Blythe Solar IV, LLC
4000 Dracker Drive, Blythe, CA 92225Plant Summary Information
Blythe Solar IV, LLC is ranked #56 out of 849 solar farms in California in terms of total annual net electricity generation.
Blythe Solar IV, LLC generated 105.1 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Blythe Solar IV, LLC |
|---|---|
| Utility Name | Blythe Solar IV, LLC |
| Location | Riverside County, CA |
| Initial Operation Date | November 2020 |
| Last Update | Sep 2025 |
| Annual Generation | 339.0 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,810 out of 12,539 Power Plants Nationwide | |
| Ranked #207 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #146 out of 1,600 California Power Plants | |
| Ranked #56 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Blythe Solar IV, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Blythe Solar IV, LLC.
Monthly Net Generation for Blythe Solar IV, LLC
Blythe Solar IV, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Blythe Solar IV, LLC (60095) |
| Plant Address | 4000 Dracker Drive, Blythe, CA 92225 |
| Utility | Blythe Solar IV, LLC (59845) |
| Latitude, Longitude | 33.682, -114.768 |
| Generation Dates on File | Jul 2020 to Sep 2025 |
| Initial Operation Date | November 2020 |
| Annual Generation | 339.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 220.00 kV |
| Energy Storage | Yes |
Generator BLS4A Details Operating November 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 68.7 MW |
| Summer Capacity | 68.7 MW |
| Winter Capacity | 68.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 77 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator BLS4B Details Operating November 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 68.7 MW |
| Summer Capacity | 68.7 MW |
| Winter Capacity | 68.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 77 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator BLST4 Details Operating October 2022
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 47 MW |
| Summer Capacity | 47 MW |
| Winter Capacity | 47 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | October 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 47 |
|---|---|
| Maximum Charge Rate | 4.2 MW |
| Maximum Discharge Rate | 11.7 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 41.3 |
| Storage Enclosure Type | CS |
| Frequency Regulation | P |
| Load Management | Yes |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | No |
| Support T D Asset | No |
Blythe Solar IV, LLC Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #197 | Huck Finn Renewable Energy Center | Vandalia, MO | 357.9 GWh |
| #198 | Copper Mountain Solar 2 | Boulder City, NV | 356.1 GWh |
| #199 | Buckthorn Westex | Ft. Stockton, TX | 355.9 GWh |
| #200 | Aragorn Solar Project | Van Horn, TX | 353.9 GWh |
| #201 | Centinela Solar Energy | Calexico, CA | 352.7 GWh |
| #202 | Newport Solar Project | Newport, AR | 352.7 GWh |
| #203 | Blythe Solar II, LLC | Blythe, CA | 337.2 GWh |
| #204 | Ganado Solar | Gail, TX | 343.8 GWh |
| #205 | Edwards Sanborn E1A | Mojave, CA | 333.4 GWh |
| #206 | Impact Solar 1 | Deport, TX | 348.0 GWh |
| #208 | Estonian Solar Project, LLC | Cooper, TX | 339.2 GWh |
| #209 | Box Canyon (AZ) | Florence, AZ | 344.8 GWh |
| #210 | Midway Solar - TX | Fort Stockton, TX | 343.6 GWh |
| #211 | Fifth Standard Solar PV, LLC (Hybrid) | Huron, CA | 317.9 GWh |
| #212 | Arlington Energy Center III | Blythe, CA | 321.0 GWh |
| #213 | Arlington Valley Solar Energy II | Arlington, AZ | 341.2 GWh |
| #214 | Calhoun Solar | Battle Creek, MI | 337.3 GWh |
| #215 | Maverick Solar 7, LLC | Desert Center, CA | 336.8 GWh |
| #216 | American Kings Solar, LLC | Lemoore, CA | 334.0 GWh |
| #217 | Agave | Arlington, AZ | 333.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Blythe Solar IV, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arica Solar | Desert Center, CA | 719.0 GWh | 31.5 mi |
| Arlington Energy Center II | Blythe, CA | 633.4 GWh | 0.7 mi |
| Arlington Energy Center III | Blythe, CA | 321.0 GWh | 0.7 mi |
| Blythe Energy Inc | Blythe, CA | 371.8 GWh | 6.6 mi |
| Blythe Mesa Solar II | Blythe, CA | 584.4 GWh | 5.8 mi |
| Blythe Solar 110, LLC | Blythe, CA | 580.5 GWh | 1.5 mi |
| Blythe Solar II, LLC | Blythe, CA | 337.2 GWh | 2.2 mi |
| Blythe Solar III, LLC Hybrid | Blythe, CA | 353.7 GWh | 2.3 mi |
| Chuckawalla Solar | Blythe, CA | 7.1 GWh | 11.7 mi |
| Chuckawalla Valley State Prison | Blythe, CA | 1.4 GWh | 11.2 mi |
| Desert Quartzite | Blythe, CA | 755.5 GWh | 8.1 mi |
| Genesis Solar Energy Project | Blythe, CA | 623.0 GWh | 13.3 mi |
| Ironwood Solar LLC | Blythe, CA | 7.5 GWh | 11.8 mi |
| McCoy Solar Energy Project Hybrid | Blythe, CA | 646.7 GWh | 1.8 mi |
| Palo Verde College | Blythe, CA | 2.0 GWh | 6.8 mi |
| Solar Blythe 2 | Blythe, CA | 38.1 GWh | 6 mi |
| Solar Blythe LLC | Blythe, CA | 41.8 GWh | 6.4 mi |
| SunEdison Ironwood State Prison | Blythe, CA | 996.0 MWh | 11.7 mi |
| Venable Solar 1 | Blythe, CA | 3.4 GWh | 12.7 mi |
| Venable Solar 2 | Blythe, CA | 3.4 GWh | 12.7 mi |