Cuyama Solar, LLC
596 Kirschenmann Rd, Cuyama, CA 93252Plant Summary Information
Cuyama Solar, LLC is ranked #145 out of 885 solar farms in California in terms of total annual net electricity generation.
Cuyama Solar, LLC generated 9.3 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Cuyama Solar, LLC |
|---|---|
| Utility Name | Cuyama Solar, LLC |
| Location | Santa Barbara County, CA |
| Initial Operation Date | November 2017 |
| Last Update | May 2026 |
| Annual Generation | 59.3 GWh |
| Annual Consumption | 226.7 k MMBtu |
| Ranked #3,992 out of 13,081 Power Plants Nationwide | |
| Ranked #1,051 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #418 out of 1,606 California Power Plants | |
| Ranked #145 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
First Solar Asset Management (2015 to 2016) Cuyama Solar, LLC (2017 to 2025) |
Map of Cuyama Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cuyama Solar, LLC.
Monthly Net Generation for Cuyama Solar, LLC
Monthly Plant Fuel Consumption for Cuyama Solar, LLC
Cuyama Solar, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Cuyama Solar, LLC (60043) |
| Plant Address | 596 Kirschenmann Rd, Cuyama, CA 93252 |
| Utility | Cuyama Solar, LLC (61112) |
| Latitude, Longitude | 34.901, -119.596 |
| Generation Dates on File | Nov 2017 to May 2026 |
| Initial Operation Date | November 2017 |
| Annual Generation | 59.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
| Grid Voltage | 70.00 kV |
| Energy Storage | No |
Generator GEN01 Details Operating November 2017
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 40 MW |
| Summer Capacity | 40 MW |
| Winter Capacity | 40 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2017 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| DC Net Capacity | 56.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Cuyama Solar, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1041 | Edwards Sanborn E3 | Mojave, CA | 58.4 GWh |
| #1042 | Cherry Valley PV I | Cherry Valley, AR | 60.9 GWh |
| #1043 | Innovative Solar 67 | Willard, NC | 60.8 GWh |
| #1044 | Citizens Imperial Solar | Calipatria, CA | 60.6 GWh |
| #1045 | Gulf Coast Solar Center I | Valparaiso, FL | 60.4 GWh |
| #1046 | Sycamore Creek Solar, LLC | New Washington, OH | 60.4 GWh |
| #1047 | Mission Road Solar Park | Rosebush, MI | 60.4 GWh |
| #1048 | Cimarron Solar Facility | Springer, NM | 60.3 GWh |
| #1049 | Swamp Cabbage | LaBelle, FL | 60.2 GWh |
| #1050 | Mechanicsville Solar | Mechanicsville, VA | 59.9 GWh |
| #1052 | Adelanto Solar, LLC | Adelanto, CA | 59.3 GWh |
| #1053 | Lost Hills/Blackwell | Lost Hills, CA | 58.9 GWh |
| #1054 | AES Waikoloa Solar Hybrid | Waikoloa Village, HI | 57.6 GWh |
| #1055 | RB Inyokern Solar WDAT 1203 (CSG) | Ridgecrest, CA | 58.3 GWh |
| #1056 | Bison Solar LLC | Wellington, CO | 58.1 GWh |
| #1057 | Boot Hill Solar | Dodge City, KS | 58.0 GWh |
| #1058 | P66 Rodeo Solar | Rodeo, CA | 58.0 GWh |
| #1059 | TA-High Desert LLC | Lancaster, CA | 57.9 GWh |
| #1060 | Prairie Creek Solar | Jacksonville, IL | 57.8 GWh |
| #1061 | Pinal Central Energy Center Hybrid | Casa Grande, AZ | 55.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cuyama Solar, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Algonquin SKIC 10 Solar, LLC | Taft, CA | 15.5 GWh | 25.3 mi |
| Algonquin SKIC20 Solar LLC | Taft, CA | 40.5 GWh | 25.3 mi |
| Berry Cogen | Taft, CA | 9.5 GWh | 15.8 mi |
| Berry Cogen Tanne Hills 18 | Maricopa, CA | 138.7 GWh | 15.7 mi |
| Berry NMW Cogens | Bakersfield, CA | 75.7 GWh | 28.1 mi |
| Cawelo Water District Solar | Famoso, CA | 6.7 GWh | 25.6 mi |
| Chalk Cliff Limited | Bakersfield, CA | 3.0 GWh | 16.5 mi |
| Dome Project | Fellows, CA | 48.4 GWh | 22.1 mi |
| Eagle Creek | Taft, CA | 7.6 GWh | 24.4 mi |
| Elk Hills Power LLC | Tupman, CA | 2.8 TWh | 27.1 mi |
| La Paloma Generating Plant | McKittrick, CA | 1.2 TWh | 27.3 mi |
| Maricopa West Solar PV, LLC | Taft, CA | 50.3 GWh | 21.6 mi |
| Midway Sunset Cogen | Fellows, CA | 6.0 GWh | 22.6 mi |
| Northern Orchard Solar PV, LLC | Taft, CA | 366.4 GWh | 23.5 mi |
| Pumpjack Solar I | McKittrick, CA | 50.6 GWh | 28 mi |
| SEPV Cuyama Hybrid | New Cuyama, CA | 3.3 GWh | 0.7 mi |
| Sunrise Power LLC | Fellows, CA | 2.1 TWh | 21.3 mi |
| Taft 26C Cogen | Taft, CA | 43.2 GWh | 16.3 mi |
| Vulcan San Emidio Solar | Bakersfield, CA | 3.8 GWh | 25.6 mi |
| Wheeler Ridge | Bakersfield, CA | 12.6 GWh | 20.2 mi |