US-TOPCO (Soccer Center)
2301 East Avenue L, Lancaster, CA 93535Plant Summary Information
US-TOPCO (Soccer Center) is ranked #368 out of 849 solar farms in California in terms of total annual net electricity generation.
US-TOPCO (Soccer Center) generated 1.7 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | US-TOPCO (Soccer Center) |
|---|---|
| Utility Name | Tesla Inc. |
| Location | Los Angeles County, CA |
| Initial Operation Date | December 2016 |
| Last Update | Dec 2024 |
| Annual Generation | 7.0 GWh |
| Annual Consumption | 25.2 k MMBtu |
| Ranked #7,248 out of 12,539 Power Plants Nationwide | |
| Ranked #2,642 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #989 out of 1,600 California Power Plants | |
| Ranked #368 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
SolarCity Corporation (2015 to 2015) Tesla Inc. (2016 to 2024) |
Map of US-TOPCO (Soccer Center)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for US-TOPCO (Soccer Center).
Monthly Net Generation for US-TOPCO (Soccer Center)
US-TOPCO (Soccer Center) Details
| Summary Information | |
|---|---|
| Plant Name | US-TOPCO (Soccer Center) (60086) |
| Plant Address | 2301 East Avenue L, Lancaster, CA 93535 |
| Utility | Tesla Inc. (57313) |
| Latitude, Longitude | 34.66072, -118.08115 |
| Generation Dates on File | Jan 2017 to Dec 2024 |
| Initial Operation Date | December 2016 |
| Annual Generation | 7.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 1.00 kV |
| Energy Storage | No |
Generator PV1 Details Operating December 2016
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 3 MW |
| Summer Capacity | 3 MW |
| Winter Capacity | 3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2016 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 20 |
| DC Net Capacity | 3.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 3.7 MW |
| Virtual Net Metering Agreement | No |
US-TOPCO (Soccer Center) Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2632 | Garrell Solar Farm | Chadbourn, NC | 7.0 GWh |
| #2633 | Bolton PV | Bolton, MA | 7.0 GWh |
| #2634 | Genesee - CCR Solar | Hilton, NY | 7.0 GWh |
| #2635 | Shannon Farm | Shannon, NC | 7.0 GWh |
| #2636 | UC Riverside Lots 30 & 32 | Riverside, CA | 7.0 GWh |
| #2637 | Milford 2 | Milford, UT | 7.0 GWh |
| #2638 | Water Street Solar | Randolph, ME | 7.0 GWh |
| #2639 | New Bedford (MA) Plymouth | Plymouth, MA | 7.0 GWh |
| #2640 | Middleton Solar Park | Middleton, MA | 6.8 GWh |
| #2641 | South Robeson Farm | Rowland, NC | 7.0 GWh |
| #2643 | Cicero Energy Storage 1 LLC | East Syracuse, NY | 7.0 GWh |
| #2644 | Forest Lake Solar CSG | Scandia, MN | 7.0 GWh |
| #2645 | SunE CPS2 LLC | San Antonio, TX | 7.0 GWh |
| #2646 | Amazon JFK8 Solar Project | Staten Island, NY | 6.9 GWh |
| #2647 | Knapp West(CSG) | Akron, NY | 6.9 GWh |
| #2648 | Milo CSG | Milo, ME | 6.9 GWh |
| #2649 | GMP Solar/Storage-Essex Hybrid | Essex, VT | 7.0 GWh |
| #2650 | Carolina Lily Solar | Advance, NC | 6.9 GWh |
| #2651 | Wright Kirby 1-5 CSG | Monticello, MN | 6.9 GWh |
| #2652 | ME-EDFR-Phase I-Woolwich | Woolwich, ME | 6.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding US-TOPCO (Soccer Center).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arrache 4006 | Palmdale, CA | 2.3 GWh | 1.8 mi |
| Arrache 4013 | Palmdale, CA | 3.3 GWh | 1.8 mi |
| Arrache 8083 | Palmdale, CA | 2.8 GWh | 1.4 mi |
| Division 1 | Lancaster, CA | 2.7 GWh | 4.3 mi |
| Division 2 | Lancaster, CA | 541.0 MWh | 4.3 mi |
| Division 3 | Lancaster, CA | 458.0 MWh | 4.3 mi |
| Green Beanworks B PV | Lancaster, CA | 7.1 GWh | 5.5 mi |
| Green Beanworks D PV | Palmdale, CA | 4.1 GWh | 0.4 mi |
| Kettering Solar 1 | Lancaster, CA | 1.6 GWh | 3.6 mi |
| Kettering Solar 2 | Lancaster, CA | 1.9 GWh | 3.6 mi |
| L-8 Solar Project | Palmdale, CA | 2.4 GWh | 6.2 mi |
| Lancaster Baptist Church | Lancaster, CA | 1.4 GWh | 2.7 mi |
| Lancaster Solar 1 | Lancaster, CA | 2.4 GWh | 3.8 mi |
| Lancaster Solar 2 | Lancaster, CA | 2.6 GWh | 5.9 mi |
| Ma | Lancaster, CA | 2.5 GWh | 2.6 mi |
| Morgan Lancaster 1 | Lancaster, CA | 796.0 MWh | 0.1 mi |
| Rutan | Palmdale, CA | 3.7 GWh | 4.8 mi |
| SEPV Sierra | Lancaster, CA | 5.0 GWh | 6 mi |
| Solar Oasis LLC | Palmdale, CA | 51.3 GWh | 0.9 mi |
| Vinam | Lancaster, CA | 3.3 GWh | 1.3 mi |