Alticor Inc - Solar Project
5600 Beach Blvd, Buena Park, CA 90621Plant Summary Information
Alticor Inc - Solar Project is ranked #790 out of 885 solar farms in California in terms of total annual net electricity generation.
Alticor Inc - Solar Project generated 262.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Alticor Inc - Solar Project |
|---|---|
| Utility Name | MN8 Energy LLC |
| Location | Orange County, CA |
| Initial Operation Date | December 2017 |
| Last Update | Dec 2025 |
| Annual Generation | 1.4 GWh |
| Annual Consumption | 5.1 k MMBtu |
| Ranked #11,680 out of 13,081 Power Plants Nationwide | |
| Ranked #6,457 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #1,484 out of 1,606 California Power Plants | |
| Ranked #790 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
Solar Star California LXIV, LLC (2019 to 2019) Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2025) |
Map of Alticor Inc - Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Alticor Inc - Solar Project.
Monthly Net Generation for Alticor Inc - Solar Project
Monthly Plant Fuel Consumption for Alticor Inc - Solar Project
Alticor Inc - Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Alticor Inc - Solar Project (63303) |
| Plant Address | 5600 Beach Blvd, Buena Park, CA 90621 |
| Utility | MN8 Energy LLC (61944) |
| Latitude, Longitude | 33.87859, -117.99608 |
| Generation Dates on File | Jan 2019 to Dec 2025 |
| Initial Operation Date | December 2017 |
| Annual Generation | 1.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 18-470 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 0.48 kV |
| Energy Storage | No |
Generator AISP Details Operating December 2017
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 1.2 MW |
| Summer Capacity | 1.1 MW |
| Winter Capacity | 0.7 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2017 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 10 |
| DC Net Capacity | 1.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Alticor Inc - Solar Project Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| SunTrust Equipment Finance & Leasing Corp | 245 Peachtree Center Avenue, 17th Floor, Atlanta, GA 30303 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6447 | Lake Wilson Solar | Lake Wilson, MN | 1.5 GWh |
| #6448 | RPUWD Scheuer Well Solar Project | San Bernardino, CA | 1.5 GWh |
| #6449 | Becker Solar 3 CSG | St. Michael, MN | 1.5 GWh |
| #6450 | State Street Solar LLC | Palmer, MA | 1.5 GWh |
| #6451 | Manchester Community College North | Great Path, CT | 1.5 GWh |
| #6452 | City of Truth or Consequences PV | Truth or Consequences, NM | 1.4 GWh |
| #6453 | Building F | Santa Fe Springs, CA | 1.4 GWh |
| #6454 | Port of LA Solar FiT Project | San Pedro, CA | 1.4 GWh |
| #6455 | L'Oreal Franklin | Somerset, NJ | 1.4 GWh |
| #6456 | Antanavica Solar | Leicester, MA | 1.4 GWh |
| #6458 | USNY - Geddes | Town of Geddes, NY | 1.4 GWh |
| #6459 | Redbrook Community Solar 1 | Plympton, MA | 1.4 GWh |
| #6460 | Gridley Main | Gridley, CA | 1.4 GWh |
| #6461 | Roosevelt Trail | Windham, ME | 1.4 GWh |
| #6462 | Strata Roof 1 | Sacramento, CA | 1.4 GWh |
| #6463 | TPE MD GA137 | Oakland, MD | 1.4 GWh |
| #6464 | Waterford Solar, LLC CSG | Willamina, OR | 1.4 GWh |
| #6465 | Buidling L | Santa Fe Springs, CA | 1.4 GWh |
| #6466 | Ellettsville Solar RES | Ellettsville, IN | 1.4 GWh |
| #6467 | Rochester MA 2 | Rochester, MA | 1.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Alticor Inc - Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Anaheim Solar Energy Plant | Anaheim, CA | 1.7 GWh | 6.8 mi |
| AT&T Anaheim | Anaheim, CA | 7.5 GWh | 5.4 mi |
| Barre Peaker | Stanton, CA | 5.4 GWh | 5 mi |
| BCE Los Alamitos 1 | Los Alamitos, CA | 19.1 GWh | 7.3 mi |
| Biola University Hybrid | La Mirada, CA | 13.5 GWh | 2.2 mi |
| Buidling L | Santa Fe Springs, CA | 1.4 GWh | 3.5 mi |
| Building F | Santa Fe Springs, CA | 1.4 GWh | 4 mi |
| Building G | Santa Fe Springs, CA | 2.0 GWh | 3.9 mi |
| Center Hybrid | Norwalk, CA | 2.0 GWh | 7.2 mi |
| CSUF Nutwood Solar | Fullerton, CA | 2.9 GWh | 6.2 mi |
| CSUF State College | Fullerton, CA | 1.6 GWh | 6.2 mi |
| CSUF Trigeneration | Fullerton, CA | 35.5 GWh | 6.3 mi |
| Freeway Springs | Santa Fe Springs, CA | 2.8 GWh | 2.6 mi |
| Golden Springs Building C-1 | Santa Fe Springs, CA | 1.4 GWh | 4.1 mi |
| Golden Springs Building D | Santa Fe Springs, CA | 1.6 GWh | 4 mi |
| Kroger La Habra | La Habra, CA | 1.7 GWh | 4.4 mi |
| Santa Fe Springs Rooftop Solar BLDG H | Santa Fe Springs, CA | 2.4 GWh | 3.6 mi |
| Santa Fe Springs Rooftop Solar BLDG M | Santa Fe Springs, CA | 2.6 GWh | 3.6 mi |
| Stanton Energy Reliability Center Hybrid | Stanton, CA | 3.6 GWh | 5 mi |
| Staples La Mirada, CA | La Mirada, CA | 1.5 GWh | 1.2 mi |