| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Blackwell Solar Park | Consolidated Edison Development Inc. | Lost Hills, CA | California Independent System Operator (CISO) | 31.3 GWh | Dec 2018 | Dec 2024 | Solar |
| Oro Loma | Consolidated Edison Development Inc. | Oro Loma, CA | California Independent System Operator (CISO) | 25.5 GWh | Dec 2016 | Dec 2024 | Solar |
| Desert Hot Springs Solar | Consolidated Edison Solutions Inc. | Desert Hot Springs, CA | California Independent System Operator (CISO) | 4.8 GWh | Nov 2013 | Nov 2024 | Solar |
| Hyperion Treatment Plant CHP Plant | Constellation New Energy Inc. | Playa del Rey, CA | Los Angeles Department of Water and Power (LDWP) | 149.0 GWh | Mar 2017 | Sep 2025 | Other Biomass Gas : 67.8% Natural Gas : 32.2% |
| Brookfield Tehachapi 1 | Coram California Development, L.P. | Mojave, CA | California Independent System Operator (CISO) | 276.9 GWh | Feb 2012 | Dec 2024 | Wind |
| Coso Finance Partners | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 370.1 GWh | Jun 1987 | Sep 2025 | Geothermal |
| Coso Power Developers | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 299.2 GWh | Oct 1989 | Sep 2025 | Geothermal |
| Coso Energy Developers | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 244.2 GWh | Nov 1988 | Dec 2024 | Geothermal |
| Tracy 210 | Costco Wholesale | Tracy, CA | California Independent System Operator (CISO) | 21.2 GWh | Feb 2019 | Dec 2024 | Natural Gas |
| Mira Loma | Costco Wholesale | Mira Loma, CA | California Independent System Operator (CISO) | 1.9 GWh | Oct 2011 | Dec 2024 | Solar |
| Santa Rita Jail Hybrid | County of Alameda GSA | Dublin, CA | California Independent System Operator (CISO) | 13.1 GWh | Aug 2001 | Dec 2023 | Natural Gas : 80.9% Solar : 19.1% |
| Laredo Detention Facility - Solar 2, 3 | County of Kern | Bakersfield, CA | California Independent System Operator (CISO) | 5.1 GWh | Oct 2021 | Dec 2024 | Solar |
| Santa Barbara ReSource Center | County of Santa Barbara | Goleta, CA | California Independent System Operator (CISO) | 5.4 GWh | May 2022 | Dec 2024 | Other Biomass Gas |
| Guadalupe Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 1.9 GWh | Aug 2018 | Dec 2024 | Solar |
| Hellyer Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 3.6 GWh | Jul 2017 | Dec 2023 | Solar |
| Malech Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 4.8 GWh | Sep 2017 | Dec 2024 | Solar |
| Sonoma Central Landfill Phase I | County of Sonoma Dept of Trnsp | Petaluma, CA | California Independent System Operator (CISO) | 5.6 GWh | Jun 1993 | Dec 2024 | Landfill Gas |
| Sonoma Central Landfill Phase II | County of Sonoma Dept of Trnsp | Petaluma, CA | California Independent System Operator (CISO) | 5.0 GWh | May 1996 | Dec 2024 | Landfill Gas |
| Covanta Stanislaus Energy | Covanta Stanislaus Inc | Crows Landing, CA | California Independent System Operator (CISO) | 61.9 GWh | Aug 1988 | Dec 2024 | Non-biogenic Municipal Solid Waste : 50.0% Biogenic Municipal Solid Waste : 40.9% Distillate Fuel Oil : 9.1% |
| CP Kelco San Diego Plant | CP Kelco US Inc. | San Diego, CA | California Independent System Operator (CISO) | 71.3 GWh | Sep 1983 | Sep 2025 | Natural Gas |
| Creed Energy Center | Creed Energy Center LLC | Suisun, CA | California Independent System Operator (CISO) | 6.3 GWh | Dec 2002 | Dec 2024 | Natural Gas |
| Crockett Cogen Project | Crockett Cogeneration | Crockett, CA | California Independent System Operator (CISO) | 1.2 TWh | Nov 1995 | Sep 2025 | Natural Gas |
| Paulsell | Crow Creek Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 45.0 GWh | May 2024 | Sep 2025 | Solar |
| Crystal Farms Local Solar | Crystal Farms Local Solar, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 10.1 GWh | Oct 2023 | Dec 2024 | Solar |
| Imperial Solar Energy Center South | CSOLAR IV South LLC | Calexico, CA | California Independent System Operator (CISO) | 264.3 GWh | Oct 2013 | Dec 2024 | Solar |
| Imperial Solar Energy Center West | CSOLAR IV West LLC | Seeley, CA | California Independent System Operator (CISO) | 373.6 GWh | Mar 2016 | Dec 2024 | Solar |
| CSUCI Site Authority | CSUCI Site Authority | Camarillo, CA | California Independent System Operator (CISO) | 2.6 GWh | Feb 1988 | Sep 2024 | Natural Gas |
| Tejon Castac Water District Solar | CTMW Solar, LLC | Arvin, CA | California Independent System Operator (CISO) | 2.5 GWh | Apr 2024 | Dec 2024 | Solar |
| Cuyama Solar, LLC | Cuyama Solar, LLC | Cuyama, CA | California Independent System Operator (CISO) | 57.5 GWh | Oct 2017 | Sep 2025 | Solar |
| La Joya Del Sol | CVI CleanCapital Solar 1 LLC | Fresno, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2012 | Dec 2024 | Solar |
| SEPV 1 | CVI CleanCapital Solar 1 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.7 GWh | Apr 2012 | Dec 2024 | Solar |
| SEPV 2 | CVI CleanCapital Solar 1 LLC | Twentynine Palms, CA | California Independent System Operator (CISO) | 2.8 GWh | May 2012 | Dec 2024 | Solar |
| Meridian Vineyards | CVI CleanCapital Solar 1 LLC | Paso Robles, CA | California Independent System Operator (CISO) | 1.0 GWh | Nov 2010 | Dec 2024 | Solar |
| La Paloma Generating Plant | CXA La Paloma LLC | McKittrick, CA | California Independent System Operator (CISO) | 1.8 TWh | Dec 2002 | Sep 2025 | Natural Gas |
| Daggett 2 | Daggett Solar Power 2 LLC | Daggett, CA | California Independent System Operator (CISO) | 527.1 GWh | Nov 2023 | Sep 2025 | Solar |
| Daggett 3 | Daggett Solar Power 3 LLC | Daggett, CA | California Independent System Operator (CISO) | 877.7 GWh | Jun 2023 | Sep 2025 | Solar |
| Delta Electronics Fremont | Delta Electronics (Americas) Ltd | Fremont, CA | California Independent System Operator (CISO) | 616.0 MWh | Mar 2016 | Dec 2024 | Solar |
| Delta Energy Center | Delta Energy Center LLC | Pittsburg, CA | California Independent System Operator (CISO) | 3.3 TWh | Apr 2002 | Sep 2025 | Natural Gas |
| Naval Hospital Medical Center | Department of the Navy | San Diego, CA | California Independent System Operator (CISO) | 16.2 GWh | Nov 2003 | Sep 2025 | Natural Gas |
| Depot Park Solar System | Depot Park Solar Farm | Sacramento, CA | Balancing Authority of Northern California (BANC) | 3.2 GWh | Nov 2010 | Dec 2024 | Solar |
| Desert Harvest II LLC | Desert Harvest II LLC | Desert Center, CA | California Independent System Operator (CISO) | 181.4 GWh | Nov 2020 | Sep 2025 | Solar |
| Desert Harvest, LLC | Desert Harvest, LLC | Desert Center, CA | California Independent System Operator (CISO) | 231.7 GWh | Nov 2020 | Sep 2025 | Solar |
| Desert Quartzite | Desert Quartzite LLC | Blythe, CA | California Independent System Operator (CISO) | 755.5 GWh | Nov 2024 | Sep 2025 | Solar |
| Desert View Power | Desert View Power Inc | Mecca, CA | Imperial Irrigation District (IID) | 166.6 GWh | Oct 1991 | Apr 2024 | Wood/Wood Waste Solids : 99.0% Natural Gas : 1.0% |
| Whitewater Hydro Plant | Desert Water Agency | California, CA | California Independent System Operator (CISO) | 5.0 GWh | Mar 1986 | Nov 2024 | Water |
| Solar Star Palo Alto I, LLC | DG 1 Acquisition Co., LLC | Palo Alto, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2019 | Dec 2024 | Solar |
| CID Solar (CA) | DG California Solar LLC | Corcoran, CA | California Independent System Operator (CISO) | 3.9 GWh | Aug 2019 | Dec 2024 | Solar |
| Mariposa Energy Project | Diamond Generating Corporation | Byron, CA | California Independent System Operator (CISO) | 45.4 GWh | Sep 2012 | Sep 2025 | Natural Gas |
| Indigo Energy Facility | Diamond Generating Corporation | North Palm Springs, CA | California Independent System Operator (CISO) | 24.6 GWh | Jun 2001 | Dec 2024 | Natural Gas |
| Larkspur Energy Facility | Diamond Generating Corporation | San Diego, CA | California Independent System Operator (CISO) | 24.4 GWh | Jun 2001 | Dec 2024 | Natural Gas |
| Visalia CSG LLC | Dimension Energy LLC | Tulare, CA | California Independent System Operator (CISO) | 6.4 GWh | Feb 2024 | Dec 2024 | Solar |
| Tulare CSG LLC | Dimension Energy LLC | Tulare, CA | California Independent System Operator (CISO) | 375.0 MWh | Sep 2024 | Dec 2024 | Solar |
| BBARWA | Distributed Solar Development, LLC | Big Bear, CA | California Independent System Operator (CISO) | 3.0 GWh | Nov 2021 | Dec 2024 | Solar |
| Lost Hills Oilfield | Distributed Solar Development, LLC | Lost Hills, CA | California Independent System Operator (CISO) | 4.5 GWh | Jun 2021 | Dec 2024 | Solar |
| Agriculture Capital - Legacy Packing | Distributed Solar Development, LLC | Dinuba, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2022 | Dec 2024 | Solar |
| Bishop Ranch - BR 1-Y | Distributed Solar Development, LLC | San Ramon, CA | California Independent System Operator (CISO) | 1.7 GWh | Feb 2022 | Dec 2024 | Solar |
| MCAGCC Cogen Plant | DOD USMC Marine Air Ground Combat | Twentynine Palms, CA | California Independent System Operator (CISO) | 69.2 GWh | Jan 2003 | Dec 2024 | Natural Gas |
| Midway Solar Farm II | Dominion Renewable Energy | Calipatria, CA | Imperial Irrigation District (IID) | 34.2 GWh | Apr 2017 | Sep 2025 | Solar |
| Donaghy-Stockton | Donaghy Sales Inc. | Stockton, CA | California Independent System Operator (CISO) | 2.2 GWh | Sep 2021 | Dec 2024 | Solar |
| Drew Solar LLC | Drew Solar LLC | Calexico, CA | California Independent System Operator (CISO) | 309.4 GWh | Oct 2022 | Sep 2025 | Solar |
| Woodland Biomass Power Ltd | DTE Energy Services-Woodland | Woodland, CA | California Independent System Operator (CISO) | 170.9 GWh | Aug 1989 | Dec 2024 | Wood/Wood Waste Solids : 99.5% Natural Gas : 0.5% |
| Childrens Hospital | DTE San Diego COGEN Inc. | San Diego, CA | California Independent System Operator (CISO) | 25.3 GWh | Mar 2000 | Sep 2025 | Natural Gas |
| Stockton Biomass | DTE Stockton LLC | Stockton, CA | California Independent System Operator (CISO) | 343.1 GWh | Nov 1987 | Dec 2024 | Wood/Wood Waste Solids : 99.5% |
| Sunset Reservoir North Basin | Duke Energy Renewables Services | San Francisco, CA | California Independent System Operator (CISO) | 6.5 GWh | Aug 2010 | Dec 2024 | Solar |
| Rio Bravo Solar II LLC | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 50.8 GWh | Nov 2016 | Dec 2024 | Solar |
| Wildwood Solar II | Duke Energy Renewables Services | Wasco, CA | California Independent System Operator (CISO) | 38.5 GWh | Dec 2016 | Dec 2024 | Solar |
| Rio Bravo Solar 1 LLC | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 52.3 GWh | Nov 2016 | Dec 2024 | Solar |
| SEPV 8 | Duke Energy Renewables Services | Twentynine Palms, CA | California Independent System Operator (CISO) | 32.7 GWh | May 2013 | Dec 2024 | Solar |
| Pumpjack Solar I | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 46.2 GWh | Dec 2014 | Dec 2024 | Solar |
| SEPV9 Power Plant | Duke Energy Renewables Services | Twentynine Palms, CA | California Independent System Operator (CISO) | 24.3 GWh | May 2013 | Dec 2024 | Solar |
| Wildwood Solar I, LLC | Duke Energy Renewables Services | Wasco, CA | California Independent System Operator (CISO) | 41.9 GWh | Jan 2015 | Dec 2024 | Solar |
| Seville 1 | Duke Energy Renewables Services | Ocotillo Wells, CA | Imperial Irrigation District (IID) | 54.1 GWh | Nov 2015 | Dec 2024 | Solar |
| Longboat Solar, LLC | Duke Energy Renewables Services | Barstow, CA | California Independent System Operator (CISO) | 42.0 GWh | Nov 2016 | Dec 2024 | Solar |
| Seville 2 | Duke Energy Renewables Services | Ocotillo Wells, CA | Imperial Irrigation District (IID) | 77.5 GWh | Nov 2015 | Dec 2024 | Solar |
| Dynegy Moss Landing Power Plant Hybrid | Dynegy -Moss Landing LLC | Moss Landing, CA | California Independent System Operator (CISO) | 2.7 TWh | Nov 1967 | Sep 2025 | Natural Gas |
| Dynegy Oakland Power Plant | Dynegy Oakland, LLC | Oakland, CA | California Independent System Operator (CISO) | 2.7 GWh | Oct 1978 | Sep 2025 | Jet Fuel |
| Agua Mansa Power Plant | E I Colton LLC | Colton, CA | California Independent System Operator (CISO) | 8.8 GWh | May 2003 | Dec 2024 | Natural Gas |
| Terminus Hydroelectric Project | Eagle Creek Renewable Energy, LLC | Lemon Cove, CA | California Independent System Operator (CISO) | 42.2 GWh | Feb 1990 | Jun 2024 | Water |
| Pardee | East Bay Municipal Util Dist | Valley Springs, CA | California Independent System Operator (CISO) | 117.8 GWh | Jun 1930 | Dec 2024 | Water |
| WWTP Power Generation Station | East Bay Municipal Util Dist | Oakland, CA | California Independent System Operator (CISO) | 28.4 GWh | Jul 1985 | Sep 2025 | Other Biomass Gas : 98.8% Distillate Fuel Oil : 1.2% |
| Camanche | East Bay Municipal Util Dist | Clements & Wallace, CA | California Independent System Operator (CISO) | 31.7 GWh | Jun 1983 | Dec 2024 | Water |
| Power Generation Station (PGS) 2 | East Bay Municipal Util Dist | Oakland, CA | California Independent System Operator (CISO) | 16.5 GWh | Nov 2011 | Dec 2024 | Other Biomass Gas |
| Martinez Sulfuric Acid Regeneration Plt | Eco Services Corp. | Martinez, CA | California Independent System Operator (CISO) | 17.3 GWh | Dec 1977 | Dec 2024 | Waste Heat |
| Dominguez Plant | Eco Services Corp. | Long Beach, CA | California Independent System Operator (CISO) | 13.7 GWh | Jul 1976 | Dec 2023 | Waste Heat |
| CSP Los Angeles | Ecoplexus, Inc | Lancaster, CA | California Independent System Operator (CISO) | 5.6 GWh | Sep 2022 | Dec 2024 | Solar |
| Department of Justice | Ecoplexus, Inc | Sacramento, CA | Balancing Authority of Northern California (BANC) | 3.9 GWh | Mar 2020 | Dec 2024 | Solar |
| CA Institute for Women | Ecoplexus, Inc | Chino, CA | California Independent System Operator (CISO) | 2.2 GWh | Jan 2020 | Dec 2024 | Solar |
| Centinela State Prison | Ecoplexus, Inc | Sacramento, CA | Imperial Irrigation District (IID) | 16.7 GWh | Nov 2019 | Dec 2024 | Solar |
| Atascadero State Hospital | Ecoplexus, Inc | Atascadero, CA | California Independent System Operator (CISO) | 2.8 GWh | Jul 2020 | Dec 2024 | Solar |
| Folsom SP and CSP Sacramento | Ecoplexus, Inc | Represa, CA | Balancing Authority of Northern California (BANC) | 2.3 GWh | Apr 2019 | Dec 2024 | Solar |
| Calipatria State Prison | Ecoplexus, Inc | Calipatria, CA | Imperial Irrigation District (IID) | 16.5 GWh | Nov 2019 | Dec 2024 | Solar |
| Kern Valley SP | Ecoplexus, Inc | Delano, CA | California Independent System Operator (CISO) | 7.9 GWh | Aug 2023 | Dec 2024 | Solar |
| Camp San Luis Obispo | Ecoplexus, Inc | San Luis Obispo, CA | California Independent System Operator (CISO) | 158.0 MWh | Jul 2024 | Nov 2024 | Solar |
| Hollister Solar LLC | Ecos Energy LLC | Hollister, CA | California Independent System Operator (CISO) | 3.7 GWh | Nov 2014 | Dec 2024 | Solar |
| Diamond Valley Solar Project | Ecos Energy LLC | Winchester, CA | California Independent System Operator (CISO) | 2.2 GWh | Dec 2014 | Dec 2024 | Solar |
| Merced Solar LLC | Ecos Energy LLC | Merced, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2014 | Dec 2024 | Solar |
| Munro Valley Solar | Ecos Energy LLC | Olancha, CA | California Independent System Operator (CISO) | 10.7 GWh | Sep 2016 | Dec 2024 | Solar |
| Mission Solar LLC | Ecos Energy LLC | Merced, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2014 | Dec 2024 | Solar |
| Kettleman Solar Project | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 2.6 GWh | Mar 2014 | Dec 2024 | Solar |
| Vintner Solar | Ecos Energy LLC | Templeton, CA | California Independent System Operator (CISO) | 4.2 GWh | Mar 2014 | Dec 2024 | Solar |
Browse Power Plants By California Counties
Figures are based on September 2025 generation numbers.| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Kern County, CA | # 1 | 313 | 34.9 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.7 TWh |
| Los Angeles County, CA | # 3 | 308 | 18.9 TWh |
| Riverside County, CA | # 4 | 159 | 14.7 TWh |
| Contra Costa County, CA | # 5 | 56 | 13.2 TWh |
| San Bernardino County, CA | # 6 | 204 | 12.8 TWh |
| Imperial County, CA | # 7 | 84 | 9.7 TWh |
| Shasta County, CA | # 8 | 46 | 7.7 TWh |
| Fresno County, CA | # 9 | 119 | 7.6 TWh |
| Sacramento County, CA | # 10 | 65 | 6.4 TWh |
| Sonoma County, CA | # 11 | 26 | 5.2 TWh |
| San Diego County, CA | # 12 | 151 | 5.1 TWh |
| Kings County, CA | # 13 | 57 | 4.3 TWh |
| Santa Clara County, CA | # 14 | 75 | 4.1 TWh |
| Butte County, CA | # 15 | 25 | 3.4 TWh |
| Solano County, CA | # 16 | 40 | 3.2 TWh |
| Monterey County, CA | # 17 | 29 | 3.2 TWh |
| Colusa County, CA | # 18 | 3 | 2.9 TWh |
| Orange County, CA | # 19 | 59 | 2.9 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.8 TWh |
| Tuolumne County, CA | # 21 | 23 | 2.7 TWh |
| Alameda County, CA | # 22 | 47 | 2.5 TWh |
| San Joaquin County, CA | # 23 | 47 | 2.2 TWh |
| Placer County, CA | # 24 | 24 | 2.0 TWh |
| Plumas County, CA | # 25 | 13 | 1.9 TWh |
| Sutter County, CA | # 26 | 8 | 1.8 TWh |
| Yuba County, CA | # 27 | 5 | 1.6 TWh |
| Tulare County, CA | # 28 | 69 | 1.5 TWh |
| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| El Dorado County, CA | # 29 | 15 | 1.4 TWh |
| Inyo County, CA | # 30 | 23 | 1.1 TWh |
| Madera County, CA | # 31 | 28 | 950.7 GWh |
| Lake County, CA | # 32 | 10 | 905.4 GWh |
| Mono County, CA | # 33 | 9 | 785.9 GWh |
| Ventura County, CA | # 34 | 32 | 756.5 GWh |
| Amador County, CA | # 35 | 8 | 649.7 GWh |
| Trinity County, CA | # 36 | 5 | 569.3 GWh |
| Merced County, CA | # 37 | 31 | 522.8 GWh |
| Calaveras County, CA | # 38 | 6 | 513.9 GWh |
| Humboldt County, CA | # 39 | 10 | 467.8 GWh |
| Lassen County, CA | # 40 | 9 | 341.0 GWh |
| Santa Barbara County, CA | # 41 | 18 | 331.1 GWh |
| San Benito County, CA | # 42 | 6 | 302.7 GWh |
| Mariposa County, CA | # 43 | 2 | 299.7 GWh |
| Siskiyou County, CA | # 44 | 8 | 236.7 GWh |
| Nevada County, CA | # 45 | 12 | 219.1 GWh |
| Yolo County, CA | # 46 | 15 | 216.2 GWh |
| San Mateo County, CA | # 47 | 11 | 133.1 GWh |
| San Francisco County, CA | # 48 | 10 | 84.0 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.5 GWh |
| Tehama County, CA | # 50 | 7 | 59.7 GWh |
| Napa County, CA | # 51 | 9 | 51.0 GWh |
| Sierra County, CA | # 52 | 3 | 33.2 GWh |
| Marin County, CA | # 53 | 3 | 19.0 GWh |
| Glenn County, CA | # 54 | 2 | 18.7 GWh |
| Mendocino County, CA | # 55 | 5 | 12.3 GWh |