13949 Cameron Road, Tehachapi, CA 93561Plant Summary Information
Windstar 1 is ranked #21 out of 108 wind farms in California in terms of total annual net electricity generation.
Windstar 1 generated 38.5 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Windstar 1 |
|---|---|
| Utility Name | Nextera Energy Resources |
| Location | Kern County, CA |
| Initial Operation Date | February 2012 |
| Last Update | Dec 2025 |
| Annual Generation | 255.0 GWh |
| Annual Consumption | 959.4 k MMBtu |
| Ranked #2,234 out of 13,081 Power Plants Nationwide | |
| Ranked #676 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #213 out of 1,606 California Power Plants | |
| Ranked #21 out of 108 California Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operators |
Windstar Energy LLC (2013 to 2013) Brookfield Energy Marketing LP (2014 to 2018) Brookfield Renewable Trading and Marketing LP (2019 to 2021) Nextera Energy Resources (2022 to 2025) |
Map of Windstar 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Windstar 1.
Monthly Net Generation for Windstar 1
Monthly Plant Fuel Consumption for Windstar 1
Windstar 1 Details
| Summary Information | |
|---|---|
| Plant Name | Windstar 1 (57774) |
| Plant Address | 13949 Cameron Road, Tehachapi, CA 93561 |
| Utility | Nextera Energy Resources (64260) |
| Latitude, Longitude | 35.05417, -118.35472 |
| Generation Dates on File | Feb 2012 to Dec 2025 |
| Initial Operation Date | February 2012 |
| Annual Generation | 255.0 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator WGNS Details Operating February 2012
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 120 MW |
| Summer Capacity | 120 MW |
| Winter Capacity | 120 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 2012 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 60 |
| Turbine Details | |
| Number Of Turbines | 60 |
|---|---|
| Predominant Turbine Manufacturer | Gamesa |
| Predominant Turbine Model Number | G80-2.0 |
| Design Wind Speed | 27 MPH |
| Wind Quality Class | 1 - High Wind |
| Turbine Hub Height Feet | 220 |
Windstar 1 Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Windstar Energy LLC | 75 State Street Suite 2701, Boston, MA 2109 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #666 | Bull Creek Wind | O'Donnell, TX | 259.6 GWh |
| #667 | Cassadaga Wind Farm | Cherry Creek, NY | 259.3 GWh |
| #668 | Criterion | Oakland, MD | 258.7 GWh |
| #669 | Meadow Lake Wind Farm III LLC | Lafayette, IN | 257.8 GWh |
| #670 | Red Barn Energy | Montfort, WI | 256.7 GWh |
| #671 | Laurel Mountain Hybrid | Belington, WV | 256.2 GWh |
| #672 | Mendota Hills, LLC | Paw Paw, IL | 255.9 GWh |
| #673 | Green Pastures Wind I | Seymour, TX | 255.6 GWh |
| #674 | Wethersfield | Gainsville, NY | 255.6 GWh |
| #675 | Beech Ridge Energy LLC | Rupert, WV | 255.5 GWh |
| #677 | Alta Wind Energy Center V | Mojave, CA | 253.7 GWh |
| #678 | Golden Hills Wind | Livermore, CA | 253.3 GWh |
| #679 | Vantage Wind Energy LLC | Ellensburg, WA | 253.2 GWh |
| #680 | Eight Point Wind | Rexville, NY | 253.1 GWh |
| #681 | Farmers City Wind LLC | Tarkio, MO | 253.0 GWh |
| #682 | Pioneer Wind Park, LLC | Glenrock, WY | 252.6 GWh |
| #683 | Scurry County Wind LP | Snyder, TX | 252.2 GWh |
| #684 | Lake Winds Energy Park | Ludington, MI | 251.4 GWh |
| #685 | EcoGrove Wind LLC | Lena, IL | 251.1 GWh |
| #686 | Pontotoc Wind | Roff, OK | 250.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Windstar 1.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 85 A | Tehachapi, CA | 70.6 GWh | 3.3 mi |
| 85 B | Tehachapi, CA | 93.2 GWh | 3.6 mi |
| Alta Wind Energy Center I | Mojave, CA | 399.8 GWh | 1.4 mi |
| Alta Wind Energy Center II | Mojave, CA | 318.3 GWh | 4 mi |
| Alta Wind Energy Center III | Mojave, CA | 318.3 GWh | 4 mi |
| Alta Wind XI | Mojave, CA | 250.6 GWh | 2.1 mi |
| Cameron Ridge LLC | Mojave, CA | 148.0 GWh | 2.6 mi |
| Coram Energy LLC | Tehachapi, CA | 8.8 GWh | 1.6 mi |
| Coram Energy LLC (4.5MW) | Tehachapi, CA | 9.0 GWh | 2.6 mi |
| Coram Energy LLC (ECT) | Tehachapi, CA | 21.6 GWh | 0.8 mi |
| Helzel & Schwarzhoff 86 | Tehachapi, CA | 3.3 GWh | 3.5 mi |
| Mustang Hills LLC | Mojave, CA | 267.1 GWh | 3.8 mi |
| Oasis Alta | Mojave, CA | 49.3 GWh | 3.6 mi |
| Oasis Wind | Mojave, CA | 221.1 GWh | 3.6 mi |
| Point Wind | Tehachapi, CA | 216.2 GWh | 1.9 mi |
| Ridgetop | Mojave, CA | 117.6 GWh | 2.6 mi |
| Ridgetop Energy LLC | Mojave, CA | 24.5 GWh | 2.4 mi |
| Tehachapi Wind Resource I | Tehachapi, CA | 12.3 GWh | 2 mi |
| Victory Garden (Tehachapi) | Tehachapi, CA | 33.0 GWh | 1.9 mi |
| ZCO | Tehachapi, CA | 1.4 GWh | 2.2 mi |