Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Nobles 2 Wind Project | Nobles 2 Power Partners, LLC | Wilmont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 951.6 GWh | Nov 2020 | May 2026 | Wind |
| USS DVL Solar CSG | Standard Solar | Waconia, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Jul 2019 | Dec 2025 | Solar |
| USS Eggo Solar CSG | Standard Solar | Cologne, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | May 2019 | Dec 2025 | Solar |
| USS King 2 CSG | Standard Solar | Waconia, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Jul 2019 | Dec 2025 | Solar |
| CED Champaign Solar LLC | RWE Clean Energy | Champaign, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Jun 2020 | Dec 2025 | Solar |
| Montevideo Solar LLC, CSG | Montevideo Solar LLC | Montevideo, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.7 GWh | Dec 2018 | Dec 2025 | Solar |
| IKEA Canton Rooftop PV System | IKEA Property Inc | Canton, MI | Midcontinent Independent System Operator, Inc. (MISO) | 264.0 MWh | Oct 2015 | Dec 2025 | Solar |
| John A Logan College Solar | REA Investments, LLC | Carterville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Nov 2019 | Dec 2025 | Solar |
| Epic Verona | Epic Hosting, LLC | Verona, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | May 2009 | Dec 2025 | Solar : 90.8% Distillate Fuel Oil : 9.2% |
| Staunton | Cypress Creek Renewables | Brazil, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 GWh | Nov 2018 | Dec 2025 | Solar |
| Crawfordsville 3 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 7.9 GWh | Nov 2019 | Dec 2025 | Solar |
| USS Kost Trail Solar CSG | Standard Solar | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | May 2019 | Dec 2025 | Solar |
| USS Lake Patterson Solar CSG | Standard Solar | Cologne, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Jul 2019 | Dec 2025 | Solar |
| USS Webster Solar CSG | Standard Solar | Webster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Apr 2019 | Dec 2025 | Solar |
| USS Centerfield Solar CSG | Standard Solar | Webster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Oct 2019 | Dec 2025 | Solar |
| Crawfordsville 2 Solar Park | Indiana Municipal Power Agency | Crawfordsville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.3 GWh | Nov 2019 | Dec 2025 | Solar |
| Syncarpha Prinsburg CSG (Ledeboer) | Prinsburg CSG I, LLC | Prinsburg, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2018 | Dec 2025 | Solar |
| Farmers Electric Cooperative - Kalona | Farmers Electric Coop - (IA) | Kalona, IA | Midcontinent Independent System Operator, Inc. (MISO) | 174.0 MWh | Feb 2001 | Dec 2025 | Distillate Fuel Oil |
| Ivester Wind Farm | MidAmerican Energy Co | Wellsburg, IA | Midcontinent Independent System Operator, Inc. (MISO) | 323.0 GWh | Nov 2018 | May 2026 | Wind |
| Pegasus Wind | Pegasus Wind, LLC | Reese, MI | Midcontinent Independent System Operator, Inc. (MISO) | 378.4 GWh | Nov 2019 | May 2026 | Wind |
| Frontenac Holdco LLC, CSG | Frontenac Holdco LLC | Frontenac, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.3 GWh | Feb 2019 | Dec 2025 | Solar |
| Rantoul Solar | Altorfer Inc. | Rantoul, IL | Midcontinent Independent System Operator, Inc. (MISO) | 5.0 MWh | Nov 2016 | Dec 2025 | Solar |
| High Prairie Wind Farm | Union Electric Co - (MO) | Queen City, MO | Midcontinent Independent System Operator, Inc. (MISO) | 824.3 GWh | Nov 2020 | May 2026 | Wind |
| Wright Kirby 1-5 CSG | Standard Solar | Monticello, MN | Midcontinent Independent System Operator, Inc. (MISO) | 11.9 GWh | May 2019 | Dec 2025 | Solar |
| Cedar Falls Solar Farm | Altus Power America Management, LLC | Cedar Falls, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Mar 2016 | Dec 2025 | Solar |
| Lake Region Community Hybrid, LLC | Lake Region Community Hybrid, LLC | Rothsay, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.5 GWh | Nov 2018 | Dec 2025 | Wind : 95.0% Solar : 5.0% |
| Delta Solar Power I | Delta Solar Power I, LLC | Grand Ledge, MI | Midcontinent Independent System Operator, Inc. (MISO) | 13.1 GWh | May 2018 | Dec 2025 | Solar |
| Becker Solar CSG | SunShare Management | St. Michael, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Feb 2019 | Dec 2025 | Solar |
| Tipton Solar Park | Indiana Municipal Power Agency | Tipton, IN | Midcontinent Independent System Operator, Inc. (MISO) | 8.7 GWh | Jun 2019 | Dec 2025 | Solar |
| Chisago Holdco LLC, CSG | Chisago Holdco LLC | Center City, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.5 GWh | Apr 2019 | Dec 2025 | Solar |
| Corcoran CSG | Altus Power America Management, LLC | Corcoran, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 GWh | Dec 2018 | Dec 2025 | Solar |
| Cornillie | Terraform Arcadia | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Jul 2018 | Dec 2025 | Solar |
| Beloit Memorial Hospital Power Plant | Beloit Memorial Hospital | Beloit, WI | Midcontinent Independent System Operator, Inc. (MISO) | 147.0 MWh | May 2000 | Dec 2025 | Natural Gas : 99.1% Distillate Fuel Oil : 0.9% |
| Becker Solar 2 CSG | SunShare Management | St. Michael, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Feb 2019 | Dec 2025 | Solar |
| Becker Solar 3 CSG | SunShare Management | St. Michael, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Feb 2019 | Dec 2025 | Solar |
| Becker Solar 4 CSG | SunShare Management | St. Michael, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Feb 2019 | Dec 2025 | Solar |
| Becker Solar 5 CSG | SunShare Management | St. Michael, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Feb 2019 | Dec 2025 | Solar |
| Schultz CSG | Madison Energy Investments LLC | Webster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.1 GWh | Oct 2018 | Sep 2025 | Solar |
| Birch | Birch Power LLC | Clearfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 6.6 GWh | Jan 2017 | Dec 2025 | Wind |
| Bloomfield Municipal Utilities Solar | Onsite Partners, LLC | Bloomfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Mar 2019 | Dec 2024 | Solar |
| Tiller CSG | Madison Energy Investments LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.7 GWh | Nov 2018 | Sep 2025 | Solar |
| Hammer CSG | Madison Energy Investments LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.7 GWh | Nov 2018 | Sep 2025 | Solar |
| Kossuth | Wisconsin Power & Light Co | Lu Verne, IA | Midcontinent Independent System Operator, Inc. (MISO) | 539.2 GWh | Sep 2020 | May 2026 | Wind |
| Monticello Project CSG | Madison Energy Investments LLC | Monticello, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.2 GWh | Oct 2018 | Sep 2025 | Solar |
| 4710 Hosting | Epic Hosting, LLC | Rochester, MN | Midcontinent Independent System Operator, Inc. (MISO) | 63.0 MWh | May 2012 | Dec 2025 | Distillate Fuel Oil |
| Galactic Wind | Galactic Wind | Waunakee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 21.2 GWh | Nov 2012 | Dec 2025 | Wind |
| MSC-Chisago02 LLC | MSC-Chisago02 LLC | Taylors Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 954.0 MWh | Jul 2019 | Dec 2025 | Solar |
| Blue Water Energy Center | DTE Electric Company | East China, MI | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 TWh | May 2022 | May 2026 | Natural Gas |
| Searcy Solar Hybrid | Searcy Solar, LLC | Searcy, AR | Midcontinent Independent System Operator, Inc. (MISO) | 178.0 GWh | Dec 2021 | May 2026 | Solar |
| MSC-Rice01 LLC CSG | MSC-Rice01 LLC | Morristown, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Jun 2019 | Dec 2025 | Solar |
| Goose Lake MN DPC-GM | ENGIE Generation North America LLC | Albert Lea, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | Jan 2019 | Dec 2025 | Solar |
| MSC-Chisago01 LLC CSG | MSC-Chisago01 LLC | Taylors Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Jun 2019 | Dec 2025 | Solar |
| MSC-Scott01 LLC | MSC-Scott01 LLC | Jordan, MN | Midcontinent Independent System Operator, Inc. (MISO) | 754.0 MWh | Jul 2019 | Dec 2025 | Solar |
| MSC-Scandia01 CSG | MSC-Scandia01 LLC | Scandia, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Mar 2019 | Dec 2024 | Solar |
| MSC-GreyCloud01 Community Solar | MSC-GreyCloud01 LLC | St. Paul Park, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Feb 2019 | Dec 2024 | Solar |
| Roseman | Roseman Energy, LLC | Anita, IA | Midcontinent Independent System Operator, Inc. (MISO) | 6.8 GWh | Jan 2017 | Dec 2025 | Wind |
| Arbor Hill Wind Farm | MidAmerican Energy Co | Greenfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.1 TWh | Nov 2018 | May 2026 | Wind |
| North English | MidAmerican Energy Co | Montezuma, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 TWh | Nov 2018 | May 2026 | Wind |
| Huneke II CSG | Terraform Arcadia | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Aug 2018 | Dec 2025 | Solar |
| Barone CSG | Terraform Arcadia | Winstead, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Sep 2018 | Dec 2025 | Solar |
| Eichtens II CSG | Terraform Arcadia | Winstead, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Aug 2018 | Dec 2025 | Solar |
| Emmons-Logan Wind, LLC | Emmons-Logan Wind, LLC | Linton, ND | Midcontinent Independent System Operator, Inc. (MISO) | 848.8 GWh | Nov 2019 | May 2026 | Wind |
| Nautilus Lindstrom Solar (CSG) | Nautilus Solar Solutions | Lindstrom, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Feb 2019 | May 2026 | Solar |
| Nautilus Saint Cloud Solar (CSG) | Nautilus Solar Solutions | Saint Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 GWh | Mar 2019 | May 2026 | Solar |
| Nautilus Winsted Solar (CSG) | Nautilus Solar Solutions | Winsted, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.3 GWh | Mar 2019 | May 2026 | Solar |
| Glaciers Edge Wind Project | EDF Renewable Asset Holdings, Inc. | Cleghorn, IA | Midcontinent Independent System Operator, Inc. (MISO) | 816.9 GWh | Nov 2019 | May 2026 | Wind |
| Sartell Holdco CSG | Sartell Holdco LLC | Sartell, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.3 GWh | Apr 2019 | Dec 2025 | Solar |
| Rollingstone Holdco CSG | Rollingstone Holdco LLC | Rollingstone, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.3 GWh | Jul 2019 | Dec 2025 | Solar |
| USS Solar Rapids CSG | United States Solar Corporation | Sauk Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Dec 2018 | Dec 2025 | Solar |
| USS Solar Dawn CSG | United States Solar Corporation | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Nov 2018 | Nov 2025 | Solar |
| USS Norelius Solar CSG | United States Solar Corporation | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Dec 2018 | Dec 2025 | Solar |
| USS Nillie Corn Solar CSG | United States Solar Corporation | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Nov 2018 | Dec 2025 | Solar |
| USS JJ Solar CSG | United States Solar Corporation | Sauk Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Dec 2018 | Dec 2025 | Solar |
| USS Dubhe Solar CSG | United States Solar Corporation | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Nov 2018 | Dec 2025 | Solar |
| USS Brockway Solar CSG | United States Solar Corporation | Sartell, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Dec 2018 | Dec 2025 | Solar |
| Lady Slipper Solar Array CSG | Onsite Partners, LLC | Red Wing, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.0 GWh | Sep 2019 | Dec 2025 | Solar |
| Gibbon Solar | Green Street Power Partners | Gibbon, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 GWh | May 2019 | Dec 2025 | Solar |
| Syncarpha Dodge 1 CSG | Solar Provider Group MN I LLC | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Apr 2019 | Dec 2025 | Solar |
| Felton CSG PV1-5 | Ecoplexus, Inc | Randolph, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.4 GWh | May 2019 | Dec 2025 | Solar |
| Randolph CSG PV1-5 | Ecoplexus, Inc | Randolph, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.9 GWh | May 2019 | Dec 2025 | Solar |
| Hampton MN GRE | SoCore Energy LLC | Hampton Township, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Sep 2018 | Sep 2025 | Solar |
| Anoka County MN CONX | SoCore Energy LLC | Ramsey, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.5 GWh | Sep 2018 | Dec 2025 | Solar |
| Athens MN CONX | SoCore Energy LLC | Athens, MN | Midcontinent Independent System Operator, Inc. (MISO) | 10.1 GWh | Nov 2018 | Dec 2025 | Solar |
| Whispering Willow North | Interstate Power and Light Co | Latimer, IA | Midcontinent Independent System Operator, Inc. (MISO) | 719.1 GWh | Dec 2019 | May 2026 | Wind |
| Richland (IA) | Interstate Power and Light Co | Odebolt, IA | Midcontinent Independent System Operator, Inc. (MISO) | 494.1 GWh | Aug 2020 | May 2026 | Wind |
| Golden Plains | Interstate Power and Light Co | Buffalo Center, IA | Midcontinent Independent System Operator, Inc. (MISO) | 782.4 GWh | Feb 2020 | May 2026 | Wind |
| Guse CSG | Terraform Arcadia | Janesville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Aug 2018 | Dec 2025 | Solar |
| Bolduan CSG | Terraform Arcadia | New Richland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Oct 2018 | Dec 2025 | Solar |
| Winegar CSG | Terraform Arcadia | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Sep 2018 | Dec 2025 | Solar |
| USS Haven Solar LLC CSG | Standard Solar | St. Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Oct 2019 | Dec 2025 | Solar |
| Lincoln Heights I | ALLETE Clean Energy | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.3 GWh | Apr 2006 | Dec 2025 | Wind |
| Arcadia Solar | Green Street Power Partners | Arcadia, WI | Midcontinent Independent System Operator, Inc. (MISO) | 7.2 GWh | Aug 2019 | Dec 2025 | Solar |
| Chicot Solar | Chicot Solar, LLC | Lake Village, AR | Midcontinent Independent System Operator, Inc. (MISO) | 213.2 GWh | Aug 2020 | May 2026 | Solar |
| Tippecanoe Solar Power Plant | Duke Energy Indiana, LLC | West Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Nov 2019 | Dec 2025 | Solar |
| USS Monarch Solar LLC CSG | Standard Solar | Brooten, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2019 | Dec 2025 | Solar |
| USS White Cloud LLC CSG | Standard Solar | St. Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Oct 2019 | Dec 2025 | Solar |
| USS Westeros Solar LLC CSG | Standard Solar | Belle Plaine, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | May 2020 | Dec 2025 | Solar |
| USS Sunrise Solar LLC CSG | Standard Solar | Taylors Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 GWh | May 2020 | Dec 2025 | Solar |
| USS Milkweed Solar LLC CSG | Standard Solar | Paynesville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | May 2020 | Dec 2025 | Solar |
| Delta Energy Park | Lansing Board of Water and Light | Lansing, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 TWh | Feb 2022 | May 2026 | Natural Gas |
Summary of Power Plants By State
Figures are based on May 2026 generation numbers.| State | Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Alabama | # 8 | 77 | 11,823.92 GWh |
| Alaska | # 48 | 140 | 513.29 GWh |
| Arizona | # 14 | 196 | 9,091.99 GWh |
| Arkansas | # 25 | 117 | 4,873.33 GWh |
| California | # 4 | 1,740 | 15,360.54 GWh |
| Colorado | # 31 | 308 | 4,156.36 GWh |
| Connecticut | # 35 | 173 | 3,391.33 GWh |
| Delaware | # 49 | 35 | 236.45 GWh |
| District of Columbia | # 51 | 17 | 14.46 GWh |
| Florida | # 2 | 342 | 25,093.89 GWh |
| Georgia | # 6 | 250 | 12,138.02 GWh |
| Hawaii | # 46 | 70 | 762.50 GWh |
| Idaho | # 41 | 151 | 1,963.84 GWh |
| Illinois | # 5 | 494 | 14,816.74 GWh |
| Indiana | # 15 | 222 | 7,662.28 GWh |
| Iowa | # 21 | 297 | 5,720.38 GWh |
| Kansas | # 24 | 188 | 5,118.39 GWh |
| Kentucky | # 23 | 61 | 5,471.28 GWh |
| Louisiana | # 13 | 90 | 9,131.60 GWh |
| Maine | # 44 | 242 | 1,130.78 GWh |
| Maryland | # 37 | 228 | 3,103.37 GWh |
| Massachusetts | # 45 | 666 | 1,073.93 GWh |
| Michigan | # 11 | 276 | 9,774.25 GWh |
| Minnesota | # 28 | 790 | 4,567.82 GWh |
| Mississippi | # 20 | 60 | 6,404.61 GWh |
| Missouri | # 22 | 129 | 5,701.36 GWh |
| State | Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,053.07 GWh |
| Nebraska | # 36 | 126 | 3,193.89 GWh |
| Nevada | # 33 | 117 | 3,848.29 GWh |
| New Hampshire | # 43 | 57 | 1,198.65 GWh |
| New Jersey | # 30 | 398 | 4,274.91 GWh |
| New Mexico | # 29 | 158 | 4,513.39 GWh |
| New York | # 10 | 1,064 | 10,643.78 GWh |
| North Carolina | # 9 | 913 | 11,481.42 GWh |
| North Dakota | # 34 | 59 | 3,601.34 GWh |
| Ohio | # 7 | 211 | 11,886.21 GWh |
| Oklahoma | # 17 | 144 | 7,547.66 GWh |
| Oregon | # 27 | 281 | 4,575.23 GWh |
| Pennsylvania | # 3 | 258 | 18,234.28 GWh |
| Rhode Island | # 47 | 107 | 580.94 GWh |
| South Carolina | # 16 | 209 | 7,632.32 GWh |
| South Dakota | # 42 | 53 | 1,802.78 GWh |
| Tennessee | # 19 | 99 | 6,454.94 GWh |
| Texas | # 1 | 1,019 | 50,690.02 GWh |
| Utah | # 39 | 128 | 2,809.26 GWh |
| Vermont | # 50 | 118 | 186.37 GWh |
| Virginia | # 18 | 250 | 7,445.56 GWh |
| Washington | # 12 | 134 | 9,231.20 GWh |
| West Virginia | # 32 | 41 | 4,142.41 GWh |
| Wisconsin | # 26 | 266 | 4,582.07 GWh |
| Wyoming | # 38 | 69 | 2,983.81 GWh |