RE Dillard 1 LLC
7786 Dillard Rd, Sloughhouse, CA 95693Plant Summary Information
RE Dillard 1 LLC is ranked #464 out of 885 solar farms in California in terms of total annual net electricity generation.
RE Dillard 1 LLC generated 657.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | RE Dillard 1 LLC |
|---|---|
| Utility Name | MN8 Energy LLC |
| Location | Sacramento County, CA |
| Initial Operation Date | January 2012 |
| Last Update | Dec 2025 |
| Annual Generation | 4.9 GWh |
| Annual Consumption | 17.3 k MMBtu |
| Ranked #8,279 out of 13,081 Power Plants Nationwide | |
| Ranked #3,544 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #1,078 out of 1,606 California Power Plants | |
| Ranked #464 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
RE Dillard LLC (2013 to 2015) X-Elio North America Inc (2016 to 2018) Gamma Genco CV LLC (2019 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2025) |
Map of RE Dillard 1 LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for RE Dillard 1 LLC.
Monthly Net Generation for RE Dillard 1 LLC
Monthly Plant Fuel Consumption for RE Dillard 1 LLC
RE Dillard 1 LLC Details
| Summary Information | |
|---|---|
| Plant Name | RE Dillard 1 LLC (57777) |
| Plant Address | 7786 Dillard Rd, Sloughhouse, CA 95693 |
| Utility | MN8 Energy LLC (61944) |
| Latitude, Longitude | 38.46861, -121.18194 |
| Generation Dates on File | Jan 2012 to Dec 2025 |
| Initial Operation Date | January 2012 |
| Annual Generation | 4.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 11-429 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Balancing Authority of Northern California (BANC) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Sacramento Municipal Util Dist (16534) CA |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
Generator DL1 Details Operating January 2012
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 3 MW |
| Summer Capacity | 3 MW |
| Winter Capacity | 3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2012 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| DC Net Capacity | 3.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 3.8 MW |
| Virtual Net Metering Agreement | No |
RE Dillard 1 LLC Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| RE Dillard LLC | 6600 N Military Trail, Suite 400, Boca Raton, FL 33496 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #3534 | Marmas Solar CSG | St. Cloud, MN | 4.9 GWh |
| #3535 | Vermillion River_MN_GRE DEA-GM | Farmington, MN | 4.9 GWh |
| #3536 | Hinton | Hinton, OK | 4.9 GWh |
| #3537 | IGS SBD1 | Bloomington, CA | 4.9 GWh |
| #3538 | Mill Creek Solar | Burlington, NJ | 4.9 GWh |
| #3539 | Berkley East Solar LLC | Berkley, MA | 4.9 GWh |
| #3540 | Barnstable Landfill | Marstons Mills, MA | 4.9 GWh |
| #3541 | Horn Rapids Solar, Storage and Training | Richland, WA | 4.6 GWh |
| #3542 | Bristol Solar One, LLC | Bristol, CT | 4.9 GWh |
| #3543 | Marble Solar LLC (CSG) | Albany, OR | 4.9 GWh |
| #3545 | 3Colton | Millbury, MA | 4.9 GWh |
| #3546 | Aulander Hwy 42 Solar, LLC | Aulander, NC | 4.9 GWh |
| #3547 | Hampden | Hampden, MA | 4.9 GWh |
| #3548 | Edgar Solar 1 | Paris, IL | 4.9 GWh |
| #3549 | Amazon - Patterson PV | Patterson, CA | 4.9 GWh |
| #3550 | Innovative Solar 6 | Leicester, NC | 4.9 GWh |
| #3551 | Ridgeway 2 | Rochester, NY | 4.9 GWh |
| #3552 | WED Coventry Seven, LLC | Coventry, RI | 4.9 GWh |
| #3553 | Roger Williams - Melville at Portsmouth | Portsmouth, RI | 4.9 GWh |
| #3554 | Cohalan | Central Islip, NY | 4.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding RE Dillard 1 LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Aerojet I | Rancho Cordova, CA | 6.0 GWh | 10.1 mi |
| Aerojet II | Rancho Cordova, CA | 3.7 GWh | 9.7 mi |
| Cosumnes Power Plant | Herald, CA | 3.1 TWh | 9.5 mi |
| Depot Park Solar System | Sacramento, CA | 2.7 GWh | 12.1 mi |
| Dept of General Services -FTB | Sacramento, CA | 4.8 GWh | 11 mi |
| FAA NorCal TRACON | Mather AFB, CA | 1.9 GWh | 7.5 mi |
| FRV SI Transport Solar LP | Sacramento, CA | 1.3 GWh | 11.4 mi |
| Intel Folsom | Folsom, CA | 1.3 GWh | 12.2 mi |
| Intel Folsom Phase 2 | Folsom, CA | 1.5 GWh | 12.1 mi |
| Intel Folsom Phase 3 | Folsom, CA | 9.1 GWh | 12.3 mi |
| Kiefer Landfill | Sloughhouse, CA | 34.6 GWh | 3.2 mi |
| Kiefer Landfill Generating Phase II | Sloughhouse, CA | 30.2 GWh | 3.2 mi |
| Nimbus | Folsom, CA | 50.6 GWh | 11.8 mi |
| Rancho Cordova Medical Offices | Rancho Cordova, CA | 2.0 GWh | 9.5 mi |
| Rancho Seco Solar II, LLC | Twin Cities, CA | 262.4 GWh | 9.1 mi |
| Rancho Seco Solar, LLC | Herald, CA | 18.0 GWh | 9.6 mi |
| RE Dillard 2 LLC | Sloughhouse, CA | 5.9 GWh | 0.3 mi |
| RE Dillard 3 LLC | Sloughhouse, CA | 5.9 GWh | 0.5 mi |
| Renew Solar ABC Sacramento LLC | Sacramento, CA | 2.7 GWh | 7.7 mi |
| SloughHouse Solar, LLC | SloughHouse, CA | 97.9 GWh | 0.2 mi |