Lafayette 2 - MLK Jr. Hospital (MLK)
1680 E 120th St, Los Angeles, CA 90059Plant Summary Information
Lafayette 2 - MLK Jr. Hospital (MLK) is ranked #654 out of 849 solar farms in California in terms of total annual net electricity generation.
Lafayette 2 - MLK Jr. Hospital (MLK) generated 415.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Lafayette 2 - MLK Jr. Hospital (MLK) |
|---|---|
| Utility Name | MN8 Energy LLC |
| Location | Los Angeles County, CA |
| Initial Operation Date | August 2020 |
| Last Update | Dec 2024 |
| Annual Generation | 2.3 GWh |
| Annual Consumption | 8.2 k MMBtu |
| Ranked #10,121 out of 12,539 Power Plants Nationwide | |
| Ranked #4,939 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #1,370 out of 1,600 California Power Plants | |
| Ranked #654 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
GSRP (2019 to 2019) Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2024) |
Map of Lafayette 2 - MLK Jr. Hospital (MLK)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lafayette 2 - MLK Jr. Hospital (MLK).
Monthly Net Generation for Lafayette 2 - MLK Jr. Hospital (MLK)
Lafayette 2 - MLK Jr. Hospital (MLK) Details
| Summary Information | |
|---|---|
| Plant Name | Lafayette 2 - MLK Jr. Hospital (MLK) (63623) |
| Plant Address | 1680 E 120th St, Los Angeles, CA 90059 |
| Utility | MN8 Energy LLC (61944) |
| Latitude, Longitude | 33.92, -118.24 |
| Generation Dates on File | Aug 2020 to Dec 2024 |
| Initial Operation Date | August 2020 |
| Annual Generation | 2.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 20-816 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 4.16 kV |
| Energy Storage | No |
Generator GEN1 Details Operating August 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 1.7 MW |
| Summer Capacity | 1.7 MW |
| Winter Capacity | 1.7 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 10 |
| DC Net Capacity | 1.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Lafayette 2 - MLK Jr. Hospital (MLK) Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Solar Star LA County I, LLC | 750 Park of Commerce Blvd, Boca Raton, FL 33487 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #4929 | Nickel 1 Solar Facility | Lost Hills, CA | 2.3 GWh |
| #4930 | ASD Cotuit MA Solar LLC | Sandwich, MA | 2.2 GWh |
| #4931 | Merrimac Solar | Merrimac, MA | 2.3 GWh |
| #4932 | Legoland Solar | Winter Haven, FL | 2.3 GWh |
| #4933 | Xebec 1 | Sun Valley, CA | 2.3 GWh |
| #4934 | Jericho Gravel Solar Farm | Jerico, VT | 2.3 GWh |
| #4935 | Arkansas Valley | Ozark, AR | 2.3 GWh |
| #4936 | IKEA College Park 411 | College Park, MD | 2.3 GWh |
| #4937 | O'Fallon Renewable Energy Center | O'Fallon, MO | 2.3 GWh |
| #4938 | Griffin Road Solar 2 | Charlton, MA | 2.3 GWh |
| #4940 | Nexamp Peak CSG | Hancock, MA | 2.3 GWh |
| #4941 | CDCR (CA) - Solano State Prison | Vacaville, CA | 2.3 GWh |
| #4942 | Lane Ave Solar LLC | North Brookfield, MA | 2.3 GWh |
| #4943 | Chambers 4 - Sacramento SMF1 | Sacramento, CA | 2.3 GWh |
| #4944 | Dodge Renewables 1 | Dodge Center, MN | 2.3 GWh |
| #4945 | Mashpee Landfill Solar | Mashpee, MA | 2.3 GWh |
| #4946 | Fremont - Kato Rd | Fremont, CA | 2.3 GWh |
| #4947 | Dover CSG | Dover Plains, NY | 2.3 GWh |
| #4948 | Kearsarge Wilmington | Wilmington, MA | 2.3 GWh |
| #4949 | University Park Solar | State College, PA | 2.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lafayette 2 - MLK Jr. Hospital (MLK).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 20333 Normandie PV, LLC | Torrance, CA | 5.3 GWh | 6.2 mi |
| AT&T - Gardena | Gardena, CA | 7.8 GWh | 4.2 mi |
| AT&T - Hawthorne | Hawthorne, CA | 6.5 GWh | 4.6 mi |
| Big Bear | Los Angeles, CA | 7.0 GWh | 7.1 mi |
| Carson Cogeneration | Carson, CA | 29.1 GWh | 3.1 mi |
| Center Hybrid | Norwalk, CA | 7.2 GWh | 7.8 mi |
| Colon PV | Wilmington, CA | 1.2 GWh | 8.8 mi |
| Dominguez Plant | Long Beach, CA | 13.7 GWh | 5.3 mi |
| Equinix Douglas St. Fuel Cell | El Segundo, CA | 8.0 GWh | 8.3 mi |
| Francisco St. Solar | Torrance, CA | 1.2 GWh | 6.2 mi |
| H. Gonzales | Vernon, CA | 178.4 MWh | 5.5 mi |
| Honda Torrance | Torrance, CA | 762.0 MWh | 7.1 mi |
| ISH Solar Hospital Downey | Downey, CA | 1.4 GWh | 6.6 mi |
| Kaiser Downey | Downey, CA | 8.7 GWh | 6.4 mi |
| Malburg | Vernon, CA | 326.4 GWh | 5.5 mi |
| Signal Hill West Unit | Signal Hill, CA | 39.7 GWh | 8.4 mi |
| Torrance Refining Company, LLC | Torrance, CA | 83.1 GWh | 6.9 mi |
| USPS PV | Los Angeles, CA | 10.1 GWh | 4.1 mi |
| Verizon-Torrance | Torrance, CA | 5.8 GWh | 6 mi |
| Watson Cogeneration | Carson, CA | 2.3 TWh | 7.1 mi |