Marsh Landing Generating Station
3201 Wilbur Avenue, Antioch, CA 94509Plant Summary Information
Marsh Landing Generating Station is ranked #124 out of 317 natural gas power plants in California in terms of total annual net electricity generation.
Marsh Landing Generating Station is comprised of 4 generators and generated 10.2 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Marsh Landing Generating Station |
|---|---|
| Utility Name | Marsh Landing LLC |
| Location | Contra Costa County, CA |
| Initial Operation Date | May 2013 |
| Last Update | Aug 2026 |
| Annual Generation | 25.2 GWh |
| Annual Consumption | 423.1 k MMBtu |
| Ranked #5,144 out of 13,301 Power Plants Nationwide | |
| Ranked #1,333 out of 2,218 Natural Gas Power Plants Nationwide | |
| Ranked #645 out of 1,641 California Power Plants | |
| Ranked #124 out of 317 California Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
| Previous Operator |
NRG Marsh Landing LLC (2013 to 2017) Marsh Landing LLC (2018 to 2025) |
Map of Marsh Landing Generating Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Marsh Landing Generating Station.
Monthly Net Generation for Marsh Landing Generating Station
Monthly Plant Fuel Consumption for Marsh Landing Generating Station
Marsh Landing Generating Station Details
| Summary Information | |
|---|---|
| Plant Name | Marsh Landing Generating Station (57267) |
| Plant Address | 3201 Wilbur Avenue, Antioch, CA 94509 |
| Utility | Marsh Landing LLC (56635) |
| Latitude, Longitude | 38.01694, -121.765 |
| Generation Dates on File | May 2013 to Aug 2026 |
| Initial Operation Date | May 2013 |
| Annual Generation | 25.2 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | PACIFIC GAS |
| Natural Gas Storage | No |
| Liquefied Natural Gas Storage | No |
Generator 1 Details Operating May 2013
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 207 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 191.9 MW |
| Winter Capacity | 201.6 MW |
| Minimum Load | 120 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2013 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator 2 Details Operating May 2013
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 207 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 191.1 MW |
| Winter Capacity | 200.7 MW |
| Minimum Load | 120 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2013 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator 3 Details Operating May 2013
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 207 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 190.4 MW |
| Winter Capacity | 200.3 MW |
| Minimum Load | 120 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2013 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator 4 Details Operating May 2013
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 207 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 191.8 MW |
| Winter Capacity | 202.2 MW |
| Minimum Load | 120 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2013 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Marsh Landing Generating Station Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Clearway Energy, Inc | 300 Carnegie Center, Suite 300, Princeton, NJ 8540 | Generator 1 | 100.00% |
| Clearway Energy, Inc | 300 Carnegie Center, Suite 300, Princeton, NJ 8540 | Generator 2 | 100.00% |
| Clearway Energy, Inc | 300 Carnegie Center, Suite 300, Princeton, NJ 8540 | Generator 3 | 100.00% |
| Clearway Energy, Inc | 300 Carnegie Center, Suite 300, Princeton, NJ 8540 | Generator 4 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1323 | Stony Brook | Ludlow, MA | 123.8 GWh |
| #1324 | Calhoun Port Comfort | Point Comfort, TX | 26.0 GWh |
| #1325 | Fernandina Plant | Fernandina Beach, FL | 177.7 GWh |
| #1326 | Central Energy Plant USU | Logan, UT | 25.9 GWh |
| #1327 | Prairie Creek | Cedar Rapids, IA | 52.6 GWh |
| #1328 | Princeton Energy Center, LLC | Plainsboro, NJ | 26.0 GWh |
| #1329 | River Valley | Panama, OK | 606.9 GWh |
| #1330 | Weston | Rothschild, WI | 4.0 TWh |
| #1331 | McIntosh | Rincon, GA | 41.3 GWh |
| #1332 | Frito Lay Incorporated | Dayville, CT | 25.3 GWh |
| #1334 | Victoria Port II | Victoria, TX | 25.2 GWh |
| #1335 | Western Power & Steam Inc | Bakersfield, CA | 25.1 GWh |
| #1336 | Potter Station 2 | Braintree, MA | 41.0 GWh |
| #1337 | Micro Santa Clara | San Jose, CA | 24.8 GWh |
| #1338 | Savannah River Mill | Rincon, GA | 135.3 GWh |
| #1339 | Hunterstown | Gettysburg, PA | 24.5 GWh |
| #1340 | Prairie State Generating Station | Marissa, IL | 12.2 TWh |
| #1341 | Gerald Gentleman | Sutherland, NE | 6.6 TWh |
| #1342 | Warner Lambert | Ann Arbor, MI | 24.4 GWh |
| #1343 | CIP II/AR Bridgewater Holdings - NJCOE | Bridgewater, NJ | 24.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Marsh Landing Generating Station.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ameresco Keller Canyon | Bay Point, CA | 15.8 GWh | 9.3 mi |
| California PV Energy at ISD WWTP | Oakley, CA | 1.9 GWh | 3.5 mi |
| Columbia Solar Energy, LLC | Pittsburg, CA | 11.9 GWh | 5.4 mi |
| CSD 2 - Heritage High | Brentwood, CA | 1.7 GWh | 6.6 mi |
| CSD 2- Freedom High | Oakley, CA | 1.3 GWh | 4.1 mi |
| Delta Energy Center | Pittsburg, CA | 3.4 TWh | 4.3 mi |
| EDF Renewable Windfarm V Inc | Birds Landing, CA | 22.9 GWh | 7.8 mi |
| FPL Energy Montezuma Winds LLC | Birds Landing, CA | 95.5 GWh | 10.3 mi |
| Gateway Generating Station | Antioch, CA | 2.4 TWh | 0.3 mi |
| High Winds LLC | Birds Landing, CA | 214.3 GWh | 8.7 mi |
| Kaiser Deer Valley Rd. Fuel Cell | Antioch, CA | 10.9 GWh | 4.5 mi |
| Los Medanos Energy Center | Pittsburg, CA | 2.6 TWh | 5.9 mi |
| Montezuma Wind II | Birds Landing, CA | 195.8 GWh | 7.6 mi |
| Oakley Solar Project | Oakley, CA | 2.1 GWh | 1.4 mi |
| Rio Vista Solar | Rio Vista, CA | 3.1 GWh | 11.1 mi |
| Riverview Energy Center | Antioch, CA | 12.3 GWh | 1.4 mi |
| Shiloh I Wind Project | Rio Vista, CA | 400.0 GWh | 8.5 mi |
| Shiloh III Wind Project LLC | Birds Landing, CA | 282.0 GWh | 11.4 mi |
| Shiloh IV Wind Project LLC | Birds Landing, CA | 292.8 GWh | 9.7 mi |
| Solano Wind | Rio Vista, CA | 704.5 GWh | 6.9 mi |