Adelanto Solar II, LLC
13401 Rancho Road, Adelanto, CA 92301Plant Summary Information
Adelanto Solar II, LLC is ranked #260 out of 763 solar farms in California in terms of total annual net electricity generation.
Adelanto Solar II, LLC generated 4.4 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Adelanto Solar II, LLC |
---|---|
Utility Name | Adelanto Solar II, LLC |
Location | San Bernardino County, CA |
Initial Operation Date | July 2015 |
Last Update | Dec 2022 |
Annual Generation | 17.3 GWh |
Annual Consumption | 62.7 k MMBtu |
Ranked #5,174 out of 11,455 Power Plants Nationwide | |
Ranked #1,127 out of 5,173 Solar Power Plants Nationwide | |
Ranked #731 out of 1,543 California Power Plants | |
Ranked #260 out of 763 California Solar Power Plants | |
Fuel Types | Solar |
Map of Adelanto Solar II, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Adelanto Solar II, LLC.
Monthly Net Generation for Adelanto Solar II, LLC
Adelanto Solar II, LLC Details
Summary Information | |
---|---|
Plant Name | Adelanto Solar II, LLC (59440) |
Plant Address | 13401 Rancho Road Adelanto, CA 92301 |
Utility | Adelanto Solar II, LLC (59212) |
Latitude, Longitude | 34.55722, -117.3775 |
Generation Dates on File | Jul 2015 to Dec 2022 |
Initial Operation Date | July 2015 |
Annual Generation | 17.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 33.00 kV |
Energy Storage | No |
Generator SAS Details Operating July 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | VICTOR_7_N011 |
Nameplate Capacity | 7 MW |
Summer Capacity | 7 MW |
Winter Capacity | 7 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 7.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Adelanto Solar II, LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1117 | L&D Landfill Solar | Mt. Holly, NJ | 17.6 GWh |
#1118 | Giffen | TBD, CA | 17.6 GWh |
#1119 | Duus Solar, LLC | Estacada, OR | 17.6 GWh |
#1120 | Estrella Solar & Storage | Lancaster, CA | 17.6 GWh |
#1121 | Hope Farm Solar, LLC | Cranston, RI | 17.5 GWh |
#1122 | Leavenworth Greenworks LLC | Calverton, NY | 17.5 GWh |
#1123 | Cardinal Solar LLC | Marion, SC | 17.4 GWh |
#1124 | Everett PV1 | Parmele, NC | 17.4 GWh |
#1125 | GD Hopkinton Main I, LLC | Hopkinton, RI | 17.4 GWh |
#1126 | Dane County Airport Solar | Madison, WI | 17.3 GWh |
#1128 | E W Brown | Harrodsburg, KY | 1.2 TWh |
#1129 | Nestlewood Solar | Hamersville, OH | 17.2 GWh |
#1130 | Haley Solar | Allendale, SC | 17.2 GWh |
#1131 | Dover Sun Park | Dover, DE | 17.2 GWh |
#1132 | Apple Campus 2 PV | Cupertino, CA | 17.1 GWh |
#1133 | SR Rattlesnake | Platteville, CO | 17.0 GWh |
#1134 | Pinson Solar Farm | Woodruff, SC | 16.9 GWh |
#1135 | Anderson 3 | Anderson, IN | 16.9 GWh |
#1136 | Cinnaminson Landfill Solar | Cinnaminson, NJ | 16.9 GWh |
#1137 | SCE&G Nimitz CSG | Ridgeland, SC | 16.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Adelanto Solar II, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adelanto Solar Project | Adelanto, CA | 11.7 GWh | 3.3 mi |
Adelanto Solar, LLC | Adelanto, CA | 52.6 GWh | 0 mi |
Coronus Adelanto West 1 | Adelanto, CA | 3.0 GWh | 5 mi |
Coronus Adelanto West 2 | Adelanto, CA | 3.7 GWh | 5 mi |
Expressway Solar A | Victorville, CA | 5.1 GWh | 2.7 mi |
Expressway Solar B | Victorville, CA | 4.5 GWh | 2.8 mi |
Expressway Solar C2 | Victorville, CA | 2.5 GWh | 2.8 mi |
Foundation Cemex River Plant | Victorville, CA | 3.0 GWh | 4 mi |
Hesperia | Hesperia, CA | 3.1 GWh | 8.4 mi |
High Desert Power Plant | Victorville, CA | 4.5 TWh | 2.7 mi |
Hudson - High Desert Hybrid | Victorville, CA | 295.6 GWh | 5.5 mi |
Industry Solar Power Generation Station 1 LLC | Adelanto, CA | 4.5 GWh | 4.5 mi |
RE Victor Phelan Solar One LLC | Adelanto, CA | 44.0 GWh | 6.5 mi |
Victor Dry Farm Ranch A | Victorville, CA | 10.5 GWh | 6.4 mi |
Victor Dry Farm Ranch B | Victorville, CA | 9.7 GWh | 6.7 mi |
Victor Mesa Linda B2 | Victorville, CA | 4.0 GWh | 3.1 mi |
Victor Mesa Linda C2 | Victorville, CA | 4.0 GWh | 3.2 mi |
Victor Mesa Linda D2 | Victorville, CA | 4.0 GWh | 3.3 mi |
Victor Mesa Linda E2 | Victorville, CA | 3.9 GWh | 3.4 mi |
Victor Valley CC CPV Solar | Victorville, CA | 2.9 GWh | 8.6 mi |