Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Elk Hills Power LLC | Elk Hills Power LLC | Tupman, CA | California Independent System Operator (CISO) | 3.0 TWh | Jun 2003 | Sep 2025 | Natural Gas |
| Ellwood | Ellwood Power, LLC | Goleta, CA | California Independent System Operator (CISO) | 2.5 GWh | Jul 1974 | Dec 2024 | Natural Gas |
| Elmore Company | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 104.3 GWh | Oct 1988 | Dec 2024 | Geothermal |
| EMWD - Moreno Valley RWRF | SkyHigh 2 Solar | Moreno Valley, CA | California Independent System Operator (CISO) | 5.5 GWh | Jun 2021 | Dec 2024 | Solar |
| EMWD - Perris Valley RWRF | SkyHigh 2 Solar | Perris, CA | California Independent System Operator (CISO) | 6.4 GWh | Jun 2021 | Dec 2024 | Solar |
| EMWD - San Jacinto RES BCT | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 3.0 GWh | Apr 2022 | Dec 2024 | Solar |
| EMWD - San Jacinto RWRF NEM | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 10.2 GWh | Jun 2021 | Dec 2024 | Solar |
| EMWD - Sun City RWRF | SkyHigh 2 Solar | Menifee, CA | California Independent System Operator (CISO) | 3.7 GWh | Jun 2021 | Dec 2024 | Solar |
| Encina Water Pollution Control | Encina Joint Powers Authority | Carlsbad, CA | California Independent System Operator (CISO) | 14.2 GWh | Oct 2008 | Sep 2025 | Other Biomass Gas : 94.8% Natural Gas : 5.2% |
| Energy Center | University of Redlands | Redlands, CA | California Independent System Operator (CISO) | 1.5 GWh | Jan 2007 | Dec 2024 | Natural Gas |
| Enerparc CA1 LLC | Enerparc CA 1, LLC | Hollister, CA | California Independent System Operator (CISO) | 2.5 GWh | May 2014 | Dec 2023 | Solar |
| Enloe Medical - Chico | Bloom Energy | Chico, CA | California Independent System Operator (CISO) | 13.3 GWh | May 2021 | Dec 2024 | Natural Gas |
| Equilon Los Angeles Refining | Tesoro Refining and Marketing Company | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 283.8 GWh | Nov 1982 | Sep 2025 | Other Gas : 97.5% Natural Gas : 2.5% |
| Equinix Caspian Dr. Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 38.3 GWh | Nov 2017 | Dec 2024 | Natural Gas |
| Equinix Douglas St. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 8.0 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Equinix Great Oaks Blvd. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 30.9 GWh | Nov 2017 | Dec 2024 | Natural Gas |
| Equinix Lundy Ave. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 26.3 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Equinix Maple Ave. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 7.7 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Equinix San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 16.4 GWh | Oct 2015 | Dec 2024 | Natural Gas |
| EQX010 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 19.6 GWh | Aug 2019 | Dec 2024 | Natural Gas |
| EQX011 Duane Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 22.5 GWh | Aug 2018 | Dec 2024 | Natural Gas |
| EQX015 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 30.6 GWh | Dec 2017 | Dec 2024 | Natural Gas |
| ESCA-LL-COLTON, LLC | Madison Energy Holdings LLC | Colton, CA | California Independent System Operator (CISO) | 4.0 GWh | Aug 2021 | Dec 2024 | Solar |
| Escondido Energy Center | Wellhead Services, Inc | Escondido, CA | California Independent System Operator (CISO) | 9.4 GWh | Dec 2013 | Dec 2024 | Natural Gas |
| Estrella Solar & Storage | AES Clean Energy | Lancaster, CA | California Independent System Operator (CISO) | 153.1 GWh | Nov 2023 | Sep 2025 | Solar |
| Etiwanda | Metropolitan Water District of S CA | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 21.1 GWh | Nov 1994 | Mar 2024 | Water |
| Exchequer | Merced Irrigation District | Snelling, CA | California Independent System Operator (CISO) | 267.9 GWh | Jun 1967 | Dec 2024 | Water |
| Exeter Solar | Altus Power America Management, LLC | Exeter, CA | California Independent System Operator (CISO) | 4.6 GWh | Jan 2014 | Dec 2024 | Solar |
| Expressway Solar A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 4.5 GWh | Apr 2014 | Dec 2024 | Solar |
| Expressway Solar B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 4.0 GWh | Apr 2014 | Dec 2024 | Solar |
| Expressway Solar C2 | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 3.3 GWh | Oct 2014 | Dec 2024 | Solar |
| Extreme San Ignacio | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 5.6 GWh | Apr 2019 | Jun 2024 | Natural Gas |
| Extreme Via Del Oro | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.0 GWh | Feb 2019 | Mar 2024 | Natural Gas |
| FAA NorCal TRACON | Enfinity NorCal 1 FAA LLC | Mather AFB, CA | Balancing Authority of Northern California (BANC) | 1.6 GWh | Nov 2012 | Dec 2024 | Solar |
| Fall Creek | PacifiCorp | Hornbrook, CA | PacifiCorp West (PACW) | 6.0 GWh | Aug 1903 | Dec 2024 | Water |
| Farmersville | Arevon Energy, Inc. | Farmersville, CA | California Independent System Operator (CISO) | 6.5 GWh | Jun 2014 | Dec 2024 | Solar |
| Feather River Energy Center | Calpine Corp-Yuba City | Yuba City, CA | California Independent System Operator (CISO) | 45.7 GWh | Dec 2002 | Dec 2024 | Natural Gas |
| Fifth Standard Solar PV, LLC (Hybrid) | Big Sky Wind, LLC | Huron, CA | California Independent System Operator (CISO) | 317.9 GWh | Aug 2023 | Sep 2025 | Solar |
| Firebaugh-CCS-PV-1 | Mike Woolf Farming | Firebaugh, CA | California Independent System Operator (CISO) | 1.9 GWh | Feb 2015 | Dec 2024 | Solar |
| Firestone Walker Brewery - Phase 1 | SkyHigh 2 Solar | Paso Robles, CA | California Independent System Operator (CISO) | 3.3 GWh | Oct 2020 | Dec 2024 | Solar |
| Five H Farms Solar Array | Maas Energy Works | Merced, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 2021 | Jun 2024 | Solar |
| Five Points Solar Park | Boralex US Operations LLC | Five Points, CA | California Independent System Operator (CISO) | 93.3 GWh | Aug 2016 | Dec 2024 | Solar |
| Five Points Solar Station | Pacific Gas & Electric Co. | Five Points, CA | California Independent System Operator (CISO) | 15.4 GWh | Aug 2011 | Dec 2024 | Solar |
| FLEX Gibraltar | Bloom Energy | Milpitas, CA | California Independent System Operator (CISO) | 8.7 GWh | Jan 2017 | Dec 2024 | Natural Gas |
| Folsom | U S Bureau of Reclamation | Folsom, CA | Balancing Authority of Northern California (BANC) | 509.9 GWh | Apr 1955 | Sep 2025 | Water |
| Folsom SP and CSP Sacramento | Ecoplexus, Inc | Represa, CA | Balancing Authority of Northern California (BANC) | 2.3 GWh | Apr 2019 | Dec 2024 | Solar |
| Fontana | Southern California Edison Co | Rialto, CA | California Independent System Operator (CISO) | 8.7 GWh | Nov 1917 | Dec 2024 | Water |
| Foothill | Los Angeles Department of Water & Power | Sylmar, CA | Los Angeles Department of Water and Power (LDWP) | 39.6 GWh | Sep 1971 | Dec 2024 | Water |
| Foothill Feeder | Metropolitan Water District of S CA | Castaic, CA | California Independent System Operator (CISO) | 19.6 GWh | Mar 1981 | Dec 2023 | Water |
| Forbestown | South Feather Water and Power Agency | Forbestown, CA | California Independent System Operator (CISO) | 128.5 GWh | Sep 1963 | Dec 2024 | Water |
| Forever 21 Retail, Inc. | Los Angeles Department of Water & Power | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 1.1 GWh | Jan 2015 | Dec 2024 | Solar |
| Forks of Butte Hydro Project | Hypower Energy, LLC | Magalia, CA | California Independent System Operator (CISO) | 65.9 GWh | Feb 1992 | Dec 2024 | Water |
| Foundation AB | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2011 | Dec 2024 | Wind |
| Foundation California Training Facility | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 5.4 GWh | Jul 2018 | Dec 2024 | Wind |
| Foundation CDCR LAC | Foundation CA Fund VIII Manager, LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.7 GWh | Nov 2017 | Dec 2024 | Wind |
| Foundation Cemex BMQ | Foundation CA Fund VI Manager LLC | Apple Valley, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2012 | Dec 2024 | Wind |
| Foundation Cemex Madison | Foundation CA Fund V Manager, LLC | Madison, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 2012 | Dec 2024 | Wind |
| Foundation Cemex River Plant | Foundation CA Fund VI Manager LLC | Victorville, CA | California Independent System Operator (CISO) | 3.1 GWh | Nov 2012 | Dec 2024 | Wind |
| Foundation Dole Fresh Vegetables | Foundation CA Fund X Manager LLC | Soledad, CA | California Independent System Operator (CISO) | 17.1 GWh | Jul 2022 | Dec 2024 | Wind |
| Foundation IE | Foundation HA Energy Generation, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 373.0 MWh | Nov 2011 | Dec 2024 | Wind |
| Foundation Mann Packing | Foundation CA Fund IX Manager, LLC | Gonzales, CA | California Independent System Operator (CISO) | 5.6 GWh | Mar 2019 | Dec 2024 | Wind |
| Foundation NWNA | Foundation CA Fund V Manager, LLC | Cabazon, CA | California Independent System Operator (CISO) | 18.1 GWh | Nov 2012 | Dec 2024 | Wind |
| Foundation RRM | Foundation CA Fund V Manager, LLC | Cabazon, CA | California Independent System Operator (CISO) | 8.9 GWh | Nov 2012 | Dec 2024 | Wind |
| Foundation SaIinas Valley State Prison | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 4.8 GWh | Jul 2018 | Dec 2024 | Wind |
| Foundation Scheid Vineyards | Foundation CA Fund VIII Manager, LLC | Greenfield, CA | California Independent System Operator (CISO) | 3.9 GWh | Aug 2017 | Dec 2024 | Wind |
| Foundation ST | Foundation HA Energy Generation, LLC | Tracy, CA | California Independent System Operator (CISO) | 2.2 GWh | May 2011 | Dec 2024 | Wind |
| Foundation Superior Farms | Foundation CA Fund VI Manager LLC | Dixon, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2012 | Sep 2025 | Wind |
| Foundation Wal-Mart Red Bluff | Foundation CA Fund VI Manager LLC | Red Bluff, CA | California Independent System Operator (CISO) | 1.8 GWh | Aug 2012 | Sep 2025 | Wind |
| FPL Energy Montezuma Winds LLC | FPL Energy Montezuma Wind | Birds Landing, CA | California Independent System Operator (CISO) | 85.4 GWh | Oct 2010 | Dec 2024 | Wind |
| Francisco St. Solar | AES Distributed Energy | Torrance, CA | Los Angeles Department of Water and Power (LDWP) | 1.2 GWh | Nov 2018 | Dec 2024 | Solar |
| Frankenheimer Power Plant | Turlock Irrigation District | Oakdale, CA | California Independent System Operator (CISO) | 12.6 GWh | Feb 1983 | Oct 2024 | Water |
| Franklin Templeton San Mateo | Bloom Energy | San Mateo, CA | California Independent System Operator (CISO) | 9.3 GWh | Oct 2011 | Dec 2024 | Natural Gas |
| Freeway Springs | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 3.1 GWh | Sep 2016 | Dec 2024 | Solar |
| Fremont CA AutoFactory | Tesla Inc. | Fremont, CA | California Independent System Operator (CISO) | 480.0 MWh | Feb 2022 | Dec 2024 | Solar |
| Fremont - Kato Rd | Tesla Inc. | Fremont, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2016 | Dec 2024 | Solar |
| French Meadows | Placer County Water Agency | Foresthill, CA | California Independent System Operator (CISO) | 50.8 GWh | Sep 1966 | Dec 2024 | Water |
| Fresno Bullard High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.1 GWh | Feb 2020 | Dec 2024 | Solar |
| Fresno Cogen Partners | Wellhead Services, Inc | San Joaquin, CA | California Independent System Operator (CISO) | 2.4 GWh | Dec 1989 | Dec 2024 | Natural Gas |
| Fresno Community Solar | Fresno Community Solar Developers, LLC | Fresno, CA | California Independent System Operator (CISO) | 15.4 GWh | May 2024 | Dec 2024 | Solar |
| Fresno Hoover High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.0 GWh | Feb 2020 | Dec 2024 | Solar |
| Fresno Solar | Wellhead Services, Inc | San Joaquin, CA | California Independent System Operator (CISO) | 4.7 GWh | Sep 2015 | Dec 2024 | Solar |
| Fresno Sunnyside High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2020 | Dec 2024 | Solar |
| Friant Hydro Facility | Friant Power Authority | Friant, CA | California Independent System Operator (CISO) | 59.8 GWh | Mar 1985 | Dec 2024 | Water |
| Frontier HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2018 | Dec 2024 | Solar |
| Frontier Solar LLC | Boralex US Operations LLC | Newman, CA | California Independent System Operator (CISO) | 38.6 GWh | May 2016 | Dec 2024 | Solar |
| FRV SI Transport Solar LP | FRV SI Transport Solar, L.P. (Sacremento) | Sacramento, CA | California Independent System Operator (CISO) | 1.4 GWh | Jul 2010 | Dec 2024 | Solar |
| FTF-PackingShed | Family Tree Farms | Reedley, CA | California Independent System Operator (CISO) | 581.0 MWh | May 2013 | Dec 2024 | Solar |
| G2 Energy Hay Rd | G2 Energy LLC | Vacaville, CA | California Independent System Operator (CISO) | 12.2 GWh | May 2013 | Dec 2024 | Landfill Gas |
| G2 Energy Ostrom Road LLC | G2 Energy LLC | Wheatland, CA | California Independent System Operator (CISO) | 29.0 GWh | Jan 2009 | Dec 2024 | Landfill Gas |
| Gap Pacific Distribution Center | MN8 Energy LLC | Fresno, CA | California Independent System Operator (CISO) | 5.4 GWh | Sep 2008 | Dec 2024 | Solar |
| Garnet Solar Generation Station I LLC | Garnet Solar Generation Station I LLC | Palm Springs, CA | California Independent System Operator (CISO) | 9.0 GWh | Nov 2014 | Dec 2024 | Solar |
| Garnet Wind Energy Center | Terra-Gen Operating Co-Wind | North Palm Springs, CA | California Independent System Operator (CISO) | 11.9 GWh | May 2009 | Dec 2024 | Wind |
| Gas Utilization Facility | City of San Diego | San Diego, CA | California Independent System Operator (CISO) | 30.7 GWh | May 1985 | Sep 2025 | Other Biomass Gas |
| Gaskell West 1 Solar Facility | Southern Power Co | Lancaster, CA | California Independent System Operator (CISO) | 52.6 GWh | Feb 2018 | Dec 2024 | Solar |
| Gates Solar Station | Pacific Gas & Electric Co. | Huron, CA | California Independent System Operator (CISO) | 31.7 GWh | May 2013 | Dec 2024 | Solar |
| Gateway Generating Station | Pacific Gas & Electric Co. | Antioch, CA | California Independent System Operator (CISO) | 3.0 TWh | Dec 2008 | Sep 2025 | Natural Gas |
| GEN005 Antibody Fuel Cell | 2016 ESA Project Company, LLC | Oceanside, CA | California Independent System Operator (CISO) | 20.6 GWh | Mar 2019 | Dec 2024 | Natural Gas |
| Genentech-Oceanside Hybrid | Tesla Inc. | Oceanside, CA | California Independent System Operator (CISO) | 3.6 GWh | Mar 2016 | Dec 2024 | Solar |
| Genentech Vacaville Meter #1 | Tesla Inc. | Vacaville, CA | California Independent System Operator (CISO) | 11.0 GWh | Apr 2017 | Dec 2024 | Solar |
| Genesis Solar Energy Project | Genesis Solar LLC | Blythe, CA | California Independent System Operator (CISO) | 623.0 GWh | Oct 2013 | Sep 2025 | Solar |
Browse Power Plants By California Counties
Figures are based on September 2025 generation numbers.| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Alameda County, CA | # 22 | 47 | 2.5 TWh |
| Amador County, CA | # 35 | 8 | 649.7 GWh |
| Butte County, CA | # 15 | 25 | 3.4 TWh |
| Calaveras County, CA | # 38 | 6 | 513.9 GWh |
| Colusa County, CA | # 18 | 3 | 2.9 TWh |
| Contra Costa County, CA | # 5 | 56 | 13.2 TWh |
| El Dorado County, CA | # 29 | 15 | 1.4 TWh |
| Fresno County, CA | # 9 | 119 | 7.6 TWh |
| Glenn County, CA | # 54 | 2 | 18.7 GWh |
| Humboldt County, CA | # 39 | 10 | 467.8 GWh |
| Imperial County, CA | # 7 | 84 | 9.7 TWh |
| Inyo County, CA | # 30 | 23 | 1.1 TWh |
| Kern County, CA | # 1 | 313 | 34.9 TWh |
| Kings County, CA | # 13 | 57 | 4.3 TWh |
| Lake County, CA | # 32 | 10 | 905.4 GWh |
| Lassen County, CA | # 40 | 9 | 341.0 GWh |
| Los Angeles County, CA | # 3 | 308 | 18.9 TWh |
| Madera County, CA | # 31 | 28 | 950.7 GWh |
| Marin County, CA | # 53 | 3 | 19.0 GWh |
| Mariposa County, CA | # 43 | 2 | 299.7 GWh |
| Mendocino County, CA | # 55 | 5 | 12.3 GWh |
| Merced County, CA | # 37 | 31 | 522.8 GWh |
| Mono County, CA | # 33 | 9 | 785.9 GWh |
| Monterey County, CA | # 17 | 29 | 3.2 TWh |
| Napa County, CA | # 51 | 9 | 51.0 GWh |
| Nevada County, CA | # 45 | 12 | 219.1 GWh |
| Orange County, CA | # 19 | 59 | 2.9 TWh |
| Placer County, CA | # 24 | 24 | 2.0 TWh |
| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Plumas County, CA | # 25 | 13 | 1.9 TWh |
| Riverside County, CA | # 4 | 159 | 14.7 TWh |
| Sacramento County, CA | # 10 | 65 | 6.4 TWh |
| San Benito County, CA | # 42 | 6 | 302.7 GWh |
| San Bernardino County, CA | # 6 | 204 | 12.8 TWh |
| San Diego County, CA | # 12 | 151 | 5.1 TWh |
| San Francisco County, CA | # 48 | 10 | 84.0 GWh |
| San Joaquin County, CA | # 23 | 47 | 2.2 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.7 TWh |
| San Mateo County, CA | # 47 | 11 | 133.1 GWh |
| Santa Barbara County, CA | # 41 | 18 | 331.1 GWh |
| Santa Clara County, CA | # 14 | 75 | 4.1 TWh |
| Santa Cruz County, CA | # 49 | 6 | 60.5 GWh |
| Shasta County, CA | # 8 | 46 | 7.7 TWh |
| Sierra County, CA | # 52 | 3 | 33.2 GWh |
| Siskiyou County, CA | # 44 | 8 | 236.7 GWh |
| Solano County, CA | # 16 | 40 | 3.2 TWh |
| Sonoma County, CA | # 11 | 26 | 5.2 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.8 TWh |
| Sutter County, CA | # 26 | 8 | 1.8 TWh |
| Tehama County, CA | # 50 | 7 | 59.7 GWh |
| Trinity County, CA | # 36 | 5 | 569.3 GWh |
| Tulare County, CA | # 28 | 69 | 1.5 TWh |
| Tuolumne County, CA | # 21 | 23 | 2.7 TWh |
| Ventura County, CA | # 34 | 32 | 756.5 GWh |
| Yolo County, CA | # 46 | 15 | 216.2 GWh |
| Yuba County, CA | # 27 | 5 | 1.6 TWh |