Miramar Energy Facility
6875 Consolidated Way, San Diego, CA 92121Plant Summary Information
Miramar Energy Facility is ranked #179 out of 339 natural gas power plants in California in terms of total annual net electricity generation.
Miramar Energy Facility is comprised of 2 generators and generated 2.3 GWh during the 3-month period between November 2024 to February 2025.
Plant Name | Miramar Energy Facility |
---|---|
Utility Name | San Diego Gas & Electric Co |
Location | San Diego County, CA |
Initial Operation Date | June 2005 |
Last Update | Feb 2025 |
Annual Generation | 12.0 GWh |
Annual Consumption | 124.9 k MMBtu |
Ranked #5,763 out of 12,288 Power Plants Nationwide | |
Ranked #1,518 out of 2,221 Natural Gas Power Plants Nationwide | |
Ranked #793 out of 1,564 California Power Plants | |
Ranked #179 out of 339 California Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Miramar Energy Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Miramar Energy Facility.
Monthly Net Generation for Miramar Energy Facility
Miramar Energy Facility Details
Summary Information | |
---|---|
Plant Name | Miramar Energy Facility (56232) |
Plant Address | 6875 Consolidated Way, San Diego, CA 92121 |
Utility | San Diego Gas & Electric Co (16609) |
Latitude, Longitude | 32.8769, -117.16639 |
Generation Dates on File | Jun 2005 to Feb 2025 |
Initial Operation Date | June 2005 |
Annual Generation | 12.0 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | SAN DIEGO GAS AND ELECTRIC COMPANY |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator 1 Details Operating June 2005
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | MIRAMREF_7_B1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | MIRAMREF_7_B1 |
Nameplate Capacity | 53 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 47 MW |
Winter Capacity | 47 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2005 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating August 2009
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | MRGT_6_NODE1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | MRGT_6_NODE1 |
Nameplate Capacity | 53 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 47 MW |
Winter Capacity | 47 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2009 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Miramar Energy Facility Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1508 | Biola University Hybrid | La Mirada, CA | 12.2 GWh |
#1509 | South District Wastewater Treatment Plt | Miami, FL | 21.6 GWh |
#1510 | Massena Energy Facility | Massena, NY | 12.2 GWh |
#1511 | Indiana University of Pennsylvania | Indiana, PA | 12.6 GWh |
#1512 | Kern Front Limited | Bakersfield, CA | 12.2 GWh |
#1513 | KSR053 Cantara Fuel Cell | Panorama City, CA | 12.1 GWh |
#1514 | Ivanpah 2 | Nipton, CA | 283.1 GWh |
#1515 | Park 500 Philip Morris USA | Chester, VA | 12.0 GWh |
#1516 | Covanta Fairfax Energy | Lorton, VA | 627.6 GWh |
#1517 | Holcomb | Holcomb, KS | 1.3 TWh |
#1519 | SCU000 El Camino Real Fuel Cell | Santa Clara, CA | 11.9 GWh |
#1520 | CC Perry K | Indianapolis, IN | 11.9 GWh |
#1521 | Live Oak Limited | Bakersfield, CA | 11.9 GWh |
#1522 | King City Peaking | King City, CA | 11.9 GWh |
#1523 | Cellu Tissue | East Hartford, CT | 11.8 GWh |
#1524 | Jamaica Bay Peaking | Far Rockaway, NY | 24.5 GWh |
#1525 | Bradley Energy Center | Windsor Locks, CT | 11.8 GWh |
#1526 | Fort Lupton | Ft. Lupton, CO | 12.4 GWh |
#1527 | UNH 7.9 MW Plant | Durham, NH | 49.5 GWh |
#1528 | EQX002 Secaucus Rd Fuel Cell | Secaucus, NJ | 11.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Miramar Energy Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AT&T - San Diego Trade Street | San Diego, CA | 6.4 GWh | 0.7 mi |
AT&T San Diego | San Diego, CA | 3.5 GWh | 2.7 mi |
Childrens Hospital | San Diego, CA | 26.1 GWh | 5.4 mi |
County of San Diego COC Hybrid | San Diego, CA | 3.1 GWh | 3.6 mi |
Illumina Way SD | San Diego, CA | 29.4 GWh | 2 mi |
Kilroy Solar | San Diego, CA | 6.2 GWh | 5.7 mi |
Kyocera International Inc.(San Diego) | San Diego, CA | 9.1 GWh | 4.2 mi |
Lindberg FIeld Solar | San Diego, CA | 4.6 GWh | 10.5 mi |
Lindberg Field Solar 2 | San Diego, CA | 1.7 GWh | 10.4 mi |
MM San Diego-Miramar | San Diego, CA | 46.1 GWh | 2.2 mi |
P Plant | San Diego, CA | 30.5 GWh | 2.2 mi |
Q Plant | San Diego, CA | 55.0 MWh | 2.8 mi |
San Diego Community College | San Diego, CA | 8.3 GWh | 4.9 mi |
San Diego State University | San Diego, CA | 49.1 GWh | 8.8 mi |
SDCCD - Miramar | San Diego, CA | 1.6 GWh | 3.3 mi |
Sycamore Energy LLC | Santee, CA | 23.1 GWh | 8.1 mi |
Univ of California San Diego Solar | La Jolla, CA | 2.1 GWh | 4.2 mi |
University of California San Diego Hybri | La Jolla, CA | 220.4 GWh | 4.2 mi |
University of San Diego | San Diego, CA | 8.2 GWh | 7.4 mi |
W Plant | San Diego, CA | 29.9 GWh | 2.5 mi |