US-TOPCO (Soccer Center)

2301 East Avenue L, Lancaster, CA 93535

Plant Summary Information

US-TOPCO (Soccer Center) is ranked #356 out of 816 solar farms in California in terms of total annual net electricity generation.

US-TOPCO (Soccer Center) generated 1.7 GWh during the 3-month period between September 2024 to December 2024.

Plant NameUS-TOPCO (Soccer Center)
Utility NameTesla Inc.
LocationLos Angeles County, CA
Initial Operation DateDecember 2016
Last Update Dec 2024
Annual Generation 7.0 GWh
Annual Consumption 25.2 k MMBtu
Ranked #7,150 out of 12,288 Power Plants Nationwide
Ranked #2,552 out of 6,174 Solar Power Plants Nationwide
Ranked #984 out of 1,564 California Power Plants
Ranked #356 out of 816 California Solar Power Plants
Fuel Types Solar
Previous Operator SolarCity Corporation (2015 to 2015)
Tesla Inc. (2016 to 2024)

Map of US-TOPCO (Soccer Center)

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for US-TOPCO (Soccer Center).

Create Your Account Today

Monthly Net Generation for US-TOPCO (Soccer Center)

US-TOPCO (Soccer Center) Details

Summary Information
Plant NameUS-TOPCO (Soccer Center) (60086)
Plant Address2301 East Avenue L, Lancaster, CA 93535
UtilityTesla Inc. (57313)
Latitude, Longitude34.66072, -118.08115
Generation Dates on FileJan 2017 to Dec 2024
Initial Operation DateDecember 2016
Annual Generation 7.0 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerSouthern California Edison Co (17609) CA
Grid Voltage 1.00 kV
Energy StorageNo

Generator PV1 Details Operating December 2016

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity3 MW
Summer Capacity3 MW
Winter Capacity3 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2016
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle20
DC Net Capacity3.7 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity3.7 MW
Virtual Net Metering AgreementNo

US-TOPCO (Soccer Center) Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#2542Eagle SolarWarrenton, NC7.0 GWh
#2543Bolton PVBolton, MA7.0 GWh
#2544Genesee - CCR SolarHilton, NY7.0 GWh
#2545Shannon FarmShannon, NC7.0 GWh
#2546UC Riverside Lots 30 & 32Riverside, CA7.0 GWh
#2547Milford 2Milford, UT7.0 GWh
#2548Water Street SolarRandolph, ME7.0 GWh
#2549New Bedford (MA) PlymouthPlymouth, MA7.0 GWh
#2550Middleton Solar ParkMiddleton, MA6.8 GWh
#2551South Robeson FarmRowland, NC7.0 GWh
#2553Cicero Energy Storage 1 LLCEast Syracuse, NY7.0 GWh
#2554Forest Lake Solar CSGScandia, MN7.0 GWh
#2555SunE CPS2 LLCSan Antonio, TX7.0 GWh
#2556Amazon JFK8 Solar ProjectStaten Island, NY6.9 GWh
#2557Knapp West(CSG)Akron, NY6.9 GWh
#2558Milo CSGMilo, ME6.9 GWh
#2559Carolina Lily SolarAdvance, NC6.9 GWh
#2560ME-EDFR-Phase I-WoolwichWoolwich, ME6.9 GWh
#2561Wright Kirby 1-5 CSGMonticello, MN6.9 GWh
#2562CDCR (CA) - Corcoran State PrisonCorcoran, CA6.9 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding US-TOPCO (Soccer Center).

Plant NamePlant LocationAnnual GenerationDistance
Arrache 4006Palmdale, CA2.3 GWh1.8 mi
Arrache 4013Palmdale, CA3.3 GWh1.8 mi
Arrache 8083Palmdale, CA2.8 GWh1.4 mi
Division 1Lancaster, CA2.7 GWh4.3 mi
Division 2Lancaster, CA541.0 MWh4.3 mi
Division 3Lancaster, CA458.0 MWh4.3 mi
Green Beanworks B PVLancaster, CA7.1 GWh5.5 mi
Green Beanworks D PVPalmdale, CA4.1 GWh0.4 mi
Kettering Solar 1Lancaster, CA1.6 GWh3.6 mi
Kettering Solar 2Lancaster, CA1.9 GWh3.6 mi
L-8 Solar ProjectPalmdale, CA2.4 GWh6.2 mi
Lancaster Baptist ChurchLancaster, CA1.4 GWh2.7 mi
Lancaster Solar 1Lancaster, CA2.4 GWh3.8 mi
Lancaster Solar 2Lancaster, CA2.6 GWh5.9 mi
MaLancaster, CA2.5 GWh2.6 mi
Morgan Lancaster 1Lancaster, CA796.0 MWh0.1 mi
RutanPalmdale, CA3.7 GWh4.8 mi
SEPV SierraLancaster, CA5.0 GWh6 mi
Solar Oasis LLCPalmdale, CA51.3 GWh0.9 mi
VinamLancaster, CA3.3 GWh1.3 mi