solar PV, LLC is ranked #87 out of 834 solar farms in California in terms of total annual net electricity generation.
Lockhart Solar PV, LLC generated 44.8 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Lockhart Solar PV, LLC |
|---|---|
| Utility Name | Terra-Gen Operating Co-Solar |
| Location | San Bernardino County, CA |
| Initial Operation Date | December 1989 |
| Last Update | Mar 2026 |
| Annual Generation | 242.5 GWh |
| Annual Consumption | 902.8 k MMBtu |
| Ranked #2,274 out of 12,332 Power Plants Nationwide | |
| Ranked #355 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #226 out of 1,530 California Power Plants | |
| Ranked #87 out of 834 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
FPL Energy Operating Services Inc - SEGS (2013 to 2017) Terra-Gen Operating Co-Solar (2018 to 2024) |
Map of Lockhart Solar PV, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lockhart Solar PV, LLC.
Monthly Net Generation for Lockhart Solar PV, LLC
Monthly Plant Fuel Consumption for Lockhart Solar PV, LLC
Lockhart Solar PV, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Lockhart Solar PV, LLC (10444) |
| Plant Address | 43880 Harper Lake Road, Hinkley, CA 92347 |
| Utility | Terra-Gen Operating Co-Solar (61950) |
| Latitude, Longitude | 35.0308, -117.3563 |
| Generation Dates on File | Jan 2001 to Mar 2026 |
| Initial Operation Date | December 1989 |
| Annual Generation | 242.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Ground Water |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 220.00 kV |
| Energy Storage | Yes |
Generator LOC1 Details Operating July 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 100.4 MW |
| Summer Capacity | 85 MW |
| Winter Capacity | 85 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| DC Net Capacity | 108.7 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Lockhart Solar PV, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #345 | Elm Branch Solar 1 | Bardwell, TX | 251.7 GWh |
| #346 | West Line Solar, LLC | City of Eloy, AZ | 251.1 GWh |
| #347 | SR Snipesville III | Denton, GA | 250.8 GWh |
| #348 | Antelope Expansion 2 | Lancaster, CA | 250.5 GWh |
| #349 | Emerald Grove | Crane, TX | 250.1 GWh |
| #350 | Hickory Solar | Jerseyville, IL | 249.5 GWh |
| #351 | Great Cove Solar II | Saint Thomas, PA | 249.5 GWh |
| #352 | Flat Fork Solar | Wheatley, AR | 248.5 GWh |
| #353 | Calhoun County Solar Project | Sheridan Township, MI | 247.0 GWh |
| #354 | East Line Solar | Coolidge, AZ | 246.4 GWh |
| #356 | Taylor County Solar | Butler, GA | 245.4 GWh |
| #357 | OCI Alamo 7 LLC | Haskell, TX | 245.3 GWh |
| #358 | Orange Grove | Jim Wells, TX | 244.0 GWh |
| #359 | Franklin Solar Hybrid | Twin Falls, ID | 243.9 GWh |
| #360 | Springbok 3 Solar Farm Hybrid | Cantil, CA | 243.4 GWh |
| #361 | Winfield Solar | Winfield, MO | 242.9 GWh |
| #362 | SR Snipesville II | Denton, GA | 242.0 GWh |
| #363 | Ragsdale Solar LLC | Canton, MS | 241.0 GWh |
| #364 | Galloway 2 Solar Farm | Paint Rock, TX | 240.9 GWh |
| #365 | Chesapeake Solar Project | Chesapeake, VA | 240.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lockhart Solar PV, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alamo Solar | Oro Grande, CA | 47.7 GWh | 24.1 mi |
| Baldy Mesa 2_Silver Peak Hybrid | Adelanto, CA | 123.3 GWh | 29.7 mi |
| Baldy Mesa Solar & Storage | Adelanto, CA | 310.5 GWh | 29.7 mi |
| Daggett 2 | Daggett, CA | 523.5 GWh | 30.7 mi |
| Daggett 3 | Daggett, CA | 869.3 GWh | 30.7 mi |
| Expressway Solar A | Victorville, CA | 4.5 GWh | 31 mi |
| Expressway Solar B | Victorville, CA | 4.0 GWh | 30.9 mi |
| Expressway Solar C2 | Victorville, CA | 3.3 GWh | 30.9 mi |
| Foundation Cemex BMQ | Apple Valley, CA | 3.3 GWh | 31.4 mi |
| High Desert Power Plant | Victorville, CA | 3.4 TWh | 30.1 mi |
| Hudson - High Desert Hybrid | Victorville, CA | 295.2 GWh | 27.3 mi |
| Lockhart Solar PV II | Hinkley, CA | 207.6 GWh | 1 mi |
| Madelyn Solar, LLC | Silver Lake, CA | 2.7 GWh | 18.2 mi |
| Mitchell Solar, LLC | Silver Lake, CA | 3.7 GWh | 18.5 mi |
| Mojave Solar Project | Hinkley, CA | 594.5 GWh | 1.3 mi |
| Resurgence Solar | Boron, CA | 251.5 GWh | 10.8 mi |
| Resurgence Solar II | Boron, CA | 135.4 GWh | 10.8 mi |
| Rudy Solar, LLC | Silver Lake, CA | 3.7 GWh | 18.4 mi |
| SunEdison Walmart Apple Valley DC | Apple Valley, CA | 716.0 MWh | 31.2 mi |
| US Borax | Boron, CA | 258.3 GWh | 19.5 mi |