Torrance Refining Company, LLC
3700 West 190th Street, Torrance, CA 90509Plant Summary Information
Torrance Refining Company, LLC is ranked #37 out of 57 other gas power plants nationwide in terms of total annual net electricity generation.
Torrance Refining Company, LLC is comprised of 3 generators and generated 19.1 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Torrance Refining Company, LLC |
|---|---|
| Utility Name | Torrance Refining Company, LLC |
| Location | Los Angeles County, CA |
| Initial Operation Date | September 1983 |
| Last Update | Aug 2026 |
| Annual Generation | 62.2 GWh |
| Annual Consumption | 997.4 k MMBtu |
| Ranked #4,030 out of 13,301 Power Plants Nationwide | |
| Ranked #37 out of 57 Other Gas Power Plants Nationwide | |
| Ranked #420 out of 1,641 California Power Plants | |
| Ranked #6 out of 9 California Other Gas Power Plants | |
| Fuel Types | Other Gas : 52.0% Waste Heat : 48.0% |
| Previous Operator |
Exxon Mobil Oil Corporation (2013 to 2015) Torrance Refining Company, LLC (2016 to 2025) |
Map of Torrance Refining Company, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Torrance Refining Company, LLC.
Monthly Net Generation for Torrance Refining Company, LLC
Monthly Plant Fuel Consumption for Torrance Refining Company, LLC
Torrance Refining Company, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Torrance Refining Company, LLC (50624) |
| Plant Address | 3700 West 190th Street, Torrance, CA 90509 |
| Utility | Torrance Refining Company, LLC (60657) |
| Latitude, Longitude | 33.85336, -118.33 |
| Generation Dates on File | Jan 2001 to Aug 2026 |
| Initial Operation Date | September 1983 |
| Annual Generation | 62.2 GWh |
| Fuel Types | Other Gas : 52.0% Waste Heat : 48.0% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | Yes |
| FERC Cogeneration Docket Number | 06-15-000 |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Petroleum Refineries (32411) |
| Sector | Industrial CHP (7) |
| Water Source | Recycled Water |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | SOUTHERN CALIFORNIA GAS COMPANY |
| Natural Gas Storage | No |
Generator EXP1 Details Operating September 1983
| Technology | All Other |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 7.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 7.5 MW |
| Winter Capacity | 7.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 1983 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Industrial CHP (7) |
| Energy Source | Waste Heat |
| Startup Source | Waste Heat |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Fluidized Bed Technology | No |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GTG1 Details Operating November 1988
| Technology | Other Gases |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 22.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 22.5 MW |
| Winter Capacity | 22.5 MW |
| Minimum Load | 10.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 1988 |
| Combined Heat & Power | Yes |
|---|---|
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Other Gas / Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | NG / OG |
|---|---|
Generator STG1 Details Standby November 1988
| Technology | All Other |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 19.3 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 19.3 MW |
| Winter Capacity | 19.3 MW |
| Minimum Load | 1.5 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | Yes |
| First Operation Date | November 1988 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Industrial CHP (7) |
| Energy Source | Waste Heat |
| Startup Source | Waste Heat |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Torrance Refining Company, LLC Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Other Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #27 | Air Products Port Arthur | Port Arthur, TX | 1.2 TWh |
| #28 | Port Arthur Texas Refinery | Port Arthur, TX | 247.8 GWh |
| #29 | Ingleside Cogeneration | Houston, TX | 3.1 TWh |
| #30 | Signal Hill West Unit | Signal Hill, CA | 39.6 GWh |
| #31 | Texas Petrochemicals | Houston, TX | 240.7 GWh |
| #32 | Green Power 2 | Texas City, TX | 4.2 TWh |
| #33 | Valero Refinery Cogeneration Unit 1 | Benicia, CA | 236.7 GWh |
| #34 | Mon Valley Works | Dravosburg, PA | 483.2 GWh |
| #35 | Valero Refinery Corpus Christi West | Corpus Christi, TX | 83.9 GWh |
| #36 | Union Carbide Seadrift Cogen | Seadrift, TX | 563.3 GWh |
| #38 | Engineered Carbons Borger Cogen | Borger, TX | 31.6 GWh |
| #39 | Tesoro Mandan Cogeneration Plant | Mandan, ND | 45.0 GWh |
| #40 | Martinez Refining | Martinez, CA | 658.2 GWh |
| #41 | Richmond Cogen | Richmond, CA | 965.4 GWh |
| #42 | Dow St Charles Operations | Taft, LA | 1.8 TWh |
| #43 | Axiall Natrium Plant | New Martinsville, WV | 594.0 GWh |
| #44 | Seadrift Coke LP | Port Lavaca, TX | 35.5 GWh |
| #45 | Tennessee Eastman Operations | Kingsport, TN | 1.0 TWh |
| #46 | Houston Chemical Complex Battleground | Houston, TX | 1.6 TWh |
| #47 | Oyster Creek Unit VIII | Freeport, TX | 2.6 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Torrance Refining Company, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 20333 Normandie PV, LLC | Torrance, CA | 5.1 GWh | 1.8 mi |
| AT&T - Gardena | Gardena, CA | 7.8 GWh | 2.7 mi |
| AT&T - Hawthorne | Hawthorne, CA | 8.5 GWh | 4.9 mi |
| Carson Cogeneration | Carson, CA | 2.6 GWh | 4.9 mi |
| Colon PV | Wilmington, CA | 1.6 GWh | 6.1 mi |
| CPA 2132 E Dominguez | Carson, CA | 913.0 MWh | 5.8 mi |
| CPA Wilmington 1 | Carson, CA | 1.1 GWh | 5.3 mi |
| Dominguez Plant | Long Beach, CA | 33.7 GWh | 5.5 mi |
| El Segundo Cogen | El Segundo, CA | 1.2 TWh | 5.5 mi |
| Equinix Douglas St. Fuel Cell | El Segundo, CA | 15.5 GWh | 5.6 mi |
| Equinix Maple Ave. Fuel Cell | El Segundo, CA | 8.0 GWh | 6.2 mi |
| Francisco St. Solar | Torrance, CA | 1.4 GWh | 1.5 mi |
| Kaiser - Harbor City | Harbor City, CA | 16.6 GWh | 4.9 mi |
| KSR053 Cantara Fuel Cell | Panorama City, CA | 12.5 GWh | 4.8 mi |
| Los Angeles Harbor College | Wilmington, CA | 313.0 MWh | 5.5 mi |
| Los Angeles Refinery Wilmington | Wilmington, CA | 365.4 GWh | 6.4 mi |
| Total Energy Facilities | Carson, CA | 156.5 GWh | 6.5 mi |
| VS BC Pacific Gateway, LLC | Los Angeles, CA | 2.3 GWh | 1.9 mi |
| Watson Cogeneration | Carson, CA | 2.4 TWh | 5.5 mi |
| Westmont 300A | San Pedro, CA | 5.2 GWh | 6.5 mi |