Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| EMWD - San Jacinto RWRF NEM | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 3.1 GWh | Jun 2021 | Dec 2025 | Solar |
| EMWD - Perris Valley RWRF | SkyHigh 2 Solar | Perris, CA | California Independent System Operator (CISO) | 8.2 GWh | Jun 2021 | Dec 2025 | Solar |
| Firestone Walker Brewery - Phase 1 | SkyHigh 2 Solar | Paso Robles, CA | California Independent System Operator (CISO) | 3.9 GWh | Oct 2020 | Dec 2025 | Solar |
| SloughHouse Solar, LLC | SloughHouse Solar, LLC | SloughHouse, CA | Balancing Authority of Northern California (BANC) | 117.9 GWh | Jun 2025 | Aug 2026 | Solar |
| Ponderosa Bailey Creek | Snow Mountain Hydro LLC | Manton, CA | California Independent System Operator (CISO) | 3.9 GWh | Feb 1990 | Dec 2025 | Water |
| Lost Creek I | Snow Mountain Hydro LLC | Burney, CA | California Independent System Operator (CISO) | 5.9 GWh | Nov 1989 | Dec 2025 | Water |
| Cove Hydroelectric | Snow Mountain Hydro LLC | Burney, CA | California Independent System Operator (CISO) | 17.4 GWh | Jan 1990 | Dec 2025 | Water |
| Burney Creek | Snow Mountain Hydro LLC | Burney, CA | California Independent System Operator (CISO) | 8.6 GWh | Feb 1990 | Dec 2025 | Water |
| Soboba Community Solar Project | Soboba Band of Luiseno Indians | San Jacinto, CA | California Independent System Operator (CISO) | 3.6 GWh | Jul 2016 | Dec 2025 | Solar |
| Civic Center East | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 2020 | Dec 2025 | Solar |
| Bob Wiley Detention Center | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 2.8 GWh | Aug 2020 | Dec 2025 | Solar |
| Tulare Akers Professional Center | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2019 | Dec 2025 | Solar |
| City of Atwater NEM | SoCore Energy LLC | Atwater, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2024 | Dec 2025 | Solar |
| Government Plaza Solar | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 1.8 GWh | Oct 2020 | Dec 2025 | Solar |
| North Juvenile Detention Center Solar | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 2.3 GWh | Oct 2019 | Dec 2025 | Solar |
| South County Detention Center Solar | SoCore Energy LLC | Porterville, CA | California Independent System Operator (CISO) | 2.4 GWh | Oct 2019 | Dec 2025 | Solar |
| Sol Orchard El Centro PV | Sol Orchard Imperial 1, LLC | El Centro, CA | Imperial Irrigation District (IID) | 45.1 GWh | Sep 2013 | Dec 2025 | Solar |
| Solano County Cogen Plant | Solano County - (CA) | Fairfield, CA | California Independent System Operator (CISO) | 7.9 GWh | May 1989 | Dec 2025 | Natural Gas |
| Monticello Dam | Solano Irrigation District | Winters, CA | California Independent System Operator (CISO) | 40.7 GWh | May 1983 | Dec 2025 | Water |
| Community Solar 1 | Solar Community I LLC | Brawley, CA | Imperial Irrigation District (IID) | 15.1 GWh | May 2014 | Dec 2025 | Solar |
| City of Long Beach Airport Lot A & B | Solar DG CA Long Beach, LLC | Long Beach, CA | Los Angeles Department of Water and Power (LDWP) | 3.4 GWh | Jan 2024 | Dec 2025 | Solar |
| Solar Oasis LLC | Solar Oasis, LLC | Palmdale, CA | California Independent System Operator (CISO) | 52.7 GWh | Dec 2015 | Dec 2025 | Solar |
| Corcoran Irrigation District Floating So | Solar Powered Ag, LLC | Corcoran, CA | California Independent System Operator (CISO) | 3.5 GWh | Apr 2025 | Dec 2025 | Solar |
| Bear Creek Solar (Orinda) | Solar Star Bear Creek, LLC | Orinda, CA | California Independent System Operator (CISO) | 7.4 GWh | Mar 2025 | Dec 2025 | Solar |
| Solar Star California II LLC | Solar Star California II LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 3.8 GWh | Jul 2012 | Dec 2025 | Solar |
| County of San Diego COC Hybrid | Solar Star California LXXVIII, LLC | San Diego, CA | California Independent System Operator (CISO) | 3.1 GWh | Jun 2020 | Dec 2025 | Solar |
| Solar Star 1 | Solar Star California XIX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 879.1 GWh | Feb 2014 | Aug 2026 | Solar |
| Solar Star 2 | Solar Star California XX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 769.1 GWh | Feb 2014 | Aug 2026 | Solar |
| Tequesquite Landfill Solar PV Project | Solar Star California XXXI, LLC | Riverside, CA | California Independent System Operator (CISO) | 10.8 GWh | Sep 2015 | Dec 2025 | Solar |
| UC Davis South Campus | Solar Star California XXXII, LLC | Davis, CA | California Independent System Operator (CISO) | 11.9 GWh | Feb 2015 | Dec 2025 | Solar |
| Orange Coast College PH2 Solar Project | Solar Star Coastal Pirate, LLC | Costa Mesa, CA | California Independent System Operator (CISO) | 4.0 GWh | Apr 2022 | Dec 2025 | Solar |
| Amazon Bakersfield 1 Solar Project | Solar Star Prime 3, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 8.3 GWh | Dec 2023 | Dec 2025 | Solar |
| Amazon SAN3 Solar Project | Solar Star Prime 4 LLC | San Diego, CA | California Independent System Operator (CISO) | 8.4 GWh | Apr 2024 | Dec 2025 | Solar |
| 2127 Harris Solar Project | Solarenewal LLC | Live Oak, CA | California Independent System Operator (CISO) | 885.0 MWh | Mar 2014 | Dec 2025 | Solar |
| 2081 Terzian Solar Project | Solarenewal LLC | Reedley, CA | California Independent System Operator (CISO) | 1.2 GWh | Jan 2014 | Dec 2025 | Solar |
| 2097 Helton Solar Project | Solarenewal LLC | Merced, CA | California Independent System Operator (CISO) | 1.1 GWh | Mar 2014 | Dec 2025 | Solar |
| Santa Rosa Junior College Petaluma Solar | Sonoma County Junior College District | Petaluma, CA | California Independent System Operator (CISO) | 1.7 GWh | Jun 2018 | Dec 2025 | Solar |
| Soscol Ferry Solar | Soscol Ferry Solar | Napa, CA | California Independent System Operator (CISO) | 4.5 GWh | Nov 2020 | Dec 2025 | Solar |
| Blackjack Solar | South County Packing | King City, CA | California Independent System Operator (CISO) | 9.0 GWh | Nov 2020 | Dec 2025 | Solar |
| Woodleaf | South Feather Water and Power Agency | Forbestown, CA | California Independent System Operator (CISO) | 167.1 GWh | Oct 1963 | Dec 2025 | Water |
| Kelly Ridge | South Feather Water and Power Agency | Oroville, CA | California Independent System Operator (CISO) | 69.1 GWh | Aug 1963 | Dec 2025 | Water |
| Sly Creek | South Feather Water and Power Agency | Forbestown, CA | California Independent System Operator (CISO) | 27.2 GWh | Jun 1983 | Dec 2025 | Water |
| Forbestown | South Feather Water and Power Agency | Forbestown, CA | California Independent System Operator (CISO) | 114.9 GWh | Sep 1963 | Dec 2025 | Water |
| Robert O Schulz Solar Farm | South San Joaquin Irr District | Oakdale, CA | California Independent System Operator (CISO) | 3.9 GWh | Apr 2008 | Dec 2025 | Solar |
| Sacramento Municipal Util Dist | South Sutter Water District | Sacramento, CA | California Independent System Operator (CISO) | 14.2 GWh | Jan 1985 | Dec 2025 | Water |
| J S Eastwood | Southern California Edison Co | Shaver Lake, CA | California Independent System Operator (CISO) | 90.6 GWh | Nov 1987 | Aug 2026 | Water |
| Big Creek 2 | Southern California Edison Co | Auberry, CA | California Independent System Operator (CISO) | 376.6 GWh | Nov 1913 | Dec 2025 | Water |
| Mammoth Pool | Southern California Edison Co | North Fork, CA | California Independent System Operator (CISO) | 583.8 GWh | Feb 1960 | Aug 2026 | Water |
| Lundy | Southern California Edison Co | Lee Vining, CA | California Independent System Operator (CISO) | 6.7 GWh | Nov 1911 | Dec 2025 | Water |
| Big Creek 8 | Southern California Edison Co | Auberry, CA | California Independent System Operator (CISO) | 151.8 GWh | Jul 1921 | Dec 2025 | Water |
| Kern River 1 | Southern California Edison Co | Bakersfield, CA | California Independent System Operator (CISO) | 175.7 GWh | Apr 1907 | Dec 2025 | Water |
| Solar Photovoltaic Project #42 | Southern California Edison Co | Tulare, CA | California Independent System Operator (CISO) | 6.4 GWh | Oct 2012 | Dec 2025 | Solar |
| Big Creek 2A | Southern California Edison Co | Auberry, CA | California Independent System Operator (CISO) | 322.4 GWh | Jul 1928 | Aug 2026 | Water |
| Bishop Creek 2 | Southern California Edison Co | Bishop, CA | California Independent System Operator (CISO) | 13.2 GWh | Oct 1908 | Dec 2025 | Water |
| Big Creek 1 | Southern California Edison Co | Big Creek, CA | California Independent System Operator (CISO) | 409.1 GWh | Oct 1913 | Dec 2025 | Water |
| Bishop Creek 3 | Southern California Edison Co | Bishop, CA | California Independent System Operator (CISO) | 23.9 GWh | May 1913 | Dec 2025 | Water |
| Bishop Creek 4 | Southern California Edison Co | Bishop, CA | California Independent System Operator (CISO) | 35.8 GWh | Aug 1905 | Dec 2025 | Water |
| Bishop Creek 5 | Southern California Edison Co | Bishop, CA | California Independent System Operator (CISO) | 10.7 GWh | May 1919 | Dec 2025 | Water |
| Big Creek 4 | Southern California Edison Co | North Fork, CA | California Independent System Operator (CISO) | 405.3 GWh | May 1951 | Aug 2026 | Water |
| Bishop Creek 6 | Southern California Edison Co | Bishop, CA | California Independent System Operator (CISO) | 8.9 GWh | Feb 1913 | Dec 2025 | Water |
| Fontana | Southern California Edison Co | Rialto, CA | California Independent System Operator (CISO) | 1.9 GWh | Nov 1917 | Nov 2025 | Water |
| Kern River 3 | Southern California Edison Co | Kernville, CA | California Independent System Operator (CISO) | 142.6 GWh | Feb 1921 | Dec 2025 | Water |
| Big Creek 3 | Southern California Edison Co | Auberry, CA | California Independent System Operator (CISO) | 764.5 GWh | Aug 1923 | Aug 2026 | Water |
| Poole | Southern California Edison Co | Lee Vining, CA | California Independent System Operator (CISO) | 22.3 GWh | Apr 1924 | Dec 2025 | Water |
| Pebbly Beach Generating Station Hybrid | Southern California Edison Co | Avalon, CA | California Independent System Operator (CISO) | 28.4 GWh | Jun 1958 | Aug 2026 | Distillate Fuel Oil : 95.8% Gaseous Propane : 4.2% |
| Mill Creek 3 | Southern California Edison Co | Mill Creek, CA | California Independent System Operator (CISO) | 771.0 MWh | Feb 1903 | Dec 2025 | Water |
| McGrath Peaker | Southern California Edison Co | Oxnard, CA | California Independent System Operator (CISO) | 2.6 GWh | Oct 2012 | Dec 2025 | Natural Gas |
| Grapeland Hybrid | Southern California Edison Co | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 2.2 GWh | Aug 2007 | Dec 2025 | Natural Gas |
| Mira Loma Peaker | Southern California Edison Co | Ontario, CA | California Independent System Operator (CISO) | 1.1 GWh | Aug 2007 | Dec 2025 | Natural Gas |
| Barre Peaker | Southern California Edison Co | Stanton, CA | California Independent System Operator (CISO) | 5.4 GWh | Aug 2007 | Nov 2025 | Natural Gas |
| Center Hybrid | Southern California Edison Co | Norwalk, CA | California Independent System Operator (CISO) | 2.0 GWh | Aug 2007 | Dec 2025 | Natural Gas |
| Mountainview Generating Station | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 1.2 TWh | Nov 2005 | Aug 2026 | Natural Gas |
| Rush Creek | Southern California Edison Co | June lake, CA | California Independent System Operator (CISO) | 30.0 GWh | Sep 1916 | Dec 2025 | Water |
| Portal | Southern California Edison Co | Lakeshore, CA | California Independent System Operator (CISO) | 26.2 GWh | Nov 1956 | Dec 2025 | Water |
| Adobe Solar | Southern Power Co | Arvin, CA | California Independent System Operator (CISO) | 36.4 GWh | Apr 2014 | Dec 2025 | Solar |
| Calipatria Solar Farm | Southern Power Co | Calipatria, CA | Imperial Irrigation District (IID) | 36.1 GWh | Jan 2016 | Dec 2025 | Solar |
| Campo Verde Solar | Southern Power Co | El Centro, CA | California Independent System Operator (CISO) | 292.7 GWh | Sep 2013 | Dec 2025 | Solar |
| RE Garland A | Southern Power Co | Rosamond, CA | California Independent System Operator (CISO) | 56.7 GWh | Aug 2016 | Dec 2025 | Solar |
| North Star Solar | Southern Power Co | Mendota, CA | California Independent System Operator (CISO) | 133.2 GWh | May 2015 | Dec 2025 | Solar |
| Gaskell West 1 Solar Facility | Southern Power Co | Lancaster, CA | California Independent System Operator (CISO) | 55.6 GWh | Feb 2018 | Dec 2025 | Solar |
| RE Garland | Southern Power Co | Rosamond, CA | California Independent System Operator (CISO) | 509.7 GWh | Oct 2016 | Dec 2025 | Solar |
| Lost Hills/Blackwell | Southern Power Co | Lost Hills, CA | California Independent System Operator (CISO) | 58.9 GWh | Mar 2015 | Dec 2025 | Solar |
| Stateline Solar | Southern Power Co | Nipton, CA | California Independent System Operator (CISO) | 640.1 GWh | Nov 2015 | Dec 2025 | Solar |
| Henrietta Solar Project | Southern Power Co | Lemoore, CA | California Independent System Operator (CISO) | 170.4 GWh | Jul 2016 | Dec 2025 | Solar |
| Solar Gen 2 Solar Facility | Southern Power Co | Calipatria, CA | California Independent System Operator (CISO) | 376.7 GWh | Oct 2014 | Dec 2025 | Solar |
| Morelos del Sol | Southern Power Co | Lost Hills, CA | California Independent System Operator (CISO) | 31.2 GWh | Oct 2015 | Dec 2025 | Solar |
| RE Tranquillity | Southern Power Co | Cantua Creek, CA | California Independent System Operator (CISO) | 484.8 GWh | Jun 2016 | Dec 2025 | Solar |
| Spreckels Sugar Company | Spreckels Sugar Company | Brawley, CA | Imperial Irrigation District (IID) | 19.9 GWh | Mar 1948 | Dec 2024 | Natural Gas |
| Atwell Island | SPS Atwell Island LLC | Alpaugh, CA | California Independent System Operator (CISO) | 33.9 GWh | Feb 2013 | Dec 2025 | Solar |
| Santa Rita Jail Fuel Cell | SRJFC, LLC | Dublin, CA | California Independent System Operator (CISO) | 8.1 GWh | Nov 2016 | Dec 2025 | Natural Gas |
| San Antonio West Solar Rooftop | SS San Antonio West LLC | Chino, CA | California Independent System Operator (CISO) | 2.3 GWh | Jul 2012 | Dec 2025 | Solar |
| Stage Gulch Solar | Stage Gulch Solar, LLC | Petaluma, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Dec 2025 | Solar |
| SSI West Riverside Landfill LLC | Standard Solar | Riverside, CA | Los Angeles Department of Water and Power (LDWP) | 4.1 GWh | Oct 2020 | Dec 2025 | Solar |
| Nachtigall 1836-WD | Standard Solar | Wasco, CA | California Independent System Operator (CISO) | 11.0 GWh | Nov 2024 | Dec 2025 | Solar |
| Terry 1818-WD | Standard Solar | Wasco, CA | California Independent System Operator (CISO) | 10.3 GWh | Nov 2024 | Dec 2025 | Solar |
| Kern Sunset 1886-WD | Standard Solar | Bakersfield, CA | California Independent System Operator (CISO) | 4.5 GWh | Oct 2024 | Dec 2025 | Solar |
| Highway 43 1887-WD | Standard Solar | Shafter, CA | California Independent System Operator (CISO) | 3.3 GWh | Oct 2024 | Dec 2025 | Solar |
| Lake Elsinore Canopies - Lakeside HS | Standard Solar | Lake Elsinore, CA | California Independent System Operator (CISO) | 2.0 GWh | Feb 2022 | Dec 2025 | Solar |
| City of Rosamond (CA) | Standard Solar | Rosamond, CA | California Independent System Operator (CISO) | 2.8 GWh | Apr 2023 | Dec 2025 | Solar |
| Stenner Creek Solar | Stenner Creek Solar LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 9.6 GWh | Apr 2018 | Dec 2025 | Solar |
Browse Power Plants By California Counties
Figures are based on August 2026 generation numbers.| County | State Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Kern County, CA | # 1 | 333 | 35.3 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.7 TWh |
| Los Angeles County, CA | # 3 | 325 | 17.3 TWh |
| Riverside County, CA | # 4 | 165 | 14.0 TWh |
| Contra Costa County, CA | # 5 | 59 | 11.8 TWh |
| San Bernardino County, CA | # 6 | 212 | 11.8 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| Fresno County, CA | # 8 | 128 | 7.8 TWh |
| Shasta County, CA | # 9 | 46 | 7.0 TWh |
| Sacramento County, CA | # 10 | 68 | 5.6 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.0 TWh |
| Kings County, CA | # 13 | 59 | 4.0 TWh |
| Butte County, CA | # 14 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 15 | 76 | 3.4 TWh |
| Solano County, CA | # 16 | 41 | 3.0 TWh |
| Monterey County, CA | # 17 | 29 | 3.0 TWh |
| Tuolumne County, CA | # 18 | 23 | 2.9 TWh |
| Alameda County, CA | # 19 | 52 | 2.8 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.7 TWh |
| Orange County, CA | # 21 | 59 | 2.6 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Placer County, CA | # 24 | 26 | 1.8 TWh |
| Sutter County, CA | # 25 | 8 | 1.8 TWh |
| Tulare County, CA | # 26 | 72 | 1.6 TWh |
| San Joaquin County, CA | # 27 | 53 | 1.6 TWh |
| El Dorado County, CA | # 28 | 15 | 1.5 TWh |
| County | State Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Yuba County, CA | # 29 | 5 | 1.5 TWh |
| Madera County, CA | # 30 | 29 | 1.2 TWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Lake County, CA | # 32 | 10 | 892.8 GWh |
| Ventura County, CA | # 33 | 33 | 719.4 GWh |
| Amador County, CA | # 34 | 8 | 608.6 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Calaveras County, CA | # 36 | 6 | 524.3 GWh |
| Merced County, CA | # 37 | 33 | 493.1 GWh |
| Trinity County, CA | # 38 | 5 | 480.6 GWh |
| Humboldt County, CA | # 39 | 10 | 450.0 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Santa Barbara County, CA | # 41 | 18 | 292.9 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| San Benito County, CA | # 43 | 6 | 266.2 GWh |
| Nevada County, CA | # 44 | 12 | 225.7 GWh |
| Yolo County, CA | # 45 | 15 | 196.6 GWh |
| San Mateo County, CA | # 46 | 11 | 133.1 GWh |
| San Francisco County, CA | # 47 | 10 | 80.3 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.7 GWh |
| Napa County, CA | # 50 | 11 | 51.2 GWh |
| Tehama County, CA | # 51 | 7 | 45.8 GWh |
| Sierra County, CA | # 52 | 3 | 28.8 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Glenn County, CA | # 55 | 2 | 12.1 GWh |