Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Monticello Dam | Solano Irrigation District | Winters, CA | California Independent System Operator (CISO) | 36.4 GWh | May 1983 | Dec 2024 | Water |
Moonlight Packing - Phase 2 | CalCom Energy | Reedley, CA | California Independent System Operator (CISO) | 2.6 GWh | May 2019 | Dec 2024 | Solar |
Morelos del Sol | Southern Power Co | Lost Hills, CA | California Independent System Operator (CISO) | 29.9 GWh | Oct 2015 | Dec 2024 | Solar |
Morgan Lancaster 1 | Terraform Arcadia | Lancaster, CA | California Independent System Operator (CISO) | 796.0 MWh | Aug 2015 | Dec 2024 | Solar |
Mount Signal Solar Farm II | MN8 Energy LLC | Calexico, CA | California Independent System Operator (CISO) | 410.4 GWh | Dec 2019 | Apr 2025 | Solar |
Mount Signal Solar Farm V | Imperial Valley Solar 3, LLC | Calexico, CA | California Independent System Operator (CISO) | 663.5 GWh | Oct 2018 | Apr 2025 | Solar |
Mountain View I & II | AES Distributed Energy | North Palm Springs, CA | California Independent System Operator (CISO) | 288.1 GWh | May 2001 | Apr 2025 | Wind |
Mountain View III | Avangrid Power LLC | North Palm Springs, CA | California Independent System Operator (CISO) | 75.7 GWh | Nov 2003 | Dec 2024 | Wind |
Mountain View Ind Park 1-sline001 | Prologis Logistics Services Incorporated | Fontana, CA | California Independent System Operator (CISO) | 1.3 GWh | Aug 2023 | Dec 2024 | Solar |
Mountain View IV | AES Distributed Energy | North Palm Springs, CA | California Independent System Operator (CISO) | 186.8 GWh | Jan 2012 | Dec 2024 | Wind |
Mountainview Generating Station | Southern California Edison Co | Redlands, CA | California Independent System Operator (CISO) | 2.2 TWh | Nov 2005 | Mar 2025 | Natural Gas |
Mt Poso Cogeneration | Mt Poso Cogeneration Co | Bakersfield, CA | California Independent System Operator (CISO) | 179.7 GWh | Apr 1989 | Nov 2024 | Wood/Wood Waste Solids : 99.3% Natural Gas : 0.7% |
Muck Valley Hydroelectric | Brookfield Renewable Trading and Marketing LP | NA, CA | California Independent System Operator (CISO) | 81.8 GWh | Nov 1988 | Dec 2024 | Water |
Municipal Cogen Plant | Palm Springs City of | Palm Springs, CA | California Independent System Operator (CISO) | 7.3 GWh | Apr 1985 | Apr 2025 | Natural Gas |
Munro Valley Solar | Ecos Energy LLC | Olancha, CA | California Independent System Operator (CISO) | 10.7 GWh | Sep 2016 | Dec 2024 | Solar |
Murphys | Utica Water & Power Authority | Murphys, CA | California Independent System Operator (CISO) | 15.5 GWh | Feb 1954 | Dec 2024 | Water |
Mustang Hills LLC | Mustang Hills, LLC (Longroad) | Mojave, CA | California Independent System Operator (CISO) | 301.5 GWh | Apr 2012 | Dec 2024 | Wind |
Mustang Two | RE Mustang Two LLC | Lemoore, CA | California Independent System Operator (CISO) | 391.9 GWh | Oct 2020 | Apr 2025 | Solar |
Nachtigall 1836-WD | Standard Solar | Wasco, CA | California Independent System Operator (CISO) | 8.0 MWh | - | Dec 2024 | Solar |
Nacimiento Hydro Project | Monterey Cnty Water Res Agency | Bradley, CA | California Independent System Operator (CISO) | 18.2 GWh | Jun 1987 | Dec 2024 | Water |
Narrows 2 | Yuba County Water Agency | Browns Valley, CA | California Independent System Operator (CISO) | 156.8 GWh | Nov 1969 | Dec 2024 | Water |
Narrows PH | Yuba County Water Agency | Grass Valley, CA | California Independent System Operator (CISO) | 80.8 GWh | Nov 1942 | Dec 2024 | Water |
National Raisin | National Raisin | Fowler, CA | California Independent System Operator (CISO) | 4.8 GWh | May 2015 | Dec 2024 | Solar |
Navajo Solar Power Generation Station 1 | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 4.2 GWh | Nov 2013 | Dec 2024 | Solar |
Naval Air Weapons Station China Lake | MN8 Energy LLC | Ridgecrest, CA | California Independent System Operator (CISO) | 22.0 GWh | Aug 2012 | Dec 2024 | Solar |
Naval Hospital Medical Center | Department of the Navy | San Diego, CA | California Independent System Operator (CISO) | 11.3 GWh | Nov 2003 | Apr 2025 | Natural Gas |
Nelson Creek | Nelson Creek Power Inc | Big Bend, CA | California Independent System Operator (CISO) | 3.1 GWh | Sep 1989 | Dec 2024 | Water |
New Hogan Power Plant | Modesto Irrigation District | Valley Springs, CA | California Independent System Operator (CISO) | 8.8 GWh | Mar 1989 | Dec 2024 | Water |
New-Indy Ontario Mill | New-Indy Ontario LLC | Ontario, CA | California Independent System Operator (CISO) | 244.8 GWh | May 1985 | Apr 2025 | Natural Gas |
New Melones | U S Bureau of Reclamation | Jamestown, CA | Balancing Authority of Northern California (BANC) | 420.0 GWh | May 1979 | Apr 2025 | Water |
Newberry Solar 1 LLC | Newberry Solar 1 LLC | Newberry Springs, CA | California Independent System Operator (CISO) | 1.3 GWh | Nov 2013 | Dec 2023 | Solar |
Newcastle | Pacific Gas & Electric Co. | Auburn, CA | California Independent System Operator (CISO) | 7.5 GWh | Nov 1986 | Dec 2024 | Water |
NextEra Westside PV | Westside Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 40.6 GWh | Feb 2017 | Dec 2024 | Solar |
Niagara Bottling - Rialto | SkyHigh 2 Solar | Rialto, CA | California Independent System Operator (CISO) | 7.6 GWh | Nov 2021 | Dec 2024 | Solar |
Niagara Bottling Stockton | ClearGen LLC | Stockton, CA | California Independent System Operator (CISO) | 1.7 GWh | Dec 2017 | Dec 2023 | Solar |
Nickel 1 Solar Facility | Altus Power America Management, LLC | Lost Hills, CA | California Independent System Operator (CISO) | 2.3 GWh | Oct 2012 | Dec 2024 | Solar |
Nicolis Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 39.4 GWh | Aug 2016 | Dec 2024 | Solar |
Niland Gas Turbine Plant | Imperial Irrigation District | Niland, CA | Imperial Irrigation District (IID) | 55.7 GWh | May 2008 | Dec 2024 | Natural Gas |
Nimbus | U S Bureau of Reclamation | Folsom, CA | Balancing Authority of Northern California (BANC) | 46.7 GWh | Apr 1955 | Apr 2025 | Water |
NLP Granger | Heelstone Energy Holdings, LLC | Valley Center, CA | California Independent System Operator (CISO) | 4.8 GWh | Aug 2016 | Dec 2024 | Solar |
Nordhoff Place | Los Angeles Department of Water & Power | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 1.1 GWh | Aug 2014 | Dec 2024 | Solar |
North Bay Solar 1 | AES Distributed Energy | Fairfield, CA | California Independent System Operator (CISO) | 1.7 GWh | Jul 2013 | Dec 2024 | Solar |
North Brawley Geothermal Plant | Ormat Nevada Inc | Brawley, CA | Imperial Irrigation District (IID) | 16.9 GWh | Sep 2009 | Dec 2024 | Geothermal |
North Juvenile Detention Center Solar | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 2.0 GWh | Oct 2019 | Dec 2024 | Solar |
North Kern 1 | Madison Energy Investments LLC | Shafter, CA | California Independent System Operator (CISO) | 3.9 GWh | May 2023 | Dec 2024 | Solar |
North Kern 2 | Madison Energy Investments LLC | City of Shafter, CA | California Independent System Operator (CISO) | 2.4 GWh | Jun 2024 | Dec 2024 | Solar |
North Kern 3 | Madison Energy Investments LLC | Bakersfield, CA | California Independent System Operator (CISO) | 6.0 MWh | Nov 2023 | Dec 2024 | Solar |
North Kern State Prison Phase II | SunE P11L Holdings, LLC | Delano, CA | California Independent System Operator (CISO) | 6.5 GWh | Aug 2012 | Dec 2024 | Solar |
North Lancaster Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 37.2 GWh | Nov 2016 | Dec 2024 | Solar |
North Palm Springs 1A | Greenbacker Renewable Energy Corporation | Palm Springs, CA | California Independent System Operator (CISO) | 5.2 GWh | Mar 2012 | Dec 2024 | Solar |
North Palm Springs 4A | Greenbacker Renewable Energy Corporation | Palm Springs, CA | California Independent System Operator (CISO) | 7.9 GWh | Sep 2012 | Dec 2024 | Solar |
North Rosamond Solar LLC | North Rosamond Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 398.4 GWh | May 2019 | Apr 2025 | Solar |
North Sky River Energy LLC | North Sky River Energy LLC | Weldon, CA | California Independent System Operator (CISO) | 435.0 GWh | Nov 2012 | Dec 2024 | Wind |
North Star Solar | Southern Power Co | Mendota, CA | California Independent System Operator (CISO) | 132.4 GWh | May 2015 | Dec 2024 | Solar |
Nunn | CD US Solar MT 2 LLC | Apple Valley, CA | California Independent System Operator (CISO) | 1.6 GWh | Jun 2013 | Dec 2024 | Solar |
Oak Creek Energy Systems I | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 54.5 GWh | May 1982 | Dec 2024 | Wind |
Oakley Solar Project | Oakley Solar Project LLC | Oakley, CA | California Independent System Operator (CISO) | 2.4 GWh | May 2013 | Dec 2023 | Solar |
Oasis Alta | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 57.0 GWh | Mar 2021 | Dec 2024 | Wind |
Oasis Wind | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 238.4 GWh | Nov 2004 | Dec 2024 | Wind |
Oberon II Solar Project | IP Oberon II, LLC | Desert Center, CA | California Independent System Operator (CISO) | 611.2 GWh | Aug 2023 | Apr 2025 | Solar |
Oberon Solar Project | IP Oberon LLC | Desert Center, CA | California Independent System Operator (CISO) | 563.9 GWh | Aug 2023 | Apr 2025 | Solar |
Occidental College Solar Project | Occidental College | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 1.3 GWh | Jan 2013 | Dec 2024 | Solar |
Ocotillo Express LLC | Pattern Operators LP | Ocotillo, CA | California Independent System Operator (CISO) | 525.8 GWh | Nov 2012 | Apr 2025 | Wind |
Ocotillo Wells | Conductive Power | Borrego Springs, CA | California Independent System Operator (CISO) | 117.2 GWh | Aug 2023 | Apr 2025 | Solar |
OES Biogas Power | Organic Energy Solutions, Inc. | San Bernardino, CA | California Independent System Operator (CISO) | 4.9 GWh | - | Dec 2024 | Other Biomass Gas |
OK Produce Fresno Carport | OK Produce | Fresno, CA | California Independent System Operator (CISO) | 3.6 GWh | Dec 2018 | Dec 2024 | Solar |
Olive View Medical Center | Los Angeles County DHS | Sylmar, CA | Los Angeles Department of Water and Power (LDWP) | 11.4 GWh | Jan 1987 | Feb 2024 | Natural Gas |
Olsen | Olsen Power Partners | Whitmore, CA | California Independent System Operator (CISO) | 13.5 GWh | Dec 1989 | Dec 2024 | Water |
Oltmans SCE at Champagne | California PV Energy LLC | Ontario, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2013 | Dec 2024 | Solar |
Oltmans SCE at Jurupa | California PV Energy LLC | Ontario, CA | California Independent System Operator (CISO) | 2.4 GWh | Nov 2013 | Dec 2024 | Solar |
One Market Plaza | Paramount Group Inc | San Francisco, CA | California Independent System Operator (CISO) | 177.0 MWh | Nov 2003 | Dec 2024 | Natural Gas |
One Ten Partners PV | One Ten Partners, LLC | Palmdale, CA | California Independent System Operator (CISO) | 6.1 GWh | Aug 2017 | Dec 2024 | Solar |
Open Sky Dairy | Renewable Solar, Inc | Riverdale, CA | California Independent System Operator (CISO) | 2.1 GWh | Jun 2024 | Dec 2024 | Solar |
Open Sky Ranch Inc | Bravo REC Management LLC | Riverdale, CA | California Independent System Operator (CISO) | 1.9 GWh | Jun 2024 | Dec 2024 | Solar |
Orange Coast College PH2 Solar Project | Solar Star Coastal Pirate, LLC | Costa Mesa, CA | California Independent System Operator (CISO) | 4.6 GWh | Apr 2022 | Dec 2023 | Solar : 88.9% Electricity used for energy storage : 11.1% |
Orange Grove Peaking Facility | Orange Grove Energy LP | Pala, CA | California Independent System Operator (CISO) | 23.6 GWh | May 2010 | Dec 2024 | Natural Gas |
Orion Solar I | Orion Solar I LLC | Arvin, CA | California Independent System Operator (CISO) | 28.3 GWh | Mar 2014 | Dec 2024 | Solar |
Orion Solar II | Orion Solar II, LLC | Arvin, CA | California Independent System Operator (CISO) | 19.0 GWh | May 2014 | Dec 2024 | Solar |
Ormesa I | Ormat Nevada Inc | Holtville, CA | Imperial Irrigation District (IID) | 70.2 GWh | Nov 1986 | Dec 2024 | Geothermal |
Ormesa II | Ormat Nevada Inc | Holtville, CA | Imperial Irrigation District (IID) | 131.7 GWh | Apr 1989 | Dec 2024 | Geothermal |
Ormesa III | Ormat Nevada Inc | Holtville, CA | Imperial Irrigation District (IID) | 44.4 GWh | Apr 1989 | Dec 2024 | Geothermal |
Ormond Beach | Ormond Beach Power, LLC | Oxnard, CA | California Independent System Operator (CISO) | 50.3 GWh | Jul 1971 | Apr 2025 | Natural Gas |
Oro Loma | Consolidated Edison Development Inc. | Oro Loma, CA | California Independent System Operator (CISO) | 25.5 GWh | Dec 2016 | Dec 2024 | Solar |
Oroville Cogeneration LP | Apex Power Generation Corp. | Oroville, CA | California Independent System Operator (CISO) | 672.3 MWh | Dec 1989 | Dec 2024 | Natural Gas |
Otay Mesa Generating Project | Otay Mesa Energy Center LLC | San Diego, CA | California Independent System Operator (CISO) | 2.2 TWh | Sep 2009 | Apr 2025 | Natural Gas |
Otoe Solar Power Generation Station 1 LL | AES Distributed Energy | Apple Valley, CA | California Independent System Operator (CISO) | 3.4 GWh | Nov 2013 | Dec 2024 | Solar |
Owens Valley Solar Project 11 | Los Angeles Department of Water & Power | Olancha, CA | Los Angeles Department of Water and Power (LDWP) | 3.0 GWh | Nov 2016 | Dec 2024 | Solar |
Oxbow (CA) | Placer County Water Agency | Foresthill, CA | California Independent System Operator (CISO) | 29.2 GWh | Sep 1966 | Sep 2024 | Water |
Oxnard | Procter&Gamble Paper Products Co-Oxnard | Oxnard, CA | California Independent System Operator (CISO) | 482.3 GWh | Jun 1982 | Apr 2025 | Natural Gas |
Oxnard Paper Mill | New-Indy, Oxnard LLC | Oxnard, CA | California Independent System Operator (CISO) | 190.8 GWh | Feb 1986 | Apr 2025 | Natural Gas |
Oxnard Wastewater Treatment Plant | Oxnard City of | Oxnard, CA | California Independent System Operator (CISO) | 4.5 GWh | Jul 1981 | Apr 2025 | Other Biomass Gas : 94.0% Natural Gas : 6.0% |
P Plant | Qualcomm Incorporated | San Diego, CA | California Independent System Operator (CISO) | 30.5 GWh | Feb 2007 | Jul 2024 | Natural Gas |
Pacific Ethanol Madera Solar Array | Seaboard Energy California, LLC | Madera, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 2018 | Dec 2024 | Solar |
Pacific-Ultrapower Chinese Station | IHI Power Services Corp | Jamestown, CA | California Independent System Operator (CISO) | 145.9 GWh | Sep 1986 | Apr 2025 | Wood/Wood Waste Solids : 99.6% |
Pacific Wind LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 311.2 GWh | Jul 2012 | Dec 2024 | Wind |
Painted Hills Wind Park | Terra-Gen Operating Co-Wind | Whitewater, CA | California Independent System Operator (CISO) | 173.3 GWh | Oct 1985 | Apr 2025 | Wind |
Palo Verde College | Scale Sustainable I, LLC | Blythe, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2009 | Dec 2023 | Solar |
Palomar Energy | San Diego Gas & Electric Co | Escondido, CA | California Independent System Operator (CISO) | 961.8 GWh | Sep 2005 | Apr 2025 | Natural Gas |
Panoche Energy Center | Panoche Energy Center, LLC | Firebaugh, CA | California Independent System Operator (CISO) | 1.2 TWh | May 2009 | Apr 2025 | Natural Gas |
Panoche Valley Solar Farm | Consolidated Edison Development Inc. | Paicines, CA | California Independent System Operator (CISO) | 317.6 GWh | Dec 2017 | Apr 2025 | Solar |
Browse Power Plants By California Counties
Figures are based on April 2025 generation numbers.County | State Rank | Active Plants | Apr 2025 Generation |
---|---|---|---|
Alameda County, CA | # 22 | 46 | 2.4 TWh |
Amador County, CA | # 35 | 8 | 666.5 GWh |
Butte County, CA | # 15 | 25 | 3.8 TWh |
Calaveras County, CA | # 36 | 6 | 613.6 GWh |
Colusa County, CA | # 20 | 3 | 2.9 TWh |
Contra Costa County, CA | # 6 | 56 | 13.4 TWh |
El Dorado County, CA | # 28 | 15 | 1.5 TWh |
Fresno County, CA | # 8 | 109 | 8.1 TWh |
Glenn County, CA | # 54 | 2 | 18.7 GWh |
Humboldt County, CA | # 38 | 10 | 480.9 GWh |
Imperial County, CA | # 7 | 84 | 9.7 TWh |
Inyo County, CA | # 29 | 23 | 1.2 TWh |
Kern County, CA | # 1 | 311 | 34.0 TWh |
Kings County, CA | # 14 | 57 | 4.1 TWh |
Lake County, CA | # 32 | 10 | 921.2 GWh |
Lassen County, CA | # 40 | 9 | 341.0 GWh |
Los Angeles County, CA | # 2 | 307 | 20.7 TWh |
Madera County, CA | # 31 | 28 | 994.0 GWh |
Marin County, CA | # 53 | 3 | 19.0 GWh |
Mariposa County, CA | # 43 | 2 | 299.7 GWh |
Mendocino County, CA | # 55 | 5 | 12.3 GWh |
Merced County, CA | # 39 | 30 | 418.2 GWh |
Mono County, CA | # 34 | 9 | 785.9 GWh |
Monterey County, CA | # 16 | 29 | 3.7 TWh |
Napa County, CA | # 51 | 9 | 49.2 GWh |
Nevada County, CA | # 46 | 12 | 207.0 GWh |
Orange County, CA | # 17 | 59 | 3.2 TWh |
Placer County, CA | # 24 | 23 | 2.1 TWh |
County | State Rank | Active Plants | Apr 2025 Generation |
---|---|---|---|
Plumas County, CA | # 25 | 13 | 2.0 TWh |
Riverside County, CA | # 4 | 159 | 14.3 TWh |
Sacramento County, CA | # 10 | 64 | 6.4 TWh |
San Benito County, CA | # 41 | 6 | 332.7 GWh |
San Bernardino County, CA | # 5 | 203 | 13.4 TWh |
San Diego County, CA | # 12 | 150 | 5.0 TWh |
San Francisco County, CA | # 48 | 10 | 85.0 GWh |
San Joaquin County, CA | # 23 | 45 | 2.3 TWh |
San Luis Obispo County, CA | # 3 | 22 | 20.6 TWh |
San Mateo County, CA | # 47 | 10 | 133.4 GWh |
Santa Barbara County, CA | # 42 | 18 | 327.1 GWh |
Santa Clara County, CA | # 13 | 74 | 4.4 TWh |
Santa Cruz County, CA | # 50 | 6 | 56.2 GWh |
Shasta County, CA | # 9 | 46 | 7.2 TWh |
Sierra County, CA | # 52 | 3 | 31.1 GWh |
Siskiyou County, CA | # 44 | 8 | 242.5 GWh |
Solano County, CA | # 18 | 40 | 3.0 TWh |
Sonoma County, CA | # 11 | 26 | 5.2 TWh |
Stanislaus County, CA | # 21 | 25 | 2.6 TWh |
Sutter County, CA | # 26 | 8 | 1.8 TWh |
Tehama County, CA | # 49 | 7 | 59.7 GWh |
Trinity County, CA | # 37 | 5 | 573.8 GWh |
Tulare County, CA | # 30 | 68 | 1.0 TWh |
Tuolumne County, CA | # 19 | 23 | 3.0 TWh |
Ventura County, CA | # 33 | 32 | 828.4 GWh |
Yolo County, CA | # 45 | 15 | 222.2 GWh |
Yuba County, CA | # 27 | 5 | 1.7 TWh |