Nickel 1 Solar Facility
20732 GP Road, Lost Hills, CA 93249Plant Summary Information
Nickel 1 Solar Facility is ranked #628 out of 816 solar farms in California in terms of total annual net electricity generation.
Nickel 1 Solar Facility generated 339.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Nickel 1 Solar Facility |
---|---|
Utility Name | Altus Power America Management, LLC |
Location | Kern County, CA |
Initial Operation Date | November 2012 |
Last Update | Dec 2024 |
Annual Generation | 2.3 GWh |
Annual Consumption | 8.4 k MMBtu |
Ranked #9,942 out of 12,288 Power Plants Nationwide | |
Ranked #4,777 out of 6,174 Solar Power Plants Nationwide | |
Ranked #1,343 out of 1,564 California Power Plants | |
Ranked #628 out of 816 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
NLH1 Solar LLC (2013 to 2019) Altus Power America Management, LLC (2020 to 2024) |
Map of Nickel 1 Solar Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Nickel 1 Solar Facility.
Monthly Net Generation for Nickel 1 Solar Facility
Nickel 1 Solar Facility Details
Summary Information | |
---|---|
Plant Name | Nickel 1 Solar Facility (58034) |
Plant Address | 20732 GP Road, Lost Hills, CA 93249 |
Utility | Altus Power America Management, LLC (60281) |
Latitude, Longitude | 35.6473, -119.71651 |
Generation Dates on File | Nov 2012 to Dec 2024 |
Initial Operation Date | November 2012 |
Annual Generation | 2.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 21.00 kV |
Energy Storage | No |
Generator 1 Details Operating November 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 1.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Nickel 1 Solar Facility Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4767 | 5601 Westside CDG | North Bergen, NJ | 2.3 GWh |
#4768 | Arrache 4006 | Palmdale, CA | 2.3 GWh |
#4769 | Sue Cleveland High School | Rio Rancho, NM | 2.3 GWh |
#4770 | Hewlett-Packard (HP) - Andover, MA | Andover, MA | 2.3 GWh |
#4771 | Acushnet-Braley Road 1 | Freetown, MA | 2.3 GWh |
#4772 | Building F | Santa Fe Springs, CA | 2.3 GWh |
#4773 | Americus | Emporia, KS | 2.3 GWh |
#4774 | CREE | Racine, WI | 2.3 GWh |
#4775 | Rockland Solar CSG | Rockland, MA | 2.3 GWh |
#4776 | Folsom SP and CSP Sacramento | Represa, CA | 2.3 GWh |
#4778 | Hubble Solar, LLC | Whiteville, NC | 2.3 GWh |
#4779 | Merrimac Solar | Merrimac, MA | 2.3 GWh |
#4780 | Legoland Solar | Winter Haven, FL | 2.3 GWh |
#4781 | General Electric Aircraft Engines | Lynn, MA | 2.3 GWh |
#4782 | Gilead Oceanside Solar Project | Oceanside, CA | 2.3 GWh |
#4783 | Xebec 1 | Sun Valley, CA | 2.3 GWh |
#4784 | Jericho Gravel Solar Farm | Jerico, VT | 2.3 GWh |
#4785 | Arkansas Valley | Ozark, AR | 2.3 GWh |
#4786 | IKEA College Park 411 | College Park, MD | 2.3 GWh |
#4787 | O'Fallon Renewable Energy Center | O'Fallon, MO | 2.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Nickel 1 Solar Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Blackwell Solar Park | Lost Hills, CA | 31.3 GWh | 7.6 mi |
Chevron - Lost Hills Hybrid | Lost Hills, CA | 67.7 GWh | 2.4 mi |
Coronal Lost Hills | Lost Hills, CA | 37.4 GWh | 12 mi |
Cottonwood Solar, LLC (Goose Lake) | Lost Hills, CA | 31.5 GWh | 8.5 mi |
Elk Hills Cogen | Tupman, CA | 52.8 GWh | 11.7 mi |
Lost Hills Cogeneration Plant | Lost Hills, CA | 9.2 GWh | 3.1 mi |
Lost Hills Oilfield | Lost Hills, CA | 4.5 GWh | 7.5 mi |
Lost Hills/Blackwell | Lost Hills, CA | 80.6 GWh | 7.7 mi |
Morelos del Sol | Lost Hills, CA | 29.9 GWh | 8.2 mi |
Rio Bravo Solar 1 LLC | McKittrick, CA | 52.3 GWh | 16.1 mi |
Rio Bravo Solar II LLC | McKittrick, CA | 50.8 GWh | 16.3 mi |
Roll Lost Hills | Lost Hills, CA | 5.5 GWh | 9.7 mi |
South Belridge Cogeneration Facility | McKittrick, CA | 476.3 GWh | 14.4 mi |
Wildwood Solar I, LLC | Wasco, CA | 41.9 GWh | 8.1 mi |
Wildwood Solar II | Wasco, CA | 38.5 GWh | 8.1 mi |
Wonderful Huller & Shellling | Lost Hills, CA | 3.5 GWh | 6.4 mi |
Wonderful Kings | Lost Hills, CA | 7.7 GWh | 12 mi |
Wonderful Lost Hills | Lost Hills, CA | 48.2 GWh | 9.1 mi |
Wonderful Orchards - Belridge | Lost Hills, CA | 11.9 GWh | 10.3 mi |
Wonderful Orchards - Westside | Lost Hills, CA | 12.7 GWh | 6.1 mi |