Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| RE Dillard 1 LLC | MN8 Energy LLC | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 4.9 GWh | Dec 2011 | Dec 2025 | Solar |
| RE Kammerer 1 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 10.5 GWh | Dec 2011 | Dec 2025 | Solar |
| RE Dillard 2 LLC | MN8 Energy LLC | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 5.9 GWh | Dec 2011 | Dec 2025 | Solar |
| RE Kammerer 2 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 10.5 GWh | Jan 2012 | Dec 2025 | Solar |
| RE Dillard 3 LLC | MN8 Energy LLC | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 5.9 GWh | Dec 2011 | Dec 2025 | Solar |
| RE Kammerer 3 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 10.5 GWh | Jan 2012 | Dec 2025 | Solar |
| RE Bruceville 1 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 10.8 GWh | Dec 2011 | Dec 2025 | Solar |
| RE Bruceville 2 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 9.5 GWh | Jan 2012 | Dec 2025 | Solar |
| RE Bruceville 3 LLC | MN8 Energy LLC | Elk Grove, CA | Balancing Authority of Northern California (BANC) | 11.3 GWh | Jan 2012 | Dec 2025 | Solar |
| RE McKenzie 1 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2025 | Solar |
| RE McKenzie 2 LLC | MN8 Energy LLC | Galt, CA | Balancing Authority of Northern California (BANC) | 11.6 GWh | Oct 2012 | Dec 2025 | Solar |
| Hudson - High Desert Hybrid | MN8 Energy LLC | Victorville, CA | California Independent System Operator (CISO) | 286.3 GWh | Nov 2021 | Aug 2026 | Solar |
| Broadway 4 - Target Shafter | MN8 Energy LLC | Shafter, CA | California Independent System Operator (CISO) | 2.8 GWh | Aug 2018 | Dec 2025 | Solar |
| Chambers 4 - Eastvale LGB3 | MN8 Energy LLC | Eastvale, CA | California Independent System Operator (CISO) | 4.5 GWh | Jan 2019 | Dec 2025 | Solar |
| Chambers 4 - Redland LGB4 | MN8 Energy LLC | Redlands, CA | California Independent System Operator (CISO) | 4.2 GWh | Feb 2019 | Dec 2025 | Solar |
| Chambers 4 - Riverside LGB6 | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2018 | Dec 2025 | Solar |
| Chambers 4 - Rialto LGB8 | MN8 Energy LLC | Rialto, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2018 | Dec 2025 | Solar |
| Chambers 4 - Sacramento SMF1 | MN8 Energy LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.9 GWh | Aug 2018 | Dec 2025 | Solar |
| Chambers 4 - Eastvale DCA2 | MN8 Energy LLC | Eastvale, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2018 | Dec 2025 | Solar |
| Chambers 4 - San Bernardino SNA7 | MN8 Energy LLC | San Bernardino, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2018 | Dec 2025 | Solar |
| Broadway 3 - UCSB Lot 38 | MN8 Energy LLC | Santa Barbara, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 2016 | Dec 2025 | Solar |
| Broadway 3 - UC Merced 1 | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 929.0 MWh | Sep 2009 | Dec 2025 | Solar |
| RE Victor Phelan Solar One LLC | MN8 Energy LLC | Adelanto, CA | California Independent System Operator (CISO) | 45.1 GWh | Nov 2013 | Dec 2025 | Solar |
| CSU Long Beach Lots 7 & 14 | MN8 Energy LLC | Long Beach, CA | California Independent System Operator (CISO) | 7.2 GWh | Nov 2017 | Dec 2025 | Solar |
| RE Rosamond One LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 51.2 GWh | Dec 2013 | Dec 2025 | Solar |
| County of San Diego SBRC | MN8 Energy LLC | Chula Vista, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2018 | Dec 2025 | Solar |
| Frontier HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2018 | Mar 2025 | Solar |
| Stanford Campus Solar | MN8 Energy LLC | Stanford, CA | California Independent System Operator (CISO) | 5.8 GWh | Feb 2017 | Dec 2025 | Solar |
| Vandenberg Solar Project | MN8 Energy LLC | Vandenberg Airforce B, CA | California Independent System Operator (CISO) | 39.5 GWh | Nov 2017 | Dec 2025 | Solar |
| UC Merced Solar Hybrid | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 8.0 GWh | Nov 2018 | Dec 2025 | Solar |
| Target Woodland Solar Project | MN8 Energy LLC | Woodland, CA | California Independent System Operator (CISO) | 2.8 GWh | Nov 2018 | Dec 2025 | Solar |
| UC Riverside Lots 30 & 32 | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 6.8 GWh | Nov 2017 | Dec 2025 | Solar |
| Liberty HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2018 | Dec 2025 | Solar |
| Broadway 2 - UC Riverside | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 3.9 GWh | Aug 2014 | Dec 2025 | Solar |
| RPUWD Scheuer Well Solar Project | MN8 Energy LLC | San Bernardino, CA | California Independent System Operator (CISO) | 1.5 GWh | May 2018 | Dec 2025 | Solar |
| Mount Signal Solar Farm II | MN8 Energy LLC | Calexico, CA | California Independent System Operator (CISO) | 355.0 GWh | Dec 2019 | Aug 2026 | Solar |
| Golden Fields Solar I, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 135.0 GWh | Nov 2016 | Aug 2026 | Solar |
| RE Rosamond Two LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 48.6 GWh | Dec 2013 | Dec 2025 | Solar |
| RE Mustang LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 220.8 GWh | Jul 2016 | Dec 2025 | Solar |
| Slate Hybrid | MN8 Energy LLC | Stratford, CA | California Independent System Operator (CISO) | 685.5 GWh | Oct 2021 | Aug 2026 | Solar |
| RCWD PV Project | MN8 Energy LLC | Murrieta, CA | California Independent System Operator (CISO) | 8.3 GWh | May 2016 | Dec 2025 | Solar |
| Ramona 2 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 9.0 GWh | Nov 2013 | Dec 2025 | Solar |
| Lafayette 2 - MLK Jr. Hospital (MLK) | MN8 Energy LLC | Los Angeles, CA | California Independent System Operator (CISO) | 2.1 GWh | Jul 2020 | Dec 2025 | Solar |
| Ramona 1 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 3.0 GWh | Nov 2013 | Dec 2025 | Solar |
| Valley Center 2 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 8.5 GWh | Nov 2013 | Dec 2025 | Solar |
| Valley Center 1 | MN8 Energy LLC | Valley Center, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2013 | Dec 2025 | Solar |
| Chevron - Lost Hills Hybrid | MN8 Energy LLC | Lost Hills, CA | California Independent System Operator (CISO) | 62.6 GWh | Mar 2020 | Aug 2026 | Solar |
| Lafayette 2 - Internal Services Dept | MN8 Energy LLC | Los Angeles, CA | California Independent System Operator (CISO) | 2.5 GWh | Jul 2020 | Dec 2025 | Solar |
| California City | MN8 Energy LLC | California City, CA | California Independent System Operator (CISO) | 5.1 GWh | Jun 2018 | Dec 2025 | Solar |
| Solar Star California, XLI, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 133.9 GWh | Nov 2016 | Aug 2026 | Solar |
| Alticor Inc - Solar Project | MN8 Energy LLC | Buena Park, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2017 | Dec 2025 | Solar |
| American Kings Solar, LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 265.5 GWh | Nov 2020 | Aug 2026 | Solar |
| Solar Star California, XLIV, LLC | MN8 Energy LLC | Pearblossom, CA | California Independent System Operator (CISO) | 22.6 GWh | Nov 2016 | Dec 2025 | Solar |
| Grossmont HS Solar Project | MN8 Energy LLC | El Cajon, CA | California Independent System Operator (CISO) | 1.9 GWh | Nov 2018 | Dec 2025 | Solar |
| CSUF State College | MN8 Energy LLC | Fullerton, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2016 | Dec 2025 | Solar |
| CSUF Nutwood Solar | MN8 Energy LLC | Fullerton, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2016 | Dec 2025 | Solar |
| RE Columbia 3 LLC | MN8 Energy LLC | Mojave, CA | California Independent System Operator (CISO) | 23.1 GWh | Dec 2013 | Dec 2025 | Solar |
| RE Rio Grande Solar LLC | MN8 Energy LLC | Mojave, CA | California Independent System Operator (CISO) | 10.3 GWh | Nov 2013 | Dec 2025 | Solar |
| Woodland | Modesto Irrigation District | Modesto, CA | Balancing Authority of Northern California (BANC) | 289.3 GWh | Oct 1993 | Aug 2026 | Natural Gas |
| Ripon Generation Station | Modesto Irrigation District | Ripon, CA | Balancing Authority of Northern California (BANC) | 2.8 GWh | May 2006 | Dec 2025 | Natural Gas |
| New Hogan Power Plant | Modesto Irrigation District | Valley Springs, CA | California Independent System Operator (CISO) | 5.7 GWh | Mar 1989 | Dec 2025 | Water |
| McClure | Modesto Irrigation District | Modesto, CA | Balancing Authority of Northern California (BANC) | 1.6 GWh | Jun 1980 | Dec 2025 | Natural Gas : 71.4% Distillate Fuel Oil : 28.6% |
| Mojave Solar Project | Mojave Solar LLC | Hinkley, CA | California Independent System Operator (CISO) | 583.1 GWh | Nov 2014 | Aug 2026 | Solar |
| Nacimiento Hydro Project | Monterey Cnty Water Res Agency | Bradley, CA | California Independent System Operator (CISO) | 11.8 GWh | Jun 1987 | Dec 2025 | Water |
| Monterey One Water | Monterey One Water | Marina, CA | California Independent System Operator (CISO) | 8.4 GWh | Jul 1988 | Dec 2025 | Other Biomass Gas : 78.5% Natural Gas : 21.5% |
| Marina Landfill Gas | Monterey Regional Waste Mgmt | Marina, CA | California Independent System Operator (CISO) | 9.5 GWh | Mar 1998 | Dec 2025 | Landfill Gas |
| High Desert Power Plant | MRP Generation Holdings, LLC | Victorville, CA | California Independent System Operator (CISO) | 3.3 TWh | Mar 2003 | Aug 2026 | Natural Gas |
| Hanford Energy Park Peaker | MRP San Joaquin Energy LLC. | Hanford, CA | California Independent System Operator (CISO) | 2.1 GWh | Aug 2001 | Aug 2026 | Natural Gas |
| Henrietta Peaker | MRP San Joaquin Energy LLC. | Lemoore, CA | California Independent System Operator (CISO) | 3.5 GWh | May 2002 | Aug 2026 | Natural Gas |
| Tracy Combined Cycle Power Plant | MRP San Joaquin Energy LLC. | Tracy, CA | California Independent System Operator (CISO) | 656.1 GWh | Mar 2003 | Aug 2026 | Natural Gas |
| Mustang Hills LLC | Mustang Hills, LLC (Longroad) | Mojave, CA | California Independent System Operator (CISO) | 267.1 GWh | Apr 2012 | Dec 2025 | Wind |
| National Raisin | National Raisin | Fowler, CA | California Independent System Operator (CISO) | 4.6 GWh | May 2015 | Dec 2025 | Solar |
| Kilroy Solar | Nautilus Solar Solutions | San Diego, CA | California Independent System Operator (CISO) | 6.3 GWh | Dec 2017 | Dec 2025 | Solar |
| Nelson Creek | Nelson Creek Power Inc | Big Bend, CA | California Independent System Operator (CISO) | 2.5 GWh | Sep 1989 | Dec 2025 | Water |
| Bowman | Nevada Irrigation District | Nevada City, CA | California Independent System Operator (CISO) | 14.2 GWh | Aug 1986 | Dec 2025 | Water |
| Deer Creek PH | Nevada Irrigation District | Nevada City, CA | California Independent System Operator (CISO) | 15.2 GWh | Apr 1908 | Dec 2025 | Water |
| Dutch Flat 2 | Nevada Irrigation District | Dutch Flat, CA | California Independent System Operator (CISO) | 15.2 GWh | Oct 1965 | Dec 2025 | Water |
| Chicago Park | Nevada Irrigation District | Colfax, CA | California Independent System Operator (CISO) | 65.2 GWh | Oct 1965 | Dec 2025 | Water |
| Combie South | Nevada Irrigation District | Auburn, CA | California Independent System Operator (CISO) | 4.4 GWh | Mar 1984 | Dec 2025 | Water |
| Scott Flat | Nevada Irrigation District | Nevada City, CA | California Independent System Operator (CISO) | 3.8 GWh | Jan 1985 | Oct 2025 | Water |
| Rollins | Nevada Irrigation District | Colfax, CA | California Independent System Operator (CISO) | 36.9 GWh | Jul 1980 | Dec 2025 | Water |
| New-Indy Ontario Mill | New-Indy Ontario LLC | Ontario, CA | California Independent System Operator (CISO) | 243.6 GWh | May 1985 | Aug 2026 | Natural Gas |
| Oxnard Paper Mill | New-Indy, Oxnard LLC | Oxnard, CA | California Independent System Operator (CISO) | 188.6 GWh | Feb 1986 | Aug 2026 | Natural Gas |
| Desert Sunlight 250, LLC | NextEra Energy Desert Sunlight 250, LLC | Desert Center, CA | California Independent System Operator (CISO) | 516.8 GWh | Oct 2013 | Dec 2025 | Solar |
| Desert Sunlight 300, LLC | NextEra Energy Desert Sunlight 300, LLC | Desert Center, CA | California Independent System Operator (CISO) | 620.2 GWh | Oct 2013 | Dec 2025 | Solar |
| Montezuma Wind II | NextEra Energy Montezuma Wind II, LLC | Birds Landing, CA | California Independent System Operator (CISO) | 195.8 GWh | Dec 2011 | Dec 2025 | Wind |
| Coram Energy LLC (4.5MW) | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 9.0 GWh | Nov 1985 | Dec 2025 | Wind |
| Windstar 1 | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 255.0 GWh | Jan 2012 | Dec 2025 | Wind |
| Coram Energy LLC | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 8.8 GWh | Dec 2004 | Dec 2025 | Wind |
| Coram Energy LLC (ECT) | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 21.6 GWh | Apr 2005 | Dec 2025 | Wind |
| Alta Wind VIII | Nextera Energy Resources | Mojave, CA | California Independent System Operator (CISO) | 219.2 GWh | Dec 2011 | Dec 2025 | Wind |
| Kiefer Landfill Generating Phase II | NextEra Renewable Fuels, LLC | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 30.2 GWh | Mar 2012 | Dec 2025 | Landfill Gas |
| North Rosamond Solar LLC | North Rosamond Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 346.7 GWh | May 2019 | Aug 2026 | Solar |
| North Sky River Energy LLC | North Sky River Energy LLC | Weldon, CA | California Independent System Operator (CISO) | 364.8 GWh | Nov 2012 | Dec 2025 | Wind |
| Lodi Energy Center | Northern California Power Agny | Lodi, CA | California Independent System Operator (CISO) | 532.6 GWh | Oct 2012 | Aug 2026 | Natural Gas |
| Collierville Powerhouse | Northern California Power Agny | Murphys, CA | California Independent System Operator (CISO) | 418.3 GWh | Oct 1989 | Aug 2026 | Water |
| Spicer Meadow Project | Northern California Power Agny | Murphys, CA | California Independent System Operator (CISO) | 14.4 GWh | Oct 1989 | Dec 2025 | Water |
| Alameda | Northern California Power Agny | Alameda, CA | California Independent System Operator (CISO) | 3.0 GWh | Apr 1986 | Dec 2025 | Natural Gas |
| Geothermal 2 | Northern California Power Agny | Middletown, CA | California Independent System Operator (CISO) | 324.8 GWh | Nov 1985 | Aug 2026 | Geothermal |
| Geothermal 1 | Northern California Power Agny | Middletown, CA | California Independent System Operator (CISO) | 309.0 GWh | Dec 1982 | Aug 2026 | Geothermal |
Browse Power Plants By California Counties
Figures are based on August 2026 generation numbers.| County | State Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Kern County, CA | # 1 | 333 | 35.3 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.7 TWh |
| Los Angeles County, CA | # 3 | 325 | 17.3 TWh |
| Riverside County, CA | # 4 | 165 | 14.0 TWh |
| Contra Costa County, CA | # 5 | 59 | 11.8 TWh |
| San Bernardino County, CA | # 6 | 212 | 11.8 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| Fresno County, CA | # 8 | 128 | 7.8 TWh |
| Shasta County, CA | # 9 | 46 | 7.0 TWh |
| Sacramento County, CA | # 10 | 68 | 5.6 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.0 TWh |
| Kings County, CA | # 13 | 59 | 4.0 TWh |
| Butte County, CA | # 14 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 15 | 76 | 3.4 TWh |
| Solano County, CA | # 16 | 41 | 3.0 TWh |
| Monterey County, CA | # 17 | 29 | 3.0 TWh |
| Tuolumne County, CA | # 18 | 23 | 2.9 TWh |
| Alameda County, CA | # 19 | 52 | 2.8 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.7 TWh |
| Orange County, CA | # 21 | 59 | 2.6 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Placer County, CA | # 24 | 26 | 1.8 TWh |
| Sutter County, CA | # 25 | 8 | 1.8 TWh |
| Tulare County, CA | # 26 | 72 | 1.6 TWh |
| San Joaquin County, CA | # 27 | 53 | 1.6 TWh |
| El Dorado County, CA | # 28 | 15 | 1.5 TWh |
| County | State Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Yuba County, CA | # 29 | 5 | 1.5 TWh |
| Madera County, CA | # 30 | 29 | 1.2 TWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Lake County, CA | # 32 | 10 | 892.8 GWh |
| Ventura County, CA | # 33 | 33 | 719.4 GWh |
| Amador County, CA | # 34 | 8 | 608.6 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Calaveras County, CA | # 36 | 6 | 524.3 GWh |
| Merced County, CA | # 37 | 33 | 493.1 GWh |
| Trinity County, CA | # 38 | 5 | 480.6 GWh |
| Humboldt County, CA | # 39 | 10 | 450.0 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Santa Barbara County, CA | # 41 | 18 | 292.9 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| San Benito County, CA | # 43 | 6 | 266.2 GWh |
| Nevada County, CA | # 44 | 12 | 225.7 GWh |
| Yolo County, CA | # 45 | 15 | 196.6 GWh |
| San Mateo County, CA | # 46 | 11 | 133.1 GWh |
| San Francisco County, CA | # 47 | 10 | 80.3 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.7 GWh |
| Napa County, CA | # 50 | 11 | 51.2 GWh |
| Tehama County, CA | # 51 | 7 | 45.8 GWh |
| Sierra County, CA | # 52 | 3 | 28.8 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Glenn County, CA | # 55 | 2 | 12.1 GWh |