Mojave Solar Project
42134 Harper Lake Road, Hinkley, CA 92347Plant Summary Information
Mojave Solar Project is ranked #44 out of 5,666 solar farms nationwide in terms of total annual net electricity generation.
Mojave Solar Project generated 47.9 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Mojave Solar Project |
---|---|
Utility Name | Mojave Solar LLC |
Location | San Bernardino County, CA |
Initial Operation Date | December 2014 |
Last Update | Mar 2025 |
Annual Generation | 600.3 GWh |
Annual Consumption | 6.6 M MMBtu |
Ranked #1,112 out of 11,623 Power Plants Nationwide | |
Ranked #44 out of 5,666 Solar Power Plants Nationwide | |
Ranked #60 out of 1,487 California Power Plants | |
Ranked #17 out of 761 California Solar Power Plants | |
Fuel Types | Solar |
Map of Mojave Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mojave Solar Project.
Monthly Net Generation for Mojave Solar Project
Mojave Solar Project Details
Summary Information | |
---|---|
Plant Name | Mojave Solar Project (57331) |
Plant Address | 42134 Harper Lake Road, Hinkley, CA 92347 |
Utility | Mojave Solar LLC (56660) |
Latitude, Longitude | 35.01772, -117.33914 |
Generation Dates on File | Jan 2015 to Mar 2025 |
Initial Operation Date | December 2014 |
Annual Generation | 600.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | On-Site Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | No |
Generator MSP1 Details Operating December 2014
Technology | Solar Thermal without Energy Storage |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 140 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 137.5 MW |
Winter Capacity | 100 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2014 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Startup Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Subcritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Parabolic Trough | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator MSP2 Details Operating December 2014
Technology | Solar Thermal without Energy Storage |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 140 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 137.5 MW |
Winter Capacity | 100 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2014 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Startup Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Parabolic Trough | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Mojave Solar Project Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#34 | Genesis Solar Energy Project | Blythe, CA | 642.6 GWh |
#35 | IP Radian, LLC | Brookesmith, TX | 632.3 GWh |
#36 | Arrow Canyon Solar Hybrid | Moapa, NV | 614.0 GWh |
#37 | California Valley Solar Ranch | California Valley, CA | 623.8 GWh |
#38 | Moapa Southern Paiute | Moapa, NV | 623.1 GWh |
#39 | Copper Mountain Solar 3 | Boulder City, NV | 621.3 GWh |
#40 | Stateline Solar | Nipton, CA | 618.5 GWh |
#41 | Oberon II Solar Project | Desert Center, CA | 593.0 GWh |
#42 | McCoy Solar Energy Project Hybrid | Blythe, CA | 524.7 GWh |
#43 | Titan Solar Project | Van Horn, TX | 601.7 GWh |
#45 | Bighorn Solar 1 | Pueblo, CO | 594.3 GWh |
#46 | Blythe Solar 110, LLC | Blythe, CA | 584.2 GWh |
#47 | Agua Caliente Solar Project | Dateland, AZ | 591.7 GWh |
#48 | Blythe Mesa Solar II | Blythe, CA | 571.8 GWh |
#49 | Victory Pass | Desert Center, CA | 575.1 GWh |
#50 | Eleven Mile Solar Center | Coolidge, AZ | 546.9 GWh |
#51 | Thunder Wolf Energy Center Hybrid | Avondale, CO | 556.8 GWh |
#52 | RE Maplewood | McCamey, TX | 570.5 GWh |
#53 | AV Solar Ranch One | Lancaster, CA | 569.0 GWh |
#54 | Texas Solar Nova 2 | Spur, TX | 565.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mojave Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alamo Solar | Oro Grande, CA | 43.7 GWh | 23.2 mi |
Baldy Mesa 2_Silver Peak Hybrid | Adelanto, CA | 7.2 GWh | 29 mi |
Baldy Mesa Solar & Storage | Adelanto, CA | 75.6 GWh | 29 mi |
Daggett 2 | Daggett, CA | 537.9 GWh | 29.5 mi |
Daggett 3 | Daggett, CA | 883.6 GWh | 29.5 mi |
Expressway Solar B | Victorville, CA | 4.1 GWh | 30 mi |
Expressway Solar C2 | Victorville, CA | 3.5 GWh | 29.9 mi |
High Desert Power Plant | Victorville, CA | 3.8 TWh | 29.2 mi |
Hudson - High Desert Hybrid | Victorville, CA | 280.3 GWh | 26.4 mi |
Lockhart ESS, LLC | Hinkley, CA | 23.2 GWh | 1.4 mi |
Lockhart Solar PV II | Hinkley, CA | 194.2 GWh | 1.9 mi |
Lockhart Solar PV, LLC | Hinkley, CA | 227.7 GWh | 1.3 mi |
Madelyn Solar, LLC | Silver Lake, CA | 2.5 GWh | 17.3 mi |
Mitchell Solar, LLC | Silver Lake, CA | 2.6 GWh | 17.5 mi |
Resurgence Solar | Boron, CA | 247.5 GWh | 11.7 mi |
Resurgence Solar II | Boron, CA | 133.7 GWh | 11.7 mi |
Rudy Solar, LLC | Silver Lake, CA | 2.6 GWh | 17.4 mi |
SEGS IX | Hinkley, CA | 112.0 GWh | 1.1 mi |
SunEdison Walmart Apple Valley DC | Apple Valley, CA | 969.0 MWh | 30.1 mi |
US Borax | Boron, CA | 271.2 GWh | 20.5 mi |