RE Mustang LLC
SW of Route 198 and 25th Ave, Lemoore, CA 93245Plant Summary Information
RE Mustang LLC is ranked #91 out of 886 solar farms in California in terms of total annual net electricity generation.
RE Mustang LLC generated 25.6 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | RE Mustang LLC |
|---|---|
| Utility Name | MN8 Energy LLC |
| Location | Kings County, CA |
| Initial Operation Date | August 2016 |
| Last Update | Dec 2025 |
| Annual Generation | 220.8 GWh |
| Annual Consumption | 829.7 k MMBtu |
| Ranked #2,417 out of 13,094 Power Plants Nationwide | |
| Ranked #407 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #242 out of 1,607 California Power Plants | |
| Ranked #91 out of 886 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
RE Mustang LLC (2013 to 2019) Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2025) |
Map of RE Mustang LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for RE Mustang LLC.
Monthly Net Generation for RE Mustang LLC
Monthly Plant Fuel Consumption for RE Mustang LLC
RE Mustang LLC Details
| Summary Information | |
|---|---|
| Plant Name | RE Mustang LLC (59150) |
| Plant Address | SW of Route 198 and 25th Ave, Lemoore, CA 93245 |
| Utility | MN8 Energy LLC (61944) |
| Latitude, Longitude | 36.22167, -119.90306 |
| Generation Dates on File | Mar 2016 to Dec 2025 |
| Initial Operation Date | August 2016 |
| Annual Generation | 220.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 21-155 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | Yes |
Generator PV1 Details Operating August 2016
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 100 MW |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2016 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 134.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator BESS1 Details Operating October 2021
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 75 MW |
| Summer Capacity | 75 MW |
| Winter Capacity | 75 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | October 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 75 |
|---|---|
| Maximum Charge Rate | 75 MW |
| Maximum Discharge Rate | 75 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 75 |
| Storage Enclosure Type | CS |
| Arbitrage | P |
| Frequency Regulation | Yes |
| Voltage Or Reactive Power Support | Yes |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 59150 |
| Direct Support Gen Id | PV1 |
| Support T D Asset | No |
RE Mustang LLC Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| RE Mustang LLC | 6600 N Military Trail, Suite 400, Boca Raton, FL 33496 | Generator BESS1 | 100.00% |
| RE Mustang LLC | 6600 N Military Trail, Suite 400, Boca Raton, FL 33496 | Generator PV1 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #397 | Maverick Solar 6, LLC | Desert Center, CA | 237.8 GWh |
| #398 | Chesapeake Solar Project | Chesapeake, VA | 241.5 GWh |
| #399 | West Line Solar, LLC | City of Eloy, AZ | 239.8 GWh |
| #400 | SR Snipesville II | Denton, GA | 239.2 GWh |
| #401 | Ragsdale Solar LLC | Canton, MS | 239.0 GWh |
| #402 | Fagus Solar Park | Childress, TX | 238.5 GWh |
| #403 | Panoche Valley Solar Farm | Paicines, CA | 235.3 GWh |
| #404 | Forgeview Solar | Blytheville, AR | 235.2 GWh |
| #405 | Emerald Grove | Crane, TX | 234.9 GWh |
| #406 | Desert Harvest, LLC | Desert Center, CA | 234.5 GWh |
| #408 | Millers Branch Solar | Haskell, TX | 233.6 GWh |
| #409 | Springbok 3 Solar Farm Hybrid | Cantil, CA | 233.3 GWh |
| #410 | East Line Solar | Coolidge, AZ | 232.9 GWh |
| #411 | Dodson Creek Solar, LLC | Hillsboro, OH | 232.7 GWh |
| #412 | OCI Alamo 7 LLC | Haskell, TX | 231.6 GWh |
| #413 | Oak Trail Solar, LLC | Moyock, NC | 231.4 GWh |
| #414 | Three Peaks Power | Cedar City, UT | 229.7 GWh |
| #415 | SR Clay, LLC | Fort Gaines, GA | 228.8 GWh |
| #416 | Ross County Solar, LLC | Greenfield, OH | 228.3 GWh |
| #417 | East Pecos Solar | McCamey, TX | 228.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding RE Mustang LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Almond | Lemoore, CA | 49.2 GWh | 0.8 mi |
| American Kings Solar, LLC | Lemoore, CA | 278.6 GWh | 1.3 mi |
| Aquamarine | Lemoore, CA | 648.1 GWh | 2.2 mi |
| Chestnut | Lemoore, CA | 363.2 GWh | 4.3 mi |
| Henrietta Peaker | Lemoore, CA | 4.3 GWh | 1.2 mi |
| Henrietta Solar Project | Lemoore, CA | 170.4 GWh | 5.4 mi |
| Huron Solar Station | Huron, CA | 28.1 GWh | 7.6 mi |
| Java Solar, LLC | Lemoore, CA | 22.5 GWh | 4.9 mi |
| Kings CSG 3 LLC Community Solar | Lemoore, CA | 6.8 GWh | 2.1 mi |
| Lemoore 1 | Lemoore, CA | 1.4 GWh | 6.4 mi |
| Lemoore West | Lemoore, CA | 16.7 GWh | 7.1 mi |
| Mustang Two | Lemoore, CA | 372.7 GWh | 0.5 mi |
| RE Kansas Solar, LLC | Lemoore, CA | 24.0 GWh | 4.3 mi |
| RE Kansas South LLC | Lemoore, CA | 50.5 GWh | 3.9 mi |
| RE Kent South, LLC | Lemoore, CA | 35.7 GWh | 0.3 mi |
| Slate Hybrid | Stratford, CA | 698.2 GWh | 0.6 mi |
| Solar Blue | Lemoore, CA | 646.5 GWh | 3.3 mi |
| Van der Kooi Dairy Solar Array | Riverdale, CA | 3.7 GWh | 8.2 mi |
| Westlands Solar PV Farm | Huron, CA | 39.1 GWh | 11.2 mi |
| Westside Solar Power PV1 | Lemoore, CA | 4.9 GWh | 0.3 mi |