Nacimiento Hydro Project
10690 Nacimiento Lake Drive, Bradley, CA 93426Plant Summary Information
Nacimiento Hydro Project is ranked #130 out of 209 hydroelectric power plants in California in terms of total annual net electricity generation.
Nacimiento Hydro Project is comprised of 2 generators and generated 608.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Nacimiento Hydro Project |
|---|---|
| Utility Name | Monterey Cnty Water Res Agency |
| Location | San Luis Obispo County, CA |
| Initial Operation Date | July 1987 |
| Last Update | Dec 2024 |
| Annual Generation | 18.2 GWh |
| Annual Consumption | 62.2 k MMBtu |
| Ranked #5,370 out of 12,539 Power Plants Nationwide | |
| Ranked #771 out of 1,332 Water Power Plants Nationwide | |
| Ranked #713 out of 1,600 California Power Plants | |
| Ranked #130 out of 209 California Water Power Plants | |
| Fuel Types | Water |
Map of Nacimiento Hydro Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Nacimiento Hydro Project.
Monthly Net Generation for Nacimiento Hydro Project
Nacimiento Hydro Project Details
| Summary Information | |
|---|---|
| Plant Name | Nacimiento Hydro Project (50352) |
| Plant Address | 10690 Nacimiento Lake Drive, Bradley, CA 93426 |
| Utility | Monterey Cnty Water Res Agency (12850) |
| Latitude, Longitude | 35.79858, -120.88333 |
| Generation Dates on File | Jan 2001 to Dec 2024 |
| Initial Operation Date | July 1987 |
| Annual Generation | 18.2 GWh |
| Fuel Types | Water |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Nacimiento Reservoir |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 21.00 kV |
| Energy Storage | No |
Generator 1 Details Operating July 1987
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 4 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 3.7 MW |
| Winter Capacity | 3.6 MW |
| Minimum Load | 0.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1987 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator 2 Details Operating July 1987
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1987 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Nacimiento Hydro Project Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #761 | Boatlock | Holyoke, MA | 18.9 GWh |
| #762 | Basalt | Aspen, CO | 18.8 GWh |
| #763 | Portal | Lakeshore, CA | 18.7 GWh |
| #764 | Youngs Creek Hydroelectric Project | Monroe, WA | 18.7 GWh |
| #765 | West Delaware Tunnel Plant | Grahamsville, NY | 18.6 GWh |
| #766 | Wausau | Wausau, WI | 18.6 GWh |
| #767 | Reusens | Lynchburg, VA | 18.5 GWh |
| #768 | Allison Creek Hydro | Valdez, AK | 18.5 GWh |
| #769 | Cove Hydroelectric | Burney, CA | 18.4 GWh |
| #770 | Pioneer | Ogden, UT | 18.3 GWh |
| #772 | Guernsey | Guernsey, WY | 18.0 GWh |
| #773 | Island Park | Island Park, ID | 17.9 GWh |
| #774 | PEC Headworks | Moses Lake, WA | 17.8 GWh |
| #775 | International Paper Riley Hydro | Jay, ME | 17.7 GWh |
| #776 | Wailuku River Hydroelectric | Hilo, HI | 17.7 GWh |
| #777 | Shoshone (WY) | Cody, WY | 17.6 GWh |
| #778 | Haypress | Sierra City, CA | 17.6 GWh |
| #779 | Spaulding 1 | Emigrant Gap, CA | 17.6 GWh |
| #780 | Moline | Moline, IL | 18.6 GWh |
| #781 | Oakdale | Monticello, IN | 17.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Nacimiento Hydro Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Aera San Ardo Cogen Facility | San Ardo, CA | 17.2 GWh | 10.8 mi |
| Atascadero State Hospital | Atascadero, CA | 2.8 GWh | 27.1 mi |
| Blackjack Solar | King City, CA | 8.8 GWh | 27.6 mi |
| CA Flats Solar 130, LLC | Shandon, CA | 262.5 GWh | 29.7 mi |
| CA Flats Solar 150, LLC | Shandon, CA | 299.6 GWh | 29.7 mi |
| CA-DGS-California Men's Colony | San Luis Obispo, CA | 4.6 GWh | 34.4 mi |
| Camp San Luis Obispo | San Luis Obispo, CA | 158.0 MWh | 34 mi |
| Coalinga 25D Cogen | Coalinga, CA | 42.3 GWh | 36.7 mi |
| Coalinga Cogeneration Facility | Coalinga, CA | 35.9 GWh | 38.8 mi |
| Diablo Canyon | Avila Beach, CA | 18.5 TWh | 40.6 mi |
| Firestone Walker Brewery - Phase 1 | Paso Robles, CA | 3.3 GWh | 17.6 mi |
| Foundation Scheid Vineyards | Greenfield, CA | 3.9 GWh | 37.1 mi |
| King City Peaking | King City, CA | 11.9 GWh | 32.4 mi |
| King City Power Plant | King City, CA | 31.4 GWh | 32.5 mi |
| Meridian Vineyards | Paso Robles, CA | 1.0 GWh | 19.8 mi |
| Paso Robles - Municipal Airport | Paso Robles, CA | 6.0 GWh | 16.1 mi |
| Salinas River Cogeneration | San Ardo, CA | 258.0 GWh | 10.6 mi |
| Stenner Creek Solar | San Luis Obispo, CA | 9.5 GWh | 34.8 mi |
| Sutter Home Winery TCC | Paso Robles, CA | 1.1 GWh | 11.9 mi |
| Vintner Solar | Templeton, CA | 4.2 GWh | 20.1 mi |