Meridian Vineyards
7000 E Highway 46, Paso Robles, CA 93446Plant Summary Information
Meridian Vineyards is ranked #794 out of 849 solar farms in California in terms of total annual net electricity generation.
Meridian Vineyards generated 65.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Meridian Vineyards |
|---|---|
| Utility Name | CVI CleanCapital Solar 1 LLC |
| Location | San Luis Obispo County, CA |
| Initial Operation Date | December 2010 |
| Last Update | Dec 2024 |
| Annual Generation | 1.0 GWh |
| Annual Consumption | 3.7 k MMBtu |
| Ranked #11,423 out of 12,539 Power Plants Nationwide | |
| Ranked #6,093 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #1,524 out of 1,600 California Power Plants | |
| Ranked #794 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
Gestamp Asetym Solar North America (2013 to 2014) X-Elio North America Inc (2015 to 2017) CleanCapital (2018 to 2021) CVI CleanCapital Solar 1 LLC (2022 to 2024) |
Map of Meridian Vineyards
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Meridian Vineyards.
Monthly Net Generation for Meridian Vineyards
Meridian Vineyards Details
| Summary Information | |
|---|---|
| Plant Name | Meridian Vineyards (57982) |
| Plant Address | 7000 E Highway 46, Paso Robles, CA 93446 |
| Utility | CVI CleanCapital Solar 1 LLC (65432) |
| Latitude, Longitude | 35.67028, -120.56694 |
| Generation Dates on File | Jan 2011 to Dec 2024 |
| Initial Operation Date | December 2010 |
| Annual Generation | 1.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 11-45-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
| Grid Voltage | 0.48 kV |
| Energy Storage | No |
Generator PV-1 Details Operating December 2010
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 0.5 MW |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2010 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 30 |
| DC Net Capacity | 0.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 0.6 MW |
| Virtual Net Metering Agreement | No |
Generator PV-2 Details Operating December 2010
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 0.6 MW |
| Summer Capacity | 0.6 MW |
| Winter Capacity | 0.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2010 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 30 |
| DC Net Capacity | 0.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 0.7 MW |
| Virtual Net Metering Agreement | No |
Meridian Vineyards Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Bank of America Leasing & Capital LLC | 555 California Street, San Francisco, CA 94104 | Generator PV-1 | 100.00% |
| Bank of America Leasing & Capital LLC | 555 California Street, San Francisco, CA 94104 | Generator PV-2 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6083 | Manlius East | Manlius, NY | 1.1 GWh |
| #6084 | Advance Stores Company, Inc | Enfield, CT | 1.1 GWh |
| #6085 | Rockdale | Williamsport, MD | 1.1 GWh |
| #6086 | Osage (IA) | Osage, IA | 5.6 GWh |
| #6087 | NES Rutgers Solar | Lakewood, NJ | 1.1 GWh |
| #6088 | North Smithfield Solar Power 1 | North Smithfield, RI | 1.1 GWh |
| #6089 | Westside Avenue | North Bergen, NJ | 1.1 GWh |
| #6090 | Atlanta Falcons Solar | Atlanta, GA | 1.1 GWh |
| #6091 | Domino Farms Solar | Ann Arbor, MI | 1.1 GWh |
| #6092 | ADP Roseland, NJ | Roseland, NJ | 1.0 GWh |
| #6094 | Howell (Lowes) | Howell, NJ | 1.0 GWh |
| #6095 | White Marsh Mall | Baltimore, MD | 1.0 GWh |
| #6096 | Harrah's Atlantic City - POI 2 (Self Par | Atlantic City, NJ | 1.0 GWh |
| #6097 | Hunterdon Health System Solar Project | Clinton, NJ | 1.0 GWh |
| #6098 | Clemons Road Solar | Minoa, NY | 1.0 GWh |
| #6099 | IOS - MEW Phase 1 | Madison, ME | 1.0 GWh |
| #6100 | CAMILLUS B (CSG) | Camillus, NY | 1.0 GWh |
| #6101 | WYM 1250 Palmer LLC | Palmer, MA | 1.0 GWh |
| #6102 | Taylorsville Solar LLC | Taylorsville, NC | 1.0 GWh |
| #6103 | ETS Ewing Solar Facility | Ewing, NJ | 1.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Meridian Vineyards.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Aera San Ardo Cogen Facility | San Ardo, CA | 17.2 GWh | 25.5 mi |
| Atascadero State Hospital | Atascadero, CA | 2.8 GWh | 14.8 mi |
| Avenal Park | Avenal, CA | 9.5 GWh | 33.8 mi |
| CA Flats Solar 130, LLC | Shandon, CA | 262.5 GWh | 9.9 mi |
| CA Flats Solar 150, LLC | Shandon, CA | 299.6 GWh | 9.9 mi |
| CA-DGS-California Men's Colony | San Luis Obispo, CA | 4.6 GWh | 24.9 mi |
| Camp San Luis Obispo | San Luis Obispo, CA | 158.0 MWh | 25.8 mi |
| CED Avenal | Avenal, CA | 9.7 GWh | 32.4 mi |
| Cold Canyon 1 | San Luis Obispo, CA | 3.8 GWh | 33.5 mi |
| Firestone Walker Brewery - Phase 1 | Paso Robles, CA | 3.3 GWh | 8.8 mi |
| Nacimiento Hydro Project | Bradley, CA | 18.2 GWh | 19.8 mi |
| Paso Robles - Municipal Airport | Paso Robles, CA | 6.0 GWh | 3.9 mi |
| Salinas River Cogeneration | San Ardo, CA | 258.0 GWh | 25.7 mi |
| Sand Drag LLC | Avenal, CA | 28.2 GWh | 33.5 mi |
| Stenner Creek Solar | San Luis Obispo, CA | 9.5 GWh | 25.2 mi |
| Sun City Project LLC | Avenal, CA | 33.9 GWh | 33.5 mi |
| Sutter Home Winery TCC | Paso Robles, CA | 1.1 GWh | 8 mi |
| Topaz Solar Farm | Santa Margarita, CA | 1.0 TWh | 33.5 mi |
| Vintner Solar | Templeton, CA | 4.2 GWh | 10.1 mi |
| Wonderful Orchards - West Valley | Blackwells Corner, CA | 1.4 GWh | 33.4 mi |