Blythe Solar IV, LLC
4000 Dracker Drive, Blythe, CA 92225Plant Summary Information
Blythe Solar IV, LLC is ranked #59 out of 917 solar farms in California in terms of total annual net electricity generation.
Blythe Solar IV, LLC generated 103.8 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Blythe Solar IV, LLC |
|---|---|
| Utility Name | Blythe Solar IV, LLC |
| Location | Riverside County, CA |
| Initial Operation Date | November 2020 |
| Last Update | Aug 2026 |
| Annual Generation | 330.2 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,927 out of 13,301 Power Plants Nationwide | |
| Ranked #273 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #152 out of 1,641 California Power Plants | |
| Ranked #59 out of 917 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Blythe Solar IV, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Blythe Solar IV, LLC.
Monthly Net Generation for Blythe Solar IV, LLC
Monthly Plant Fuel Consumption for Blythe Solar IV, LLC
Blythe Solar IV, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Blythe Solar IV, LLC (60095) |
| Plant Address | 4000 Dracker Drive, Blythe, CA 92225 |
| Utility | Blythe Solar IV, LLC (59845) |
| Latitude, Longitude | 33.682, -114.768 |
| Generation Dates on File | Jul 2020 to Aug 2026 |
| Initial Operation Date | November 2020 |
| Annual Generation | 330.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 220.00 kV |
| Energy Storage | Yes |
Generator BLS4A Details Operating November 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 68.7 MW |
| Summer Capacity | 68.7 MW |
| Winter Capacity | 68.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 77 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator BLS4B Details Operating November 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 68.7 MW |
| Summer Capacity | 68.7 MW |
| Winter Capacity | 68.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 77 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator BLST4 Details Operating October 2022
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 47 MW |
| Summer Capacity | 47 MW |
| Winter Capacity | 47 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | October 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 47 |
|---|---|
| Maximum Charge Rate | 4.2 MW |
| Maximum Discharge Rate | 11.7 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 41.3 |
| Storage Enclosure Type | CS |
| Frequency Regulation | P |
| Load Management | Yes |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | No |
| Support T D Asset | No |
Blythe Solar IV, LLC Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #263 | Calhoun Solar | Battle Creek, MI | 354.6 GWh |
| #264 | Castle Gap Solar Hybrid | McCarney, TX | 352.0 GWh |
| #265 | Newport Solar Project | Newport, AR | 351.6 GWh |
| #266 | Arlington Energy Center III | Blythe, CA | 329.2 GWh |
| #267 | Aragorn Solar Project | Van Horn, TX | 349.3 GWh |
| #268 | Hardy Hills Solar Energy LLC | Frankfort, IN | 347.8 GWh |
| #269 | North Rosamond Solar LLC | Rosamond, CA | 346.7 GWh |
| #270 | Zier Solar | Brackettville, TX | 341.0 GWh |
| #271 | Camilla Solar Energy Project | Camilla, GA | 345.9 GWh |
| #272 | Quitman Solar | Quitman, GA | 344.7 GWh |
| #274 | Blythe Solar II, LLC | Blythe, CA | 326.0 GWh |
| #275 | Ganado Solar | Gail, TX | 332.5 GWh |
| #276 | Daybreak Solar | Maupin, OR | 339.6 GWh |
| #277 | Edwards Sanborn 1C | Mojave, CA | 339.3 GWh |
| #278 | Elora Solar | Elora, TN | 337.8 GWh |
| #279 | Cattlemen Solar II | Rosebud, TX | 337.3 GWh |
| #280 | Arlington Valley Solar Energy II | Arlington, AZ | 336.0 GWh |
| #281 | Edwards Sanborn E4 | Mojave, CA | 329.4 GWh |
| #282 | Washington County Solar | Sandersville, GA | 332.3 GWh |
| #283 | Cove Mountain Solar 2 | Beryl, UT | 332.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Blythe Solar IV, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arlington Energy Center II | Blythe, CA | 624.2 GWh | 0.7 mi |
| Arlington Energy Center III | Blythe, CA | 329.2 GWh | 0.7 mi |
| Blythe Energy Inc | Blythe, CA | 497.7 GWh | 6.6 mi |
| Blythe Mesa Solar II | Blythe, CA | 568.6 GWh | 5.8 mi |
| Blythe Solar 110, LLC | Blythe, CA | 283.6 GWh | 1.5 mi |
| Blythe Solar II, LLC | Blythe, CA | 326.0 GWh | 2.2 mi |
| Blythe Solar III, LLC Hybrid | Blythe, CA | 342.0 GWh | 2.3 mi |
| Chuckawalla Solar | Blythe, CA | 7.3 GWh | 11.7 mi |
| Chuckawalla Valley State Prison | Blythe, CA | 502.0 MWh | 11.2 mi |
| Desert Quartzite | Blythe, CA | 842.3 GWh | 8.1 mi |
| Genesis Solar Energy Project | Blythe, CA | 581.1 GWh | 13.3 mi |
| Ironwood Solar LLC | Blythe, CA | 7.3 GWh | 11.8 mi |
| McCoy Solar Energy Project Hybrid | Blythe, CA | 638.7 GWh | 1.8 mi |
| Palo Verde College | Blythe, CA | 1.8 GWh | 6.8 mi |
| Solar Blythe 2 | Blythe, CA | 40.7 GWh | 6 mi |
| Solar Blythe LLC | Blythe, CA | 38.8 GWh | 6.4 mi |
| SunEdison Ironwood State Prison | Blythe, CA | 1.4 GWh | 11.7 mi |
| Venable Solar 1 | Blythe, CA | 3.7 GWh | 12.7 mi |
| Venable Solar 2 | Blythe, CA | 3.4 GWh | 12.7 mi |
| Victory Pass | Desert Center, CA | 561.4 GWh | 31.5 mi |