Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Ivanpah 1 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 179.1 GWh | Nov 2013 | Apr 2025 | Solar : 96.4% Natural Gas : 3.6% |
Ivanpah 2 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 276.7 GWh | Nov 2013 | Apr 2025 | Solar : 95.9% Natural Gas : 4.1% |
Ivanpah 3 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 261.8 GWh | Nov 2013 | Apr 2025 | Solar : 96.2% Natural Gas : 3.8% |
IVC Solar | Imperial Irrigation District | Imperial, CA | Imperial Irrigation District (IID) | 4.2 GWh | Nov 2016 | Dec 2024 | Solar |
J.R. Simplot Company | J.R. Simplot Company | Lathrop, CA | California Independent System Operator (CISO) | 8.9 GWh | Sep 1993 | Dec 2023 | Waste Heat |
J S Eastwood | Southern California Edison Co | Shaver Lake, CA | California Independent System Operator (CISO) | 1.3 GWh | Nov 1987 | Apr 2025 | Water |
Jacumba Solar Farm | Invenergy Services LLC | Jacumba, CA | California Independent System Operator (CISO) | 48.3 GWh | Jun 2017 | Dec 2024 | Solar |
James B Black | Pacific Gas & Electric Co. | Big Bend, CA | California Independent System Operator (CISO) | 432.7 GWh | Nov 1965 | Apr 2025 | Water |
Java Solar, LLC | Java Solar, LLC | Lemoore, CA | California Independent System Operator (CISO) | 27.2 GWh | Oct 2022 | Dec 2024 | Solar |
Jaybird | Sacramento Municipal Util Dist | Camino, CA | Balancing Authority of Northern California (BANC) | 444.3 GWh | Mar 1961 | Apr 2025 | Water |
JD Foods - JD Foods | Barrier Solar Inc | Fresno, CA | California Independent System Operator (CISO) | 455.0 MWh | Sep 2020 | Dec 2024 | Solar |
John L. Featherstone Plant | Hudson Ranch Power I LLC | Calipatria, CA | Imperial Irrigation District (IID) | 437.4 GWh | Feb 2012 | Apr 2025 | Geothermal |
Jones Fork | Sacramento Municipal Util Dist | Fresh Pond, CA | Balancing Authority of Northern California (BANC) | 8.6 GWh | May 1985 | Dec 2024 | Water |
JSR000 N Mathilda Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 9.2 GWh | May 2019 | Dec 2024 | Natural Gas |
Judge F Carr | U S Bureau of Reclamation | French Gulch, CA | Balancing Authority of Northern California (BANC) | 260.9 GWh | Apr 1963 | Apr 2025 | Water |
Juniper Networks Sunnyvale | Bloom Energy | Sunnyvale, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2012 | Dec 2024 | Natural Gas |
Kaiser Deer Valley Rd. Fuel Cell | 2016 ESA Project Company, LLC | Antioch, CA | California Independent System Operator (CISO) | 11.2 GWh | Mar 2017 | Dec 2024 | Natural Gas |
Kaiser Downey | Bloom Energy 2009 PPA | Downey, CA | California Independent System Operator (CISO) | 8.7 GWh | May 2012 | Dec 2024 | Natural Gas |
Kaiser East La Palma Ave. Fuel Cell | 2016 ESA Project Company, LLC | Anaheim, CA | California Independent System Operator (CISO) | 18.1 GWh | Aug 2017 | Dec 2024 | Natural Gas |
Kaiser - Harbor City | Bloom Energy | Harbor City, CA | California Independent System Operator (CISO) | 17.9 GWh | Nov 2019 | Dec 2024 | Natural Gas |
Kaiser - LA | Bloom Energy | Los Angeles, CA | California Independent System Operator (CISO) | 19.1 GWh | May 2020 | Dec 2024 | Natural Gas |
Kaiser Napa Valley Corporate Dr Fuel Cel | 2016 ESA Project Company, LLC | Napa, CA | California Independent System Operator (CISO) | 37.6 GWh | May 2017 | Dec 2024 | Natural Gas |
Kaiser Ontario | Bloom Energy 2009 PPA | Ontario, CA | California Independent System Operator (CISO) | 2.8 GWh | Sep 2012 | Dec 2024 | Natural Gas |
Kaiser Owens Dr. Fuel Cell | 2016 ESA Project Company, LLC | Pleasanton, CA | California Independent System Operator (CISO) | 7.9 GWh | Aug 2017 | Dec 2024 | Natural Gas |
Kaiser - Woodland Hills | Bloom Energy | Woodland Hills, CA | California Independent System Operator (CISO) | 20.8 GWh | Aug 2019 | Dec 2024 | Natural Gas |
Karen Avenue Wind Farm | San Gorgonio Farms Inc | North Palm Springs, CA | California Independent System Operator (CISO) | 23.4 GWh | Dec 1984 | Dec 2024 | Wind |
Kaweah 2 | Southern California Edison Co | Three Rivers, CA | California Independent System Operator (CISO) | 1.3 GWh | Aug 1929 | Dec 2024 | Water |
Kaweah Delta District Hospital | Kaweah Delta Hospital | Visalia, CA | California Independent System Operator (CISO) | 21.3 GWh | Sep 2008 | Apr 2025 | Natural Gas |
Kellogg's - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 6.6 GWh | Aug 2013 | Dec 2024 | Natural Gas |
Kelly Ridge | South Feather Water and Power Agency | Oroville, CA | California Independent System Operator (CISO) | 66.5 GWh | Aug 1963 | Dec 2024 | Water |
Kerckhoff 2 | Pacific Gas & Electric Co. | Auberry, CA | California Independent System Operator (CISO) | 407.9 GWh | Apr 1983 | Apr 2025 | Water |
Kern Front Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 12.2 GWh | Jan 1989 | Dec 2024 | Natural Gas |
Kern Oil & Refining Co | Kern Oil & Refining Co | Bakersfield, CA | California Independent System Operator (CISO) | 34.8 GWh | Sep 2002 | Apr 2025 | Natural Gas |
Kern River 1 | Southern California Edison Co | Bakersfield, CA | California Independent System Operator (CISO) | 192.1 GWh | Apr 1907 | Dec 2024 | Water |
Kern River 3 | Southern California Edison Co | Kernville, CA | California Independent System Operator (CISO) | 142.8 GWh | Feb 1921 | Dec 2024 | Water |
Kern River Cogeneration | Kern River Cogeneration Co | Bakersfield, CA | California Independent System Operator (CISO) | 238.4 GWh | Jun 1985 | Jan 2025 | Natural Gas |
Kern River Eastridge Cogen | Chevron USA Inc | Bakersfield, CA | California Independent System Operator (CISO) | 203.9 GWh | May 1988 | Apr 2025 | Natural Gas |
Kern Sunset 1886-WD | Standard Solar | Bakersfield, CA | California Independent System Operator (CISO) | 270.0 MWh | - | Dec 2024 | Solar |
Kern Valley SP | Ecoplexus, Inc | Delano, CA | California Independent System Operator (CISO) | 7.9 GWh | Aug 2023 | Dec 2024 | Solar |
Keswick | U S Bureau of Reclamation | Redding, CA | Balancing Authority of Northern California (BANC) | 377.0 GWh | Sep 1949 | Apr 2025 | Water |
Kettering Solar 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.6 GWh | May 2014 | Dec 2024 | Solar |
Kettering Solar 2 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.9 GWh | May 2014 | Dec 2024 | Solar |
Kettleman Solar -Centaurus | Boralex US Operations LLC | Kettleman City, CA | California Independent System Operator (CISO) | 37.7 GWh | Jun 2015 | Dec 2023 | Solar |
Kettleman Solar Project | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 2.6 GWh | Mar 2014 | Dec 2024 | Solar |
Keysight - Santa Rosa | Bloom Energy | Santa Rosa, CA | California Independent System Operator (CISO) | 12.8 GWh | Aug 2018 | Dec 2024 | Natural Gas |
Kiefer Landfill | Sacramento County of Dpt Waste | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 51.0 GWh | Nov 1999 | Dec 2024 | Landfill Gas |
Kilroy Solar | Nautilus Solar Solutions | San Diego, CA | California Independent System Operator (CISO) | 6.2 GWh | Dec 2017 | Dec 2024 | Solar |
King City Peaking | Calpine Corp-King City | King City, CA | California Independent System Operator (CISO) | 11.9 GWh | Mar 2002 | Dec 2024 | Natural Gas |
King City Power Plant | Calpine King City Cogen LLC | King City, CA | California Independent System Operator (CISO) | 38.1 GWh | Jan 1989 | Apr 2025 | Natural Gas |
Kingbird A Solar LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 45.8 GWh | Mar 2016 | Dec 2024 | Solar |
Kingbird B Solar, LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 55.8 GWh | Mar 2016 | Dec 2024 | Solar |
Kings River PH | Pacific Gas & Electric Co. | Balch Camp, CA | California Independent System Operator (CISO) | 106.9 GWh | Feb 1962 | Dec 2024 | Water |
Kings River Syphon | Orange Cove Irrigation District | Sanger, CA | California Independent System Operator (CISO) | 325.0 MWh | Aug 1990 | May 2024 | Water |
Kingsburg Cogen | KES Kingsburg LP | Kingsburg, CA | California Independent System Operator (CISO) | 11.0 GWh | Nov 1990 | Nov 2024 | Natural Gas |
Kingsburg Solar | Altus Power America Management, LLC | Kingsburg, CA | California Independent System Operator (CISO) | 6.0 GWh | Nov 2013 | Dec 2024 | Solar |
Kohls San Bernardino Solar Facility | SunE WF3 KHL A Holdings, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 944.0 MWh | Oct 2007 | Dec 2024 | Solar |
Kroger La Habra | Ralph's Grocery Company | La Habra, CA | California Independent System Operator (CISO) | 1.7 GWh | Mar 2020 | Dec 2024 | Solar |
KSR028 Merced Fuel Cell | 2016 ESA Project Company, LLC | San Leandro, CA | California Independent System Operator (CISO) | 15.7 GWh | Mar 2018 | Dec 2024 | Natural Gas |
KSR053 Cantara Fuel Cell | 2016 ESA Project Company, LLC | Panorama City, CA | California Independent System Operator (CISO) | 12.1 GWh | Apr 2018 | Dec 2024 | Natural Gas |
Kumeyaay Wind | Leeward Asset Management, LLC | Campo, CA | California Independent System Operator (CISO) | 127.2 GWh | Nov 2005 | Dec 2024 | Wind |
Kyocera International Inc.(San Diego) | Kyocera International, Inc | San Diego, CA | California Independent System Operator (CISO) | 9.1 GWh | Aug 2012 | Dec 2024 | Natural Gas |
L-8 Solar Project | L-8 Solar Project LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.4 GWh | Apr 2012 | Dec 2024 | Solar |
La Grange | Turlock Irrigation District | La Grange, CA | Turlock Irrigation District (TIDC) | 4.4 GWh | Nov 1924 | Dec 2024 | Water |
La Joya Del Sol | CVI CleanCapital Solar 1 LLC | Fresno, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2012 | Dec 2024 | Solar |
La Paloma Generating Plant | CXA La Paloma LLC | McKittrick, CA | California Independent System Operator (CISO) | 2.1 TWh | Dec 2002 | Apr 2025 | Natural Gas |
Lafayette 2 - Internal Services Dept | MN8 Energy LLC | Los Angeles, CA | California Independent System Operator (CISO) | 2.6 GWh | Jul 2020 | Dec 2024 | Solar |
Lafayette 2 - MLK Jr. Hospital (MLK) | MN8 Energy LLC | Los Angeles, CA | California Independent System Operator (CISO) | 2.3 GWh | Jul 2020 | Dec 2024 | Solar |
Laguna Water Reclamation Facility | City of Santa Rosa | Santa Rosa, CA | California Independent System Operator (CISO) | 11.2 GWh | Feb 2013 | Dec 2024 | Other Biomass Gas : 85.8% Natural Gas : 14.2% |
Lake Elsinore Canopies - Lakeside HS | Standard Solar | Lake Elsinore, CA | California Independent System Operator (CISO) | 1.8 GWh | Feb 2022 | Dec 2024 | Solar |
Lake Herman | Greenbacker Renewable Energy Corporation | Benicia, CA | California Independent System Operator (CISO) | 13.0 GWh | Oct 2021 | Dec 2024 | Solar |
Lake Mathews | Metropolitan Water District of S CA | Riverside, CA | California Independent System Operator (CISO) | 8.0 GWh | Jul 1980 | Jul 2024 | Water |
Lake Mendocino | City of Ukiah - (CA) | Ukiah, CA | California Independent System Operator (CISO) | 12.3 GWh | Apr 1987 | Dec 2024 | Water |
Lake One | City of Burbank Water and Power | Burbank, CA | Los Angeles Department of Water and Power (LDWP) | 285.0 MWh | May 2002 | Dec 2024 | Natural Gas |
Lambie Energy Center | Gilroy Energy Center LLC | Suisun, CA | California Independent System Operator (CISO) | 9.7 GWh | Dec 2002 | Dec 2024 | Natural Gas |
Lancaster | Clean Focus Yield, LLC | Lancaster, CA | California Independent System Operator (CISO) | 8.1 GWh | Oct 2018 | Dec 2024 | Solar |
Lancaster Baptist Church | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2011 | Dec 2024 | Solar |
Lancaster Dry Farm Ranch B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 7.8 GWh | Oct 2014 | Dec 2024 | Solar |
Lancaster Little Rock | AES Distributed Energy | Landers, CA | California Independent System Operator (CISO) | 3.0 GWh | Nov 2014 | Dec 2024 | Solar |
Lancaster Solar 1 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.4 GWh | Oct 2014 | Dec 2024 | Solar |
Lancaster Solar 2 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.6 GWh | Oct 2014 | Dec 2024 | Solar |
Lancaster WAD B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 7.5 GWh | Mar 2017 | Dec 2024 | Solar |
Laredo Detention Facility - Solar 2, 3 | County of Kern | Bakersfield, CA | California Independent System Operator (CISO) | 5.1 GWh | Oct 2021 | Dec 2024 | Solar |
Larkspur Energy Facility | Diamond Generating Corporation | San Diego, CA | California Independent System Operator (CISO) | 24.4 GWh | Jun 2001 | Dec 2024 | Natural Gas |
Las Virgenes | Greenbacker Renewable Energy Corporation | Calabasas, CA | Los Angeles Department of Water and Power (LDWP) | 7.1 GWh | Nov 2020 | Dec 2024 | Solar |
Las Virgenes Municipal Water District | Tesla Inc. | Calabasas, CA | California Independent System Operator (CISO) | 1.6 GWh | Jan 2014 | Dec 2024 | Solar |
Lavio Solar | Lavio Solar, LLC | Petaluma, CA | California Independent System Operator (CISO) | 1.7 GWh | Mar 2018 | Dec 2024 | Solar |
Lemoore 1 | AES Distributed Energy | Lemoore, CA | California Independent System Operator (CISO) | 1.4 GWh | Jan 2016 | Dec 2024 | Solar |
Lemoore West | Leprino Foods | Lemoore, CA | California Independent System Operator (CISO) | 14.4 GWh | Nov 2022 | Dec 2024 | Solar |
Liberty HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2018 | Dec 2024 | Solar |
Life Technologies Carlsbad | Bloom Energy | Carlsbad, CA | California Independent System Operator (CISO) | 8.6 GWh | Jul 2012 | Dec 2024 | Natural Gas |
Life Technologies - Fremont | Bloom Energy | Fremont, CA | California Independent System Operator (CISO) | 10.0 GWh | Nov 2020 | Dec 2024 | Natural Gas |
Life Technologies - Pleasanton | Bloom Energy | Pleasanton, CA | California Independent System Operator (CISO) | 8.5 GWh | Feb 2013 | Dec 2024 | Natural Gas |
Lincoln Landfill | Energy 2001 Inc | Lincoln, CA | California Independent System Operator (CISO) | 29.5 GWh | Oct 2004 | Dec 2024 | Landfill Gas |
Lincoln WWTF Hybrid | Lincoln Solar Star, LLC | Lincoln, CA | California Independent System Operator (CISO) | 6.4 GWh | Jul 2021 | Dec 2024 | Solar |
Lindberg FIeld Solar | Lindberg Field Solar I LLC | San Diego, CA | California Independent System Operator (CISO) | 4.6 GWh | Aug 2015 | Dec 2023 | Solar |
Lindberg Field Solar 2 | Lindberg Field Solar 2, LLC | San Diego, CA | California Independent System Operator (CISO) | 1.7 GWh | Jan 2017 | Dec 2024 | Solar |
Lindsay Solar | Altus Power America Management, LLC | Lindsay, CA | California Independent System Operator (CISO) | 6.2 GWh | Dec 2013 | Dec 2024 | Solar |
Little Bear 3 | Little Bear Solar 3, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 26.2 GWh | Nov 2020 | Dec 2024 | Solar |
Little Bear 4 | Little Bear Solar 4, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 48.0 GWh | Nov 2020 | Apr 2025 | Solar |
Little Bear 5 | Little Bear Solar 5, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 120.9 GWh | Nov 2020 | Apr 2025 | Solar |
Browse Power Plants By California Counties
Figures are based on April 2025 generation numbers.County | State Rank | Active Plants | Apr 2025 Generation |
---|---|---|---|
Alameda County, CA | # 22 | 46 | 2.4 TWh |
Amador County, CA | # 35 | 8 | 666.5 GWh |
Butte County, CA | # 15 | 25 | 3.8 TWh |
Calaveras County, CA | # 36 | 6 | 613.6 GWh |
Colusa County, CA | # 20 | 3 | 2.9 TWh |
Contra Costa County, CA | # 6 | 56 | 13.4 TWh |
El Dorado County, CA | # 28 | 15 | 1.5 TWh |
Fresno County, CA | # 8 | 109 | 8.1 TWh |
Glenn County, CA | # 54 | 2 | 18.7 GWh |
Humboldt County, CA | # 38 | 10 | 480.9 GWh |
Imperial County, CA | # 7 | 84 | 9.7 TWh |
Inyo County, CA | # 29 | 23 | 1.2 TWh |
Kern County, CA | # 1 | 311 | 34.0 TWh |
Kings County, CA | # 14 | 57 | 4.1 TWh |
Lake County, CA | # 32 | 10 | 921.2 GWh |
Lassen County, CA | # 40 | 9 | 341.0 GWh |
Los Angeles County, CA | # 2 | 307 | 20.7 TWh |
Madera County, CA | # 31 | 28 | 994.0 GWh |
Marin County, CA | # 53 | 3 | 19.0 GWh |
Mariposa County, CA | # 43 | 2 | 299.7 GWh |
Mendocino County, CA | # 55 | 5 | 12.3 GWh |
Merced County, CA | # 39 | 30 | 418.2 GWh |
Mono County, CA | # 34 | 9 | 785.9 GWh |
Monterey County, CA | # 16 | 29 | 3.7 TWh |
Napa County, CA | # 51 | 9 | 49.2 GWh |
Nevada County, CA | # 46 | 12 | 207.0 GWh |
Orange County, CA | # 17 | 59 | 3.2 TWh |
Placer County, CA | # 24 | 23 | 2.1 TWh |
County | State Rank | Active Plants | Apr 2025 Generation |
---|---|---|---|
Plumas County, CA | # 25 | 13 | 2.0 TWh |
Riverside County, CA | # 4 | 159 | 14.3 TWh |
Sacramento County, CA | # 10 | 64 | 6.4 TWh |
San Benito County, CA | # 41 | 6 | 332.7 GWh |
San Bernardino County, CA | # 5 | 203 | 13.4 TWh |
San Diego County, CA | # 12 | 150 | 5.0 TWh |
San Francisco County, CA | # 48 | 10 | 85.0 GWh |
San Joaquin County, CA | # 23 | 45 | 2.3 TWh |
San Luis Obispo County, CA | # 3 | 22 | 20.6 TWh |
San Mateo County, CA | # 47 | 10 | 133.4 GWh |
Santa Barbara County, CA | # 42 | 18 | 327.1 GWh |
Santa Clara County, CA | # 13 | 74 | 4.4 TWh |
Santa Cruz County, CA | # 50 | 6 | 56.2 GWh |
Shasta County, CA | # 9 | 46 | 7.2 TWh |
Sierra County, CA | # 52 | 3 | 31.1 GWh |
Siskiyou County, CA | # 44 | 8 | 242.5 GWh |
Solano County, CA | # 18 | 40 | 3.0 TWh |
Sonoma County, CA | # 11 | 26 | 5.2 TWh |
Stanislaus County, CA | # 21 | 25 | 2.6 TWh |
Sutter County, CA | # 26 | 8 | 1.8 TWh |
Tehama County, CA | # 49 | 7 | 59.7 GWh |
Trinity County, CA | # 37 | 5 | 573.8 GWh |
Tulare County, CA | # 30 | 68 | 1.0 TWh |
Tuolumne County, CA | # 19 | 23 | 3.0 TWh |
Ventura County, CA | # 33 | 32 | 828.4 GWh |
Yolo County, CA | # 45 | 15 | 222.2 GWh |
Yuba County, CA | # 27 | 5 | 1.7 TWh |