Almond Power Plant
4500 Crows Landing Road, Modesto, CA 95358Plant Summary Information
Almond Power Plant is ranked #61 out of 316 natural gas power plants in California in terms of total annual net electricity generation.
Almond Power Plant is comprised of 4 generators and generated 37.3 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Almond Power Plant |
|---|---|
| Utility Name | Turlock Irrigation District |
| Location | Stanislaus County, CA |
| Initial Operation Date | April 1996 |
| Last Update | Jun 2026 |
| Annual Generation | 135.3 GWh |
| Annual Consumption | 1.7 M MMBtu |
| Ranked #3,134 out of 13,094 Power Plants Nationwide | |
| Ranked #839 out of 2,208 Natural Gas Power Plants Nationwide | |
| Ranked #313 out of 1,607 California Power Plants | |
| Ranked #61 out of 316 California Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Almond Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Almond Power Plant.
Monthly Net Generation for Almond Power Plant
Monthly Plant Fuel Consumption for Almond Power Plant
Almond Power Plant Details
| Summary Information | |
|---|---|
| Plant Name | Almond Power Plant (7315) |
| Plant Address | 4500 Crows Landing Road, Modesto, CA 95358 |
| Utility | Turlock Irrigation District (19281) |
| Latitude, Longitude | 37.5744, -120.985 |
| Generation Dates on File | Jan 2001 to Jun 2026 |
| Initial Operation Date | April 1996 |
| Annual Generation | 135.3 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | Turlock Irrigation District (TIDC) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Turlock Irrigation District (19281) CA |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | PACIFIC GAS |
| Natural Gas Storage | No |
Generator 1 Details Operating April 1996
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 49.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 49.5 MW |
| Winter Capacity | 49.5 MW |
| Minimum Load | 16 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 1996 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator 2 Details Operating July 2012
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 58 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 50 MW |
| Winter Capacity | 58 MW |
| Minimum Load | 16 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2012 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 3 Details Operating July 2012
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 58 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 50 MW |
| Winter Capacity | 58 MW |
| Minimum Load | 16 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2012 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 4 Details Operating July 2012
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 58 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 50 MW |
| Winter Capacity | 58 MW |
| Minimum Load | 16 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2012 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Almond Power Plant Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #829 | Hamlet Generating Facility | Hamlet, NC | 144.9 GWh |
| #830 | Solway CT | Solway, MN | 142.9 GWh |
| #831 | 491 E 48th Street | Holland, MI | 142.2 GWh |
| #832 | Lederle Laboratories | Pearl River, NY | 141.0 GWh |
| #833 | Spiritwood Station | Spiritwood, ND | 234.9 GWh |
| #834 | Georgia-Pacific Palatka Operations | Palatka, FL | 331.4 GWh |
| #835 | Calcasieu | Sulphur, LA | 138.8 GWh |
| #836 | Berry Cogen Tanne Hills 18 | Maricopa, CA | 138.3 GWh |
| #837 | Narrows Gas Turbines Generating | Brooklyn, NY | 144.9 GWh |
| #838 | Kalamazoo River Generating Station | Comstock, MI | 136.3 GWh |
| #840 | Empire Energy Center | Sarcoxie, MO | 143.8 GWh |
| #841 | PE Berkeley | Berkeley, CA | 133.7 GWh |
| #842 | Algonquin Windsor Locks | Windsor Locks, CT | 144.9 GWh |
| #843 | Klamath Expansion Project | Klamath Falls, OR | 132.3 GWh |
| #844 | Rand Whitney CHP Plant | Montville, CT | 131.4 GWh |
| #845 | Elk River | Elk River, MN | 145.3 GWh |
| #846 | Glenarm | Pasadena, CA | 129.8 GWh |
| #847 | Riverbay | New York, NY | 130.1 GWh |
| #848 | Tenaska Georgia Generation Facility | Franklin, GA | 148.5 GWh |
| #849 | Central Utility Plant - Texas A&M | College Station, TX | 128.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Almond Power Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AltaGas Ripon Energy Inc. | Ripon, CA | 1.3 GWh | 13.1 mi |
| Amazon - Patterson PV | Patterson, CA | 4.9 GWh | 12.3 mi |
| Axium Modesto Solar | Modesto, CA | 53.2 GWh | 11.1 mi |
| CA Manteca 730 Spreckels Ave | Manteca, CA | 100.0 MWh | 18.7 mi |
| Covanta Stanislaus Energy | Crows Landing, CA | 61.9 GWh | 15.6 mi |
| Enchanted Rock Turlock Irrigation Distri | Patterson, CA | 2.5 GWh | 12.5 mi |
| ERock MID Claribel Generation Station | Modesto, CA | 3.4 GWh | 9.4 mi |
| Frankenheimer Power Plant | Oakdale, CA | 11.3 GWh | 20.2 mi |
| Frontier Solar LLC | Newman, CA | 47.9 GWh | 15.6 mi |
| Hickman | Hickman, CA | 3.6 GWh | 13.5 mi |
| McClure | Modesto, CA | 1.6 GWh | 4.8 mi |
| Paulsell | Crows Landing, CA | 47.7 GWh | 16.1 mi |
| Proxima | Crows Landing, CA | 467.5 GWh | 15.5 mi |
| Ripon Generation Station | Ripon, CA | 2.8 GWh | 13 mi |
| Robert O Schulz Solar Farm | Oakdale, CA | 3.9 GWh | 20.3 mi |
| Teichert Materials-Teichert Vernalis | San Joaquin, CA | 1.6 GWh | 20.5 mi |
| Turlock Lake | Hickman, CA | 3.2 GWh | 21.5 mi |
| Walnut Energy Center | Turlock, CA | 1.4 TWh | 7.7 mi |
| West Tambo Clean Power II | Livingston, CA | 4.3 GWh | 20.7 mi |
| Woodland | Modesto, CA | 279.2 GWh | 5.7 mi |