| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Fremont CA AutoFactory | Tesla Inc. | Fremont, CA | California Independent System Operator (CISO) | 480.0 MWh | Feb 2022 | Dec 2024 | Solar |
| Clovis High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 826.0 MWh | Mar 2018 | Dec 2024 | Solar |
| Clovis East High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Dec 2024 | Solar |
| Clovis North High School | Tesla Inc. | Fresno, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2017 | Dec 2024 | Solar |
| Intel Folsom | Tesla Inc. | Folsom, CA | Balancing Authority of Northern California (BANC) | 1.5 GWh | Jun 2010 | Dec 2024 | Solar |
| Marathon Bay Area Cogen | Tesoro Marketing & Refining Co. LLC (Martinez) | Martinez, CA | California Independent System Operator (CISO) | 596.8 GWh | Jan 1987 | Mar 2026 | Natural Gas |
| Equilon Los Angeles Refining | Tesoro Refining and Marketing Company | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 239.9 GWh | Nov 1982 | Nov 2025 | Other Gas : 97.9% Natural Gas : 2.1% |
| Berrenda Mesa Water District | The Greater Light USA LLC | Lost Hills, CA | California Independent System Operator (CISO) | 16.5 GWh | Jun 2023 | Dec 2024 | Solar |
| University of the Pacific | The Greater Light USA LLC | Stockton, CA | California Independent System Operator (CISO) | 6.5 GWh | Apr 2022 | Dec 2024 | Solar |
| THUMS | THUMS Long Beach Company | Long Beach, CA | California Independent System Operator (CISO) | 168.7 GWh | Dec 2002 | Mar 2026 | Natural Gas |
| Titan Solar 1 (CA) | Titan Solar 1, LLC | Borrego Springs, CA | California Independent System Operator (CISO) | 134.1 GWh | Nov 2020 | Mar 2026 | Solar |
| Topaz Solar Farm | Topaz Solar Farms LLC | Santa Margarita, CA | California Independent System Operator (CISO) | 1.1 TWh | Mar 2013 | Mar 2026 | Solar |
| Cold Canyon 1 | Toro Energy of California SLO | San Luis Obispo, CA | California Independent System Operator (CISO) | 3.8 GWh | Jun 2013 | Dec 2024 | Landfill Gas |
| Torrance Refining Company, LLC | Torrance Refining Company, LLC | Torrance, CA | California Independent System Operator (CISO) | 70.3 GWh | Aug 1983 | Mar 2026 | Other Gas : 63.3% Waste Heat : 36.7% |
| Toyon Power Station | Toyon Landfill Gas Conversion, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 6.6 GWh | Dec 1985 | Dec 2024 | Landfill Gas |
| Tranquillity ID | Tranquillity Solar 1, LLC | Tranquillity, CA | California Independent System Operator (CISO) | 2.8 GWh | Feb 2018 | Dec 2024 | Solar |
| Sand Bar Power Plant | Tri-Dam Power Authority | Stanislaus Ntl. Fores, CA | California Independent System Operator (CISO) | 85.5 GWh | Apr 1986 | Dec 2024 | Water |
| 20333 Normandie PV, LLC | TRITEC Americas | Torrance, CA | Los Angeles Department of Water and Power (LDWP) | 5.3 GWh | Nov 2021 | Dec 2024 | Solar |
| Trona Solar III | Trona Solar III LLC | Trona, CA | California Independent System Operator (CISO) | 4.5 GWh | Mar 2023 | Dec 2024 | Solar |
| Luciana | Tulare Solar Center, LLC | Richgrove, CA | California Independent System Operator (CISO) | 138.2 GWh | Mar 2022 | Mar 2026 | Solar |
| Don Pedro | Turlock Irrigation District | La Grange, CA | Turlock Irrigation District (TIDC) | 301.4 GWh | Apr 1971 | Mar 2026 | Water |
| Hickman | Turlock Irrigation District | Hickman, CA | Turlock Irrigation District (TIDC) | 3.6 GWh | Aug 1979 | Dec 2024 | Water |
| Turlock Lake | Turlock Irrigation District | Hickman, CA | Turlock Irrigation District (TIDC) | 7.0 GWh | Jun 1980 | Dec 2024 | Water |
| La Grange | Turlock Irrigation District | La Grange, CA | Turlock Irrigation District (TIDC) | 4.4 GWh | Nov 1924 | Dec 2024 | Water |
| Walnut Energy Center | Turlock Irrigation District | Turlock, CA | Turlock Irrigation District (TIDC) | 1.5 TWh | Jan 2006 | Mar 2026 | Natural Gas |
| Upper Dawson | Turlock Irrigation District | La Grange, CA | Turlock Irrigation District (TIDC) | 10.7 GWh | Oct 1983 | Dec 2024 | Water |
| Frankenheimer Power Plant | Turlock Irrigation District | Oakdale, CA | California Independent System Operator (CISO) | 12.6 GWh | Feb 1983 | Oct 2024 | Water |
| Walnut | Turlock Irrigation District | Turlock, CA | Turlock Irrigation District (TIDC) | 429.0 MWh | Mar 1986 | Dec 2024 | Natural Gas : 90.5% Distillate Fuel Oil : 9.5% |
| Almond Power Plant | Turlock Irrigation District | Modesto, CA | Turlock Irrigation District (TIDC) | 143.4 GWh | Mar 1996 | Mar 2026 | Natural Gas |
| US Borax | U S Borax Inc | Boron, CA | California Independent System Operator (CISO) | 258.3 GWh | Jun 1984 | Mar 2026 | Natural Gas |
| Spring Creek | U S Bureau of Reclamation | Redding, CA | Balancing Authority of Northern California (BANC) | 437.4 GWh | Dec 1963 | Mar 2026 | Water |
| Stampede | U S Bureau of Reclamation | Truckee, CA | Nevada Power Company (NEVP) | 11.9 GWh | Dec 1987 | Mar 2026 | Water |
| Folsom | U S Bureau of Reclamation | Folsom, CA | Balancing Authority of Northern California (BANC) | 510.7 GWh | Apr 1955 | Mar 2026 | Water |
| Judge F Carr | U S Bureau of Reclamation | French Gulch, CA | Balancing Authority of Northern California (BANC) | 357.7 GWh | Apr 1963 | Mar 2026 | Water |
| Keswick | U S Bureau of Reclamation | Redding, CA | Balancing Authority of Northern California (BANC) | 410.0 GWh | Sep 1949 | Mar 2026 | Water |
| Nimbus | U S Bureau of Reclamation | Folsom, CA | Balancing Authority of Northern California (BANC) | 44.6 GWh | Apr 1955 | Mar 2026 | Water |
| Parker Dam | U S Bureau of Reclamation | Parker, CA | Western Area Power Administration - Desert Southwest Region (WALC) | 365.7 GWh | Nov 1942 | Mar 2026 | Water |
| New Melones | U S Bureau of Reclamation | Jamestown, CA | Balancing Authority of Northern California (BANC) | 286.5 GWh | May 1979 | Mar 2026 | Water |
| Shasta | U S Bureau of Reclamation | Redding, CA | Balancing Authority of Northern California (BANC) | 2.1 TWh | May 1944 | Mar 2026 | Water |
| Trinity | U S Bureau of Reclamation | Weaverville, CA | Balancing Authority of Northern California (BANC) | 498.5 GWh | Jan 1964 | Mar 2026 | Water |
| UCI Facilities Management Central Plant | University of California Irvine | Irvine, CA | California Independent System Operator (CISO) | 113.2 GWh | Jun 2007 | Mar 2026 | Natural Gas |
| Univ of California San Diego Solar | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2008 | Dec 2024 | Solar |
| University of California San Diego Hybri | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 210.3 GWh | Jun 2001 | Mar 2026 | Natural Gas |
| University of California Santa Cruz | University of California Santa Cruz | Santa Cruz, CA | California Independent System Operator (CISO) | 35.2 GWh | Aug 2013 | Dec 2024 | Natural Gas : 91.7% Solar : 8.3% |
| UCLA So Campus Cogen Project | University of California-LA | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 237.7 GWh | Sep 1993 | Mar 2026 | Natural Gas |
| Parnassus Central Utility Plant | University of California-San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 66.3 GWh | Dec 1995 | Mar 2026 | Natural Gas |
| Energy Center | University of Redlands | Redlands, CA | California Independent System Operator (CISO) | 1.5 GWh | Jan 2007 | Dec 2024 | Natural Gas |
| Univ of San Francisco Cogen | University of San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 5.2 GWh | Aug 1987 | Dec 2024 | Natural Gas |
| Murphys | Utica Water & Power Authority | Murphys, CA | California Independent System Operator (CISO) | 15.5 GWh | Feb 1954 | Dec 2024 | Water |
| Angels | Utica Water & Power Authority | Angels Camp, CA | California Independent System Operator (CISO) | 6.3 GWh | Dec 1939 | Dec 2024 | Water |
| VA Sepulveda Ambulatory Care Center | VA Sepulveda Ambulatory Care Center | North Hills, CA | Los Angeles Department of Water and Power (LDWP) | 3.9 GWh | Sep 2014 | Dec 2024 | Solar |
| Valero Refinery Cogeneration Unit 1 | Valero Refining Co California | Benicia, CA | California Independent System Operator (CISO) | 236.7 GWh | Sep 2002 | Feb 2026 | Natural Gas : 85.2% Other Gas : 14.8% |
| Valero Wilmington Cogeneration Plant | Valero Wilmington | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 228.2 GWh | Oct 2017 | Dec 2024 | Natural Gas |
| CFW Solar X LLC - Vaughn | Valta Energy | San Fernando, CA | Los Angeles Department of Water and Power (LDWP) | 642.0 MWh | Nov 2018 | Dec 2024 | Solar |
| 9150 Hermosa Solar GM | Valta Energy | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 2.8 GWh | Nov 2022 | Dec 2024 | Solar |
| 20701 Plummer PV, LLC | Valta Energy | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 3.1 GWh | Jun 2022 | Dec 2024 | Solar |
| Vasco Winds | Vasco Winds, LLC | Livermore, CA | California Independent System Operator (CISO) | 223.0 GWh | Nov 2011 | Dec 2024 | Wind |
| Vega Solar | Vega Solar, LLC | Los Banos, CA | California Independent System Operator (CISO) | 51.1 GWh | Feb 2015 | Dec 2024 | Solar |
| Venable Solar 1 | Venable Solar, LLC | Blythe, CA | California Independent System Operator (CISO) | 3.4 GWh | Mar 2015 | Dec 2024 | Solar |
| Venable Solar 2 | Venable Solar, LLC | Blythe, CA | California Independent System Operator (CISO) | 3.4 GWh | Mar 2015 | Dec 2024 | Solar |
| Ventura Solar | Ventura Solar LLC | Fillmore, CA | California Independent System Operator (CISO) | 6.2 GWh | Aug 2021 | Dec 2024 | Solar |
| Victory Pass | Victory Pass I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 564.7 GWh | Feb 2024 | Mar 2026 | Solar |
| Vikings Energy Farm | Vikings Energy Farm, LLC | Holtville, CA | Imperial Irrigation District (IID) | 311.4 GWh | Apr 2024 | Mar 2026 | Solar |
| Shelter Creek Condominiums Solar | Vista Solar, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 3.5 GWh | Jan 2020 | Dec 2024 | Solar |
| Bio-Rad | Vista Solar, Inc. | Hercules, CA | California Independent System Operator (CISO) | 3.2 GWh | Sep 2021 | Dec 2024 | Solar |
| Wadham Energy LP | Wadham Energy Ltd Partners | Williams, CA | California Independent System Operator (CISO) | 132.0 GWh | Feb 1989 | Dec 2024 | Agricultural By-Products : 99.7% |
| Walnut Creek Energy Park | Walnut Creek LLC | Industry, CA | California Independent System Operator (CISO) | 40.5 GWh | Mar 2013 | Mar 2026 | Natural Gas |
| Watkins Manufacturing Co. | Watkins Manufacturing Corporation | San Diego, CA | California Independent System Operator (CISO) | 7.7 GWh | Oct 2001 | Mar 2026 | Natural Gas |
| High Sierra Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 14.1 GWh | Feb 1989 | Dec 2024 | Natural Gas |
| Kern Front Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 12.2 GWh | Jan 1989 | Dec 2024 | Natural Gas |
| McKittrick Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 4.4 GWh | Sep 1991 | Mar 2026 | Natural Gas |
| Badger Creek Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 4.5 GWh | Mar 1991 | Mar 2026 | Natural Gas |
| Live Oak Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 20.1 GWh | Feb 1992 | Mar 2026 | Natural Gas |
| Chalk Cliff Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 3.0 GWh | Feb 1990 | Mar 2026 | Natural Gas |
| Double C Generation Limited Partnership | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 14.9 GWh | Feb 1989 | Dec 2024 | Natural Gas |
| Bear Mountain Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 36.1 GWh | Mar 1995 | Mar 2026 | Natural Gas |
| El Cajon Energy Center | Wellhead Services, Inc | El Cajon, CA | California Independent System Operator (CISO) | 9.0 GWh | May 2010 | Dec 2024 | Natural Gas |
| Escondido Energy Center | Wellhead Services, Inc | Escondido, CA | California Independent System Operator (CISO) | 9.4 GWh | Dec 2013 | Dec 2024 | Natural Gas |
| Chula Vista Energy Center | Wellhead Services, Inc | Chula Vista, CA | California Independent System Operator (CISO) | 1.8 GWh | Apr 2001 | Nov 2024 | Natural Gas |
| Fresno Cogen Partners | Wellhead Services, Inc | San Joaquin, CA | California Independent System Operator (CISO) | 2.4 GWh | Dec 1989 | Dec 2024 | Natural Gas |
| Yuba City Cogen Partners | Wellhead Services, Inc | Yuba City, CA | California Independent System Operator (CISO) | 22.9 GWh | Nov 1990 | Dec 2024 | Natural Gas |
| Wellhead Power Panoche | Wellhead Services, Inc | Firebaugh, CA | California Independent System Operator (CISO) | 3.3 GWh | Jul 1973 | Dec 2024 | Natural Gas |
| Delano Energy Center | Wellhead Services, Inc | Delano, CA | California Independent System Operator (CISO) | 7.3 GWh | Dec 2012 | Dec 2024 | Natural Gas |
| Stanton Energy Reliability Center Hybrid | Wellhead Services, Inc | Stanton, CA | California Independent System Operator (CISO) | 1.7 GWh | Jun 2020 | Mar 2026 | Natural Gas |
| Fresno Solar | Wellhead Services, Inc | San Joaquin, CA | California Independent System Operator (CISO) | 4.7 GWh | Sep 2015 | Dec 2024 | Solar |
| West Tambo Clean Power II | West Tambo Clean Power II | Livingston, CA | California Independent System Operator (CISO) | 877.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Sutter Home Winery GIR | Westbound Solar 3, LLC | American Canyon, CA | California Independent System Operator (CISO) | 1.8 GWh | Jul 2023 | Dec 2024 | Solar |
| Western Power & Steam Inc | Western Power and Steam II LLC | Bakersfield, CA | California Independent System Operator (CISO) | 19.7 GWh | Feb 1990 | Mar 2026 | Natural Gas |
| Almond | Westlands Almond LLC | Lemoore, CA | California Independent System Operator (CISO) | 39.2 GWh | Aug 2023 | Dec 2024 | Solar |
| Solar Blue | Westlands Solar Blue (OZ) Owner, LLC | Lemoore, CA | California Independent System Operator (CISO) | 650.5 GWh | Nov 2023 | Mar 2026 | Solar |
| Westside Solar Power PV1 | Westside Assets LLC | Lemoore, CA | California Independent System Operator (CISO) | 4.9 GWh | Apr 2016 | Dec 2024 | Solar |
| NextEra Westside PV | Westside Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 40.6 GWh | Feb 2017 | Dec 2024 | Solar |
| Whitethorn Solar LLC | Whitethorn Solar LLC | Livermore, CA | California Independent System Operator (CISO) | 4.2 GWh | Jan 2016 | Dec 2024 | Solar |
| Whitney Point Solar | Whitney Point Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 44.4 GWh | Feb 2017 | Dec 2024 | Solar |
| Willow Spring Solar, LLC | Willow Spring Solar LLC | Rosamond, CA | California Independent System Operator (CISO) | 239.9 GWh | Dec 2018 | Mar 2026 | Solar |
| Victory Garden (Tehachapi) | Wind Stream Operations LLC | Tehachapi, CA | California Independent System Operator (CISO) | 33.0 GWh | Nov 1981 | Dec 2024 | Wind |
| Helzel & Schwarzhoff 86 | Wind Stream Operations LLC | Tehachapi, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 1986 | Dec 2024 | Wind |
| ZCO | Wind Stream Operations LLC | Tehachapi, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 1985 | Dec 2024 | Wind |
| 85 B | Wind Wall 1 LLC | Tehachapi, CA | California Independent System Operator (CISO) | 97.6 GWh | Dec 1984 | Dec 2024 | Wind |
| 85 A | Wind Wall 1 LLC | Tehachapi, CA | California Independent System Operator (CISO) | 71.2 GWh | Dec 1984 | Dec 2024 | Wind |
Browse Power Plants By California Counties
Figures are based on March 2026 generation numbers.| County | State Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Kern County, CA | # 1 | 313 | 35.2 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 19.7 TWh |
| Los Angeles County, CA | # 3 | 308 | 17.0 TWh |
| Riverside County, CA | # 4 | 159 | 14.8 TWh |
| Contra Costa County, CA | # 5 | 56 | 13.0 TWh |
| San Bernardino County, CA | # 6 | 204 | 12.0 TWh |
| Imperial County, CA | # 7 | 84 | 9.5 TWh |
| Fresno County, CA | # 8 | 119 | 7.6 TWh |
| Shasta County, CA | # 9 | 46 | 7.3 TWh |
| Sacramento County, CA | # 10 | 65 | 5.7 TWh |
| Sonoma County, CA | # 11 | 26 | 5.1 TWh |
| San Diego County, CA | # 12 | 151 | 4.4 TWh |
| Kings County, CA | # 13 | 57 | 4.2 TWh |
| Santa Clara County, CA | # 14 | 75 | 3.5 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Solano County, CA | # 16 | 40 | 3.1 TWh |
| Tuolumne County, CA | # 17 | 23 | 3.0 TWh |
| Alameda County, CA | # 18 | 47 | 2.7 TWh |
| Stanislaus County, CA | # 19 | 25 | 2.7 TWh |
| Orange County, CA | # 20 | 59 | 2.6 TWh |
| Monterey County, CA | # 21 | 29 | 2.4 TWh |
| Colusa County, CA | # 22 | 3 | 2.2 TWh |
| Plumas County, CA | # 23 | 13 | 2.0 TWh |
| Placer County, CA | # 24 | 24 | 1.8 TWh |
| Sutter County, CA | # 25 | 8 | 1.7 TWh |
| El Dorado County, CA | # 26 | 15 | 1.6 TWh |
| San Joaquin County, CA | # 27 | 47 | 1.6 TWh |
| Tulare County, CA | # 28 | 69 | 1.6 TWh |
| County | State Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Yuba County, CA | # 29 | 5 | 1.5 TWh |
| Madera County, CA | # 30 | 28 | 1.2 TWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Lake County, CA | # 32 | 10 | 908.4 GWh |
| Mono County, CA | # 33 | 9 | 785.9 GWh |
| Ventura County, CA | # 34 | 32 | 743.6 GWh |
| Amador County, CA | # 35 | 8 | 621.1 GWh |
| Calaveras County, CA | # 36 | 6 | 555.5 GWh |
| Merced County, CA | # 37 | 31 | 549.1 GWh |
| Trinity County, CA | # 38 | 5 | 514.3 GWh |
| Humboldt County, CA | # 39 | 10 | 450.9 GWh |
| Lassen County, CA | # 40 | 9 | 341.0 GWh |
| Santa Barbara County, CA | # 41 | 18 | 316.4 GWh |
| Mariposa County, CA | # 42 | 2 | 299.7 GWh |
| San Benito County, CA | # 43 | 6 | 271.3 GWh |
| Nevada County, CA | # 44 | 12 | 219.1 GWh |
| Yolo County, CA | # 45 | 15 | 210.6 GWh |
| San Mateo County, CA | # 46 | 11 | 134.3 GWh |
| Siskiyou County, CA | # 47 | 8 | 89.8 GWh |
| San Francisco County, CA | # 48 | 10 | 82.1 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.5 GWh |
| Tehama County, CA | # 50 | 7 | 59.3 GWh |
| Napa County, CA | # 51 | 9 | 51.0 GWh |
| Marin County, CA | # 52 | 3 | 19.0 GWh |
| Glenn County, CA | # 53 | 2 | 18.7 GWh |
| Mendocino County, CA | # 54 | 5 | 12.3 GWh |
| Sierra County, CA | # 55 | 3 | 11.9 GWh |