Park Meridian #1
15001 Meridian Parkway, Riverside, CA 92518Plant Summary Information
Park Meridian #1 is ranked #645 out of 885 solar farms in California in terms of total annual net electricity generation.
Park Meridian #1 generated 461.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Park Meridian #1 |
|---|---|
| Utility Name | Altus Power America Management, LLC |
| Location | Riverside County, CA |
| Initial Operation Date | March 2015 |
| Last Update | Dec 2025 |
| Annual Generation | 2.6 GWh |
| Annual Consumption | 9.3 k MMBtu |
| Ranked #10,248 out of 13,081 Power Plants Nationwide | |
| Ranked #5,202 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #1,312 out of 1,606 California Power Plants | |
| Ranked #645 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Kona Solar, LLC (2014 to 2021) Altus Power America Management, LLC (2022 to 2025) |
Map of Park Meridian #1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Park Meridian #1.
Monthly Net Generation for Park Meridian #1
Monthly Plant Fuel Consumption for Park Meridian #1
Park Meridian #1 Details
| Summary Information | |
|---|---|
| Plant Name | Park Meridian #1 (59539) |
| Plant Address | 15001 Meridian Parkway, Riverside, CA 92518 |
| Utility | Altus Power America Management, LLC (60281) |
| Latitude, Longitude | 33.89611, -117.28361 |
| Generation Dates on File | Mar 2015 to Dec 2025 |
| Initial Operation Date | March 2015 |
| Annual Generation | 2.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 14-695-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 0.48 kV |
| Energy Storage | No |
Generator 1 Details Operating March 2015
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2015 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 11 |
| DC Net Capacity | 1.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Park Meridian #1 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5192 | Spruce - WCMD - Resh I | Hagerstown, MD | 2.6 GWh |
| #5193 | Denison Solar Array | Granville, OH | 2.6 GWh |
| #5194 | Chattanooga Metropolitan Airport Solar | Chattanooga, TN | 2.6 GWh |
| #5195 | Thunderhead | Asheboro, NC | 2.6 GWh |
| #5196 | Old Caroleen Solar Farm | Forest City, NC | 2.6 GWh |
| #5197 | Broadway 3 - UCSB Lot 38 | Santa Barbara, CA | 2.6 GWh |
| #5198 | Tuttle | Tuttle, OK | 2.6 GWh |
| #5199 | Santa Fe Springs Rooftop Solar BLDG M | Santa Fe Springs, CA | 2.6 GWh |
| #5200 | WMATA - Naylor Rd. Metro | Temple Hills, MD | 2.6 GWh |
| #5201 | EAFB - North Base | Edwards Air Force Bas, CA | 2.6 GWh |
| #5203 | Walton 2 Solar Facility | Walton, KY | 2.6 GWh |
| #5204 | Pearl II | Batavia, NY | 2.6 GWh |
| #5205 | CCBC-Catonsville | Catonsville, MD | 2.6 GWh |
| #5206 | UMES (MD) - Princess Anne | Princess Anne, MD | 2.6 GWh |
| #5207 | Google Moffett Park Solar Project | Sunnyvale, CA | 2.5 GWh |
| #5208 | Acushnet-Braley Road 1 | Freetown, MA | 2.6 GWh |
| #5209 | Windsor Floating Solar | Windsor, CA | 2.6 GWh |
| #5210 | Jefferson-Lewis BOCES Solar | Watertown, NY | 2.6 GWh |
| #5211 | Clif Bar Bakery of Twin Falls | Twin Falls, ID | 2.6 GWh |
| #5212 | East Chicago | East Chicago, IN | 2.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Park Meridian #1.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Agua Mansa Power Plant | Colton, CA | 3.8 GWh | 11 mi |
| Broadway 2 - UC Riverside | Riverside, CA | 3.9 GWh | 5.8 mi |
| Century Generating Facility | Colton, CA | 563.0 MWh | 12 mi |
| Colton Solar Two, LLC | Colton, CA | 789.0 MWh | 11 mi |
| Drews Generating Facility | Colton, CA | 570.0 MWh | 12.1 mi |
| EMWD - Moreno Valley RWRF | Moreno Valley, CA | 5.1 GWh | 4.4 mi |
| EMWD - Perris Valley RWRF | Perris, CA | 8.2 GWh | 10.9 mi |
| ESCA-LL-COLTON, LLC | Colton, CA | 4.0 GWh | 10.8 mi |
| IGS SBD1 | Bloomington, CA | 4.9 GWh | 11.4 mi |
| IGS SBD2 | San Bernardino, CA | 4.9 GWh | 12.3 mi |
| Lake Mathews | Riverside, CA | 5.8 GWh | 10.2 mi |
| Loma Linda University Cogen | Loma Linda, CA | 59.9 GWh | 10.8 mi |
| Redlands Community Hospital | Redlands, CA | 8.6 GWh | 10.7 mi |
| Riverside Energy Resource Center | Riverside, CA | 16.8 GWh | 10.8 mi |
| Riverside RWQCP Fuel Cell | Riverside, CA | 8.5 GWh | 10.9 mi |
| Springs Generating Station | Riverside, CA | 878.0 MWh | 2.5 mi |
| SSI West Riverside Landfill LLC | Riverside, CA | 4.1 GWh | 7.9 mi |
| SunEdison Walgreens Moreno Valley | Moreno Valley, CA | 599.0 MWh | 3.7 mi |
| Tequesquite Landfill Solar PV Project | Riverside, CA | 10.8 GWh | 8.1 mi |
| UC Riverside Lots 30 & 32 | Riverside, CA | 6.8 GWh | 5.8 mi |