Western Antelope Blue Sky B
Avenue G, Lancaster, CA 93536Plant Summary Information
Western Antelope Blue Sky B is ranked #168 out of 885 solar farms in California in terms of total annual net electricity generation.
Western Antelope Blue Sky B generated 9.0 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Western Antelope Blue Sky B |
|---|---|
| Utility Name | AES Distributed Energy |
| Location | Los Angeles County, CA |
| Initial Operation Date | December 2016 |
| Last Update | Dec 2025 |
| Annual Generation | 52.2 GWh |
| Annual Consumption | 187.1 k MMBtu |
| Ranked #4,156 out of 13,081 Power Plants Nationwide | |
| Ranked #1,102 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #449 out of 1,606 California Power Plants | |
| Ranked #168 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Sustainable Power Group, LLC (2014 to 2020) AES Distributed Energy (2021 to 2025) |
Map of Western Antelope Blue Sky B
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Western Antelope Blue Sky B.
Monthly Net Generation for Western Antelope Blue Sky B
Monthly Plant Fuel Consumption for Western Antelope Blue Sky B
Western Antelope Blue Sky B Details
| Summary Information | |
|---|---|
| Plant Name | Western Antelope Blue Sky B (59961) |
| Plant Address | Avenue G, Lancaster, CA 93536 |
| Utility | AES Distributed Energy (61012) |
| Latitude, Longitude | 34.73206, -118.31357 |
| Generation Dates on File | Dec 2016 to Dec 2025 |
| Initial Operation Date | December 2016 |
| Annual Generation | 52.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 220.00 kV |
| Energy Storage | No |
Generator WABSB Details Operating December 2016
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 20 MW |
| Summer Capacity | 19 MW |
| Winter Capacity | 19 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2016 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| DC Net Capacity | 25.9 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Western Antelope Blue Sky B Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Western Antelope Blue Sky Ranch B | 2180 South 1300 East Ste 600, Salt Lake City, UT 84106 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1092 | Axium Modesto Solar | Modesto, CA | 53.2 GWh |
| #1093 | Techren Solar III LLC | Boulder, NV | 53.2 GWh |
| #1094 | Lone Valley Solar Park II LLC | Lucerne Valley, CA | 53.1 GWh |
| #1095 | East Nash PV2 | Spring Hope, NC | 53.0 GWh |
| #1096 | Barilla Solar | Fort Stockton, TX | 52.9 GWh |
| #1097 | Innovative Solar 31 | Bladenboro, NC | 52.9 GWh |
| #1098 | Solar Oasis LLC | Palmdale, CA | 52.7 GWh |
| #1099 | Portal Ridge Solar B, LLC | Lancaster, CA | 52.7 GWh |
| #1100 | SEPV Mojave West | Mojave, CA | 52.7 GWh |
| #1101 | CED Ducor 1 | Ducor, CA | 52.3 GWh |
| #1103 | Innovative Solar 47 | Maxton, NC | 52.2 GWh |
| #1104 | Rio Bravo Solar 1 LLC | McKittrick, CA | 52.1 GWh |
| #1105 | Mountain View Solar | North Las Vegas, NV | 52.1 GWh |
| #1106 | Atwell Island West Solar | Alpaugh, CA | 51.9 GWh |
| #1107 | CED Ducor 4 | Ducor, CA | 51.8 GWh |
| #1108 | Rio Bravo Solar II LLC | McKittrick, CA | 51.7 GWh |
| #1109 | CED Ducor 2 | Ducor, CA | 51.6 GWh |
| #1110 | Fort Gordon Solar Facility | Fort Gordon, GA | 51.4 GWh |
| #1111 | Cascade Solar | Joshua Tree, CA | 51.4 GWh |
| #1112 | RE Rosamond One LLC | Rosamond, CA | 51.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Western Antelope Blue Sky B.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Antelope DSR 3 | Lancaster, CA | 55.1 GWh | 0.6 mi |
| Antelope Expansion 2 | Lancaster, CA | 234.0 GWh | 0.9 mi |
| Antelope Expansion 3A | Lancaster, CA | 40.2 GWh | 0.5 mi |
| Antelope Expansion 3B | Lancaster, CA | 12.6 GWh | 1 mi |
| Central Antelope Dry Ranch B LLC | Lancaster, CA | 6.0 GWh | 2 mi |
| Central Antelope Dry Ranch C | Lancaster, CA | 38.9 GWh | 1.1 mi |
| Elevation Solar C | Lancaster, CA | 107.1 GWh | 0.5 mi |
| Lancaster Dry Farm Ranch B | Lancaster, CA | 10.0 GWh | 1.7 mi |
| North Lancaster Ranch | Lancaster, CA | 38.6 GWh | 0.9 mi |
| Portal Ridge Solar B, LLC | Lancaster, CA | 52.7 GWh | 2.1 mi |
| Rodeo Solar C2 | Lancaster, CA | 3.6 GWh | 1.9 mi |
| Rodeo Solar D2 | Lancaster, CA | 3.5 GWh | 1.9 mi |
| San Pablo Raceway | Lancaster, CA | 214.9 GWh | 2 mi |
| Summer North Solar | Lancaster, CA | 13.1 GWh | 1.5 mi |
| Summer Solar A2 | Lancaster, CA | 2.7 GWh | 1.5 mi |
| Summer Solar B2 | Lancaster, CA | 3.1 GWh | 1.5 mi |
| Summer Solar C2 | Lancaster, CA | 3.3 GWh | 1.5 mi |
| Summer Solar D2 | Lancaster, CA | 2.0 GWh | 1.5 mi |
| Summer Solar LLC | Lancaster, CA | 55.9 GWh | 1.2 mi |
| TA-High Desert LLC | Lancaster, CA | 57.9 GWh | 1.7 mi |