RE Dillard 2 LLC

7786 Dillard Rd, Sloughhouse, CA 95693

Plant Summary Information

RE Dillard 2 LLC is ranked #385 out of 817 solar farms in California in terms of total annual net electricity generation.

RE Dillard 2 LLC generated 907.0 MWh during the 3-month period between September 2024 to December 2024.

Plant NameRE Dillard 2 LLC
Utility NameMN8 Energy LLC
LocationSacramento County, CA
Initial Operation DateJanuary 2012
Last Update Dec 2024
Annual Generation 6.1 GWh
Annual Consumption 21.6 k MMBtu
Ranked #7,497 out of 12,299 Power Plants Nationwide
Ranked #2,800 out of 6,182 Solar Power Plants Nationwide
Ranked #1,025 out of 1,566 California Power Plants
Ranked #385 out of 817 California Solar Power Plants
Fuel Types Solar
Previous Operators RE Dillard LLC (2013 to 2015)
X-Elio North America Inc (2016 to 2018)
Gamma Genco CV LLC (2019 to 2020)
Goldman Sachs Renewable Power LLC (2021 to 2021)
MN8 Energy LLC (2022 to 2024)

Map of RE Dillard 2 LLC

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for RE Dillard 2 LLC.

Create Your Account Today

Monthly Net Generation for RE Dillard 2 LLC

1k1k9009006006003003000020122012201320132014201420152015201620162017201720182018201920192020202020212021202220222023202320242024
Download SVG
Download PNG
Download CSV

RE Dillard 2 LLC Details

Summary Information
Plant NameRE Dillard 2 LLC (57779)
Plant Address7786 Dillard Rd, Sloughhouse, CA 95693
UtilityMN8 Energy LLC (61944)
Latitude, Longitude38.46611, -121.17778
Generation Dates on FileJan 2012 to Dec 2024
Initial Operation DateJanuary 2012
Annual Generation 6.1 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number11-436
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityBalancing Authority of Northern California (BANC)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerSacramento Municipal Util Dist (16534) CA
Grid Voltage 69.00 kV
Energy StorageNo

Generator DIL2 Details Operating January 2012

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity3 MW
Summer Capacity3 MW
Winter Capacity3 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 2012
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Solar Details
Single Axis TrackingYes
Azimuth Angle90
DC Net Capacity3.8 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity3.8 MW
Virtual Net Metering AgreementNo

RE Dillard 2 LLC Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#2790CatskillTriangle, NY6.1 GWh
#2791Arba Solar Energy StorageHamlet, NC6.0 GWh
#2792NY Lancaster Shisler Rd Site 2 Solar CSGLancaster, NY6.1 GWh
#2793Garnet Solar Generation Station I LLCPalm Springs, CA6.1 GWh
#2794GSPP Terrawatt Westfield LLC CSGWestfield, MA6.1 GWh
#2795Moncure Farm LLCMoncure, NC6.1 GWh
#2796Chambers Road SolarBig Flats, NY6.1 GWh
#2797Sealed Air Madera Solar ProjectMadera, CA6.1 GWh
#2798Whitakers Farm (Fisher Rd)Whitakers, NC6.1 GWh
#2799Founders Homestead Farms SolarPortsmouth, RI6.1 GWh
#2801Daum SolarRushville, NY6.1 GWh
#2802Market Street Gardiner Solar, LLCGardiner, ME6.1 GWh
#2803Tioga Solar South(CSG)Owego, NY6.1 GWh
#2804Tioga Solar North(CSG)Owego, NY6.1 GWh
#2805NY Lancaster Gunnville Rd Site 1 Solar CLancaster, NY6.1 GWh
#2806LoringLimestone, ME6.1 GWh
#2807SF Auto T1Tremonton, UT6.1 GWh
#2808One Ten Partners PVPalmdale, CA6.1 GWh
#2809Solar Lee, LLCMount Olive, NC6.1 GWh
#2810HazelLanesboro, MN6.1 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding RE Dillard 2 LLC.

Plant NamePlant LocationAnnual GenerationDistance
Aerojet IRancho Cordova, CA5.1 GWh10.2 mi
Aerojet IIRancho Cordova, CA3.8 GWh9.9 mi
Broadridge CogenEl Dorado Hills, CA15.8 GWh12.4 mi
CosumnesHerald, CA3.9 TWh9.3 mi
Depot Park Solar SystemSacramento, CA3.2 GWh12.4 mi
Dept of General Services -FTBSacramento, CA5.1 GWh11.2 mi
FAA NorCal TRACONMather AFB, CA1.6 GWh7.8 mi
FRV SI Transport Solar LPSacramento, CA1.4 GWh11.6 mi
Intel FolsomFolsom, CA1.4 GWh12.4 mi
Intel Folsom Phase 2Folsom, CA1.5 GWh12.3 mi
Intel Folsom Phase 3Folsom, CA9.1 GWh12.5 mi
Kiefer LandfillSloughhouse, CA51.0 GWh3.4 mi
NimbusFolsom, CA46.7 GWh12.1 mi
Rancho Cordova Medical OfficesRancho Cordova, CA2.0 GWh9.8 mi
Rancho Seco Solar II, LLCTwin Cities, CA307.2 GWh8.8 mi
Rancho Seco Solar, LLCHerald, CA19.2 GWh9.4 mi
RE Dillard 1 LLCSloughhouse, CA6.0 GWh0.3 mi
RE Dillard 3 LLCSloughhouse, CA6.1 GWh0.3 mi
Renew Solar ABC Sacramento LLCSacramento, CA2.7 GWh7.8 mi
SCA Cogen 2Sacramento, CA617.6 GWh12.8 mi