Sunshine Valley Solar
1520 S. Powerline Rd, Armagosa, NV 89020Plant Summary Information
Sunshine Valley Solar is ranked #39 out of 107 power plants in Nevada in terms of total annual net electricity generation.
Sunshine Valley Solar generated 84.7 GWh during the 3-month period between March 2025 to June 2025.
Plant Name | Sunshine Valley Solar |
---|---|
Utility Name | EDP Renewables North America LLC |
Location | Nye County, NV |
Initial Operation Date | December 2019 |
Last Update | Jun 2025 |
Annual Generation | 270.8 GWh |
Annual Consumption | 1.0 M MMBtu |
Ranked #2,053 out of 12,327 Power Plants Nationwide | |
Ranked #248 out of 6,200 Solar Power Plants Nationwide | |
Ranked #39 out of 107 Nevada Power Plants | |
Ranked #19 out of 60 Nevada Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
First Solar Project Development (2014 to 2018) EDP Renewables North America LLC (2019 to 2024) |
Map of Sunshine Valley Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sunshine Valley Solar.
Monthly Net Generation for Sunshine Valley Solar
Sunshine Valley Solar Details
Summary Information | |
---|---|
Plant Name | Sunshine Valley Solar (59826) |
Plant Address | 1520 S. Powerline Rd, Armagosa, NV 89020 |
Utility | EDP Renewables North America LLC (61785) |
Latitude, Longitude | 36.518, -116.497 |
Generation Dates on File | Dec 2019 to Jun 2025 |
Initial Operation Date | December 2019 |
Annual Generation | 270.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Valley Electric Assn, Inc (19840) NV |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator GEN01 Details Operating December 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 103.5 MW |
Summer Capacity | 103.5 MW |
Winter Capacity | 103.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 126 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Sunshine Valley Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#238 | Wood County | Nekoosa, WI | 277.9 GWh |
#239 | Central Line Solar, LLC | Coolidge, AZ | 277.7 GWh |
#240 | Boulder Solar Power, LLC | Boulder City, NV | 277.3 GWh |
#241 | BPL Files Solar | Itasca, TX | 277.1 GWh |
#242 | Agave | Arlington, AZ | 275.8 GWh |
#243 | Wilmot Energy Center LLC | Tucson, AZ | 272.5 GWh |
#244 | Hardin Solar Energy LLC | Alger, OH | 274.3 GWh |
#245 | Hunter Solar LLC (UT) | Clawson, UT | 273.6 GWh |
#246 | Greasewood Solar | Fort Stockton, TX | 272.1 GWh |
#247 | West Line Solar, LLC | City of Eloy, AZ | 271.6 GWh |
#249 | Wild Springs | New Underwood, SD | 269.7 GWh |
#250 | Emerald Grove | Crane, TX | 268.8 GWh |
#251 | Colonial Trail West | Spring Grove, VA | 267.6 GWh |
#252 | East Blackland Solar Project 1 | Manor, TX | 267.2 GWh |
#253 | McFarland B Solar and Storage | Dateland, AZ | 263.2 GWh |
#254 | Antelope Expansion 2 | Lancaster, CA | 266.4 GWh |
#255 | Dougherty County Solar, LLC | Albany, GA | 265.8 GWh |
#256 | Maverick Solar 4, LLC | Desert Center, CA | 265.2 GWh |
#257 | Bellflower Solar 1 | Lewisville, IN | 264.8 GWh |
#258 | Imperial Solar Energy Center South | Calexico, CA | 264.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sunshine Valley Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Argus Cogen Plant | Trona, CA | 255.5 GWh | 71.8 mi |
CityCenter Central Plant Cogen Units | Las Vegas, NV | 59.4 GWh | 78.7 mi |
Coso Energy Developers | Inyokern, CA | 244.2 GWh | 80.3 mi |
Coso Finance Partners | Inyokern, CA | 378.6 GWh | 79.7 mi |
Coso Power Developers | Inyokern, CA | 299.1 GWh | 79.9 mi |
Dignity - San Martin | Las Vegas, NV | 3.4 GWh | 75.3 mi |
Goodsprings Waste Heat Recovery | Jean, NV | 17.5 GWh | 77.9 mi |
IGS VGT | North Las Vegas, NV | 2.1 GWh | 82.5 mi |
IKEA Las Vegas 462 | Las Vegas, NV | 1.4 GWh | 74.5 mi |
Las Vegas Generating Station | North Las Vegas, NV | 625.1 GWh | 79 mi |
MDU / NVSS-II | Pahrump, NV | 31.4 GWh | 33.7 mi |
Nellis Air Force Base Solar Array | Las Vegas, NV | 23.8 GWh | 82.2 mi |
Nellis Solar PV II | North Las Vegas, NV | 32.4 GWh | 83.5 mi |
Silver State Solar Power North | Primm, NV | 114.5 GWh | 81.2 mi |
Solar Las Vegas MB 2, LLC | Las Vegas, NV | 3.7 GWh | 79.4 mi |
Solar Las Vegas MB-1 | Las Vegas, NV | 4.6 GWh | 79.2 mi |
TJX Las Vegas | North Las Vegas, NV | 2.4 GWh | 80.9 mi |
Trona Solar III | Trona, CA | 4.5 GWh | 68.5 mi |
Yellow Pine II | Enterprise, NV | 392.3 GWh | 49.8 mi |
Yellow Pine Solar | Enterprise, NV | 387.8 GWh | 50.9 mi |