Division 2
45404 Division Street, Lancaster, CA 93535Plant Summary Information
Division 2 is ranked #721 out of 885 solar farms in California in terms of total annual net electricity generation.
Division 2 generated 375.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Division 2 |
|---|---|
| Utility Name | Tesla Inc. |
| Location | Los Angeles County, CA |
| Initial Operation Date | June 2014 |
| Last Update | Dec 2025 |
| Annual Generation | 1.9 GWh |
| Annual Consumption | 6.9 k MMBtu |
| Ranked #10,983 out of 13,081 Power Plants Nationwide | |
| Ranked #5,842 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #1,401 out of 1,606 California Power Plants | |
| Ranked #721 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
SolarCity Corporation (2013 to 2015) Tesla Inc. (2016 to 2025) |
Map of Division 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Division 2.
Monthly Net Generation for Division 2
Monthly Plant Fuel Consumption for Division 2
Division 2 Details
| Summary Information | |
|---|---|
| Plant Name | Division 2 (59095) |
| Plant Address | 45404 Division Street, Lancaster, CA 93535 |
| Utility | Tesla Inc. (57313) |
| Latitude, Longitude | 34.70833, -118.13056 |
| Generation Dates on File | Jun 2014 to Dec 2025 |
| Initial Operation Date | June 2014 |
| Annual Generation | 1.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 0.48 kV |
| Energy Storage | No |
Generator GEN 1 Details Operating June 2014
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1 MW |
| Summer Capacity | 1 MW |
| Winter Capacity | 1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2014 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 5 |
| DC Net Capacity | 1.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 1.1 MW |
| Virtual Net Metering Agreement | No |
Division 2 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5832 | Pierre Solar | Pierre, SD | 1.9 GWh |
| #5833 | USS Nillie Corn Solar CSG | North Branch, MN | 1.9 GWh |
| #5834 | Rich Mountain Electric Cooperative | Mena, AR | 1.9 GWh |
| #5835 | NY Breesport 625 Breesport Rd | Horseheads, NY | 1.9 GWh |
| #5836 | ESA Selma | Selma, NC | 1.9 GWh |
| #5837 | Corvias - Fort Riley II | Fort Riley, KS | 1.9 GWh |
| #5838 | Concord Solar Farm | Concord, MA | 1.9 GWh |
| #5839 | Twiss Street Solar | Westfield, MA | 1.9 GWh |
| #5840 | Harford Solar Farm | Harford, NY | 1.9 GWh |
| #5841 | Broadalbin-Perth Solar | Amsterdam, NY | 1.9 GWh |
| #5843 | Pepin Garden | Kellogg, MN | 1.9 GWh |
| #5844 | Leo Community Solar | Hadley, MN | 1.9 GWh |
| #5845 | ACCP NJ 1 | Hopatcong, NJ | 1.9 GWh |
| #5846 | USS Dot Com Solar LLC CSG | Morgan, MN | 1.9 GWh |
| #5847 | SR Skylark C | Windsor, CO | 1.9 GWh |
| #5848 | FastSun 10 CSG | Zumbrota, MN | 1.9 GWh |
| #5849 | Sutter Home Winery GIR | American Canyon, CA | 1.9 GWh |
| #5850 | Kosa | Independence, NY | 1.9 GWh |
| #5851 | CO- CSU- Fort Collins | Fort Collins, CO | 1.9 GWh |
| #5852 | Barone CSG | Winstead, MN | 1.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Division 2.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arrache 4006 | Palmdale, CA | 2.3 GWh | 5.8 mi |
| Arrache 4013 | Palmdale, CA | 4.2 GWh | 6 mi |
| Arrache 8083 | Palmdale, CA | 3.0 GWh | 5.8 mi |
| CSP Los Angeles | Lancaster, CA | 5.7 GWh | 5.6 mi |
| Division 1 | Lancaster, CA | 2.5 GWh | 0 mi |
| Division 3 | Lancaster, CA | 1.1 GWh | 0 mi |
| Foundation CDCR LAC | Lancaster, CA | 4.3 GWh | 5.3 mi |
| Green Beanworks D PV | Palmdale, CA | 6.3 GWh | 4.6 mi |
| Kettering Solar 1 | Lancaster, CA | 1.6 GWh | 0.7 mi |
| Kettering Solar 2 | Lancaster, CA | 1.5 GWh | 0.7 mi |
| Lancaster Baptist Church | Lancaster, CA | 1.2 GWh | 4.2 mi |
| Lancaster Solar 1 | Lancaster, CA | 2.4 GWh | 2.1 mi |
| Lancaster Solar 2 | Lancaster, CA | 2.1 GWh | 2 mi |
| Ma | Lancaster, CA | 1.8 GWh | 4 mi |
| Morgan Lancaster 1 | Lancaster, CA | 818.0 MWh | 4.2 mi |
| Rutan | Palmdale, CA | 3.0 GWh | 4.8 mi |
| SEPV Sierra | Lancaster, CA | 5.4 GWh | 1.8 mi |
| Solar Oasis LLC | Palmdale, CA | 52.7 GWh | 5.1 mi |
| US-TOPCO (Soccer Center) | Lancaster, CA | 3.5 GWh | 4.3 mi |
| Vinam | Lancaster, CA | 3.0 GWh | 4.8 mi |