160 Rio Robles, San Jose, CA 95134Plant Summary Information
Maxim is ranked #275 out of 342 natural gas power plants in California in terms of total annual net electricity generation.
Maxim is comprised of 1 generator and generated 1.3 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Maxim |
|---|---|
| Utility Name | Bloom Energy |
| Location | Santa Clara County, CA |
| Initial Operation Date | August 2014 |
| Last Update | Dec 2024 |
| Annual Generation | 6.0 GWh |
| Annual Consumption | 100.2 k MMBtu |
| Ranked #7,639 out of 12,529 Power Plants Nationwide | |
| Ranked #1,706 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #1,046 out of 1,600 California Power Plants | |
| Ranked #275 out of 342 California Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Maxim
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Maxim.
Monthly Net Generation for Maxim
Maxim Details
| Summary Information | |
|---|---|
| Plant Name | Maxim (59802) |
| Plant Address | 160 Rio Robles, San Jose, CA 95134 |
| Utility | Bloom Energy (57128) |
| Latitude, Longitude | 37.40569, -121.94942 |
| Generation Dates on File | Aug 2014 to Dec 2024 |
| Initial Operation Date | August 2014 |
| Annual Generation | 6.0 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
| Grid Voltage | 21.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | Other - See pipeline notes. |
| Pipeline Name | PACIFIC GAS |
| Natural Gas Storage | No |
Generator MXM00 Details Operating August 2014
| Technology | Other Natural Gas |
|---|---|
| Prime Mover | Fuel Cell |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 1.1 MW |
| Summer Capacity | 1 MW |
| Winter Capacity | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 2014 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
Maxim Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Maxim | 160 Rio Robles, San Jose, CA 95134 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1696 | Gianera | Santa Clara, CA | 6.2 GWh |
| #1697 | York County Resource Recovery | York, PA | 221.0 GWh |
| #1698 | Palm Beach Renewable Energy Facility 2 | West Palm Beach, FL | 542.7 GWh |
| #1699 | Plains End | Arvada, CO | 6.1 GWh |
| #1700 | CalPeak Power Enterprise Peaker Plant | Escondido, CA | 6.1 GWh |
| #1701 | Higginsville | Higginsville, MO | 6.4 GWh |
| #1702 | POET Biorefining - Leipsic, LLC | Leipsic, OH | 6.0 GWh |
| #1703 | Bos Dairy, LLC | Fair Oaks, IN | 6.0 GWh |
| #1704 | Hanford Energy Park Peaker | Hanford, CA | 6.0 GWh |
| #1705 | Minnesota River | Chaska, MN | 6.0 GWh |
| #1707 | Fairmont (MN) | Fairmont, MN | 6.1 GWh |
| #1708 | Cuyamaca Peak Energy Plant | El Cajon, CA | 5.9 GWh |
| #1709 | Verizon-Torrance | Torrance, CA | 5.8 GWh |
| #1710 | Calumet Energy Team LLC | Chicago, IL | 5.8 GWh |
| #1711 | Rio Bravo Fresno | Fresno, CA | 108.4 GWh |
| #1712 | NSB Nuiqsut Utility | Nuiqsut, AK | 7.7 GWh |
| #1713 | Chalk Cliff Limited | Bakersfield, CA | 5.7 GWh |
| #1714 | POET Biorefining Lake Crystal | Lake Crystal, MN | 6.8 GWh |
| #1715 | Washington City Electric Generation | Washington, UT | 5.7 GWh |
| #1716 | AT&T - Redwood City | Redwood City, CA | 5.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Maxim.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Agnews Power Plant | San Jose, CA | 10.3 GWh | 1.2 mi |
| AT&T Holger | San Jose, CA | 1.3 GWh | 0.9 mi |
| Beckton Dickenson - San Jose | San Jose, CA | 5.4 GWh | 3.5 mi |
| CST001 McCarthy Fuel Cell | Milpitas, CA | 8.7 GWh | 1.8 mi |
| Donald Von Raesfeld Power Plant | Santa Clara, CA | 781.7 GWh | 2 mi |
| Equinix Lundy Ave. Fuel Cell | San Jose, CA | 26.3 GWh | 3.5 mi |
| EQX011 Duane Fuel Cell | Santa Clara, CA | 22.5 GWh | 1.9 mi |
| FLEX Gibraltar | Milpitas, CA | 8.7 GWh | 3.1 mi |
| Gianera | Santa Clara, CA | 6.2 GWh | 1.1 mi |
| Google Moffett Park Solar Project | Sunnyvale, CA | 2.6 GWh | 3.7 mi |
| Intel Santa Clara | Santa Clara, CA | 7.7 GWh | 1.6 mi |
| Los Esteros Critical Energy Center | San Jose, CA | 173.1 GWh | 1.6 mi |
| Micro Santa Clara | San Jose, CA | 8.6 GWh | 3.3 mi |
| Mission College Blvd. Fuel Cell | Santa Clara, CA | 39.9 GWh | 1.5 mi |
| Santa Clara Cogen | Santa Clara, CA | 15.3 GWh | 2.9 mi |
| SC 1 Data Center, Phase 2 | Santa Clara, CA | 2.3 GWh | 3.1 mi |
| SCU000 El Camino Real Fuel Cell | Santa Clara, CA | 11.9 GWh | 3.9 mi |
| SJ/SC WPCP | San Jose, CA | 82.7 GWh | 2 mi |
| Sunnyvale City of WPCP | Sunnyvale, CA | 9.5 GWh | 3.7 mi |
| Zero Waste Energy Development Co LLC | San Jose, CA | 1.8 GWh | 1.9 mi |