Martinez Refining
3485 Pacheco Blvd, Martinez, CA 94553Plant Summary Information
Martinez Refining is ranked #33 out of 317 natural gas power plants in California in terms of total annual net electricity generation.
Martinez Refining is comprised of 3 generators and generated 187.1 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Martinez Refining |
|---|---|
| Utility Name | Martinez Refining Co |
| Location | Contra Costa County, CA |
| Initial Operation Date | November 1995 |
| Last Update | Aug 2026 |
| Annual Generation | 658.2 GWh |
| Annual Consumption | 10.5 M MMBtu |
| Ranked #1,076 out of 13,301 Power Plants Nationwide | |
| Ranked #513 out of 2,218 Natural Gas Power Plants Nationwide | |
| Ranked #51 out of 1,641 California Power Plants | |
| Ranked #33 out of 317 California Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 96.1% Other Gas : 3.9% |
Map of Martinez Refining
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Martinez Refining.
Monthly Net Generation for Martinez Refining
Monthly Plant Fuel Consumption for Martinez Refining
Martinez Refining Details
| Summary Information | |
|---|---|
| Plant Name | Martinez Refining (54912) |
| Plant Address | 3485 Pacheco Blvd, Martinez, CA 94553 |
| Utility | Martinez Refining Co (11651) |
| Latitude, Longitude | 38.0169, -122.1117 |
| Generation Dates on File | Jan 2001 to Aug 2026 |
| Initial Operation Date | November 1995 |
| Annual Generation | 658.2 GWh |
| Fuel Types | Natural Gas : 96.1% Other Gas : 3.9% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | Yes |
| FERC Cogeneration Docket Number | 95-314-000 |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Petroleum and Coal Products Manufacturing (324) |
| Sector | Industrial CHP (7) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | PACIFIC GAS |
| Natural Gas Storage | No |
Generator GTG1 Details Operating November 1995
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 40 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 40 MW |
| Winter Capacity | 42 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 1995 |
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator STG1 Details Operating December 1995
| Technology | Other Gases |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 20 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 20 MW |
| Winter Capacity | 20 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 1995 |
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | B |
| Energy Source | Other Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator GTG2 Details Operating January 1996
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 40 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 40 MW |
| Winter Capacity | 42 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 1996 |
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Martinez Refining Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #503 | Ladysmith | Woodford, VA | 748.0 GWh |
| #504 | Permian Basin | Monahans, TX | 669.5 GWh |
| #505 | Emporia Energy Center | Emporia, KS | 658.2 GWh |
| #506 | Tracy Combined Cycle Power Plant | Tracy, CA | 656.1 GWh |
| #507 | Greenland Energy Center | Jacksonville, FL | 658.1 GWh |
| #508 | Marsh Run Generation Facility | Remington, VA | 687.4 GWh |
| #509 | Cherokee County Cogen | Gaffney, SC | 644.3 GWh |
| #510 | Brandywine Power Facility | Brandywine, MD | 676.1 GWh |
| #511 | Crockett Cogen Project | Crockett, CA | 639.9 GWh |
| #512 | T H Wharton | Houston, TX | 637.4 GWh |
| #514 | Greenidge Generation LLC | Dresden, NY | 624.9 GWh |
| #515 | Freeport LP Pretreatment Facility | Freeport, TX | 623.7 GWh |
| #516 | Morris Cogeneration LLC | Morris, IL | 613.1 GWh |
| #517 | Louisa Generation Facility | Gordonsville, VA | 646.1 GWh |
| #518 | Kennedy International Airport Cogen | Jamaica, NY | 609.1 GWh |
| #519 | Gregory Power Plant | Gregory, TX | 604.4 GWh |
| #520 | AES Petersburg | Petersburg, IN | 4.1 TWh |
| #521 | Desert Star Energy Center | Boulder City, NV | 599.8 GWh |
| #522 | Marathon Bay Area Cogen | Martinez, CA | 598.3 GWh |
| #523 | RockGen Energy Center | Cambridge, WI | 597.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Martinez Refining.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ameresco Keller Canyon | Bay Point, CA | 15.8 GWh | 9.7 mi |
| American Canyon Solar | American Canyon, CA | 6.0 GWh | 11.4 mi |
| Bear Creek Solar (Orinda) | Orinda, CA | 7.4 GWh | 7.9 mi |
| Bio-Rad | Hercules, CA | 3.2 GWh | 8.8 mi |
| C&H Sugar Plant | Crockett, CA | 36.4 GWh | 6.5 mi |
| CA Dept of Public Health at Richmond | Richmond, CA | 4.0 GWh | 14.3 mi |
| CCCSD Wastewater Treatment Plnt | Martinez, CA | 20.0 GWh | 2.6 mi |
| Central San | Martinez, CA | 3.0 GWh | 2.1 mi |
| Columbia Solar Energy, LLC | Pittsburg, CA | 11.9 GWh | 13.4 mi |
| Crockett Cogen Project | Crockett, CA | 639.9 GWh | 6.3 mi |
| Delta Energy Center | Pittsburg, CA | 3.4 TWh | 14.6 mi |
| Lake Herman | Benicia, CA | 8.0 GWh | 5.8 mi |
| Los Medanos Energy Center | Pittsburg, CA | 2.6 TWh | 13 mi |
| Marathon Bay Area Cogen | Martinez, CA | 598.3 GWh | 2.9 mi |
| Martinez Sulfuric Acid Regeneration Plt | Martinez, CA | 13.4 GWh | 1 mi |
| P66 Rodeo Solar | Rodeo, CA | 56.9 GWh | 7.5 mi |
| PE Berkeley | Berkeley, CA | 126.7 GWh | 13.1 mi |
| SFDK Solar | Vallejo, CA | 10.0 GWh | 10.3 mi |
| Sutter Home Winery GIR | American Canyon, CA | 1.9 GWh | 14.6 mi |
| Valero Refinery Cogeneration Unit 1 | Benicia, CA | 236.7 GWh | 4.2 mi |