Catalina Solar 2, LLC
70101 125th Street West, Rosamond, CA 93560Plant Summary Information
Catalina Solar 2, LLC is ranked #153 out of 851 solar farms in California in terms of total annual net electricity generation.
Catalina Solar 2, LLC generated 9.8 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Catalina Solar 2, LLC |
|---|---|
| Utility Name | Onward Energy |
| Location | Kern County, CA |
| Initial Operation Date | August 2015 |
| Last Update | Dec 2024 |
| Annual Generation | 52.8 GWh |
| Annual Consumption | 188.4 k MMBtu |
| Ranked #4,045 out of 12,574 Power Plants Nationwide | |
| Ranked #977 out of 6,426 Solar Power Plants Nationwide | |
| Ranked #448 out of 1,603 California Power Plants | |
| Ranked #153 out of 851 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
EDF Renewable Services Inc (2013 to 2013) EDF Renewable Asset Holdings, Inc. (2014 to 2014) Dominion Renewable Energy (2015 to 2020) Onward Energy (2021 to 2024) |
Map of Catalina Solar 2, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Catalina Solar 2, LLC.
Monthly Net Generation for Catalina Solar 2, LLC
Catalina Solar 2, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Catalina Solar 2, LLC (59334) |
| Plant Address | 70101 125th Street West, Rosamond, CA 93560 |
| Utility | Onward Energy (60453) |
| Latitude, Longitude | 34.81222, -118.35278 |
| Generation Dates on File | Aug 2015 to Dec 2024 |
| Initial Operation Date | August 2015 |
| Annual Generation | 52.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 15-650-002 |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG14-91-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 220.00 kV |
| Energy Storage | No |
Generator INV-1 Details Operating August 2015
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | CAISO |
| Nameplate Capacity | 18 MW |
| Summer Capacity | 18 MW |
| Winter Capacity | 18 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2015 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 45 |
| DC Net Capacity | 24.3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Catalina Solar 2, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #967 | Seville 1 | Ocotillo Wells, CA | 54.1 GWh |
| #968 | Antelope Big Sky Ranch | Lancaster, CA | 54.0 GWh |
| #969 | Techren Solar III LLC | Boulder, NV | 54.0 GWh |
| #970 | Techren Solar IV LLC | Boulder, NV | 53.7 GWh |
| #971 | Barilla Solar | Fort Stockton, TX | 53.7 GWh |
| #972 | Innovative Solar 31 | Bladenboro, NC | 53.6 GWh |
| #973 | Caden Energix Endless Caverns, LLC | New Market, VA | 53.5 GWh |
| #974 | SEPV Mojave West | Mojave, CA | 53.5 GWh |
| #975 | Polaris Solar Park | Ashley, MI | 53.3 GWh |
| #976 | Adelanto Solar, LLC | Adelanto, CA | 53.2 GWh |
| #978 | Rocking R Solar, LLC | Hosston, LA | 52.7 GWh |
| #979 | Gaskell West 1 Solar Facility | Lancaster, CA | 52.6 GWh |
| #980 | East Nash PV2 | Spring Hope, NC | 52.5 GWh |
| #981 | Rio Bravo Solar 1 LLC | McKittrick, CA | 52.3 GWh |
| #982 | RE Rosamond One LLC | Rosamond, CA | 52.3 GWh |
| #983 | Red Horse III | Wilcox, AZ | 52.2 GWh |
| #984 | CED Ducor 2 | Ducor, CA | 52.2 GWh |
| #985 | TA-Acacia, LLC | Lancaster, CA | 52.0 GWh |
| #986 | CED Ducor 1 | Ducor, CA | 51.9 GWh |
| #987 | Innovative Solar 47 | Maxton, NC | 51.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Catalina Solar 2, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Antelope DSR 3 | Lancaster, CA | 57.7 GWh | 5.9 mi |
| Antelope Expansion 2 | Lancaster, CA | 264.8 GWh | 5.3 mi |
| Antelope Expansion 3A | Lancaster, CA | 31.7 GWh | 6 mi |
| AV Solar Ranch One | Lancaster, CA | 566.2 GWh | 4.6 mi |
| Chaparral Springs | Rosamond, CA | 418.8 GWh | 4.5 mi |
| Elevation Solar C | Lancaster, CA | 102.5 GWh | 6.3 mi |
| Estrella Solar & Storage | Lancaster, CA | 153.5 GWh | 2.1 mi |
| Golden Field Solar III, LLC | Rosamond, CA | 525.7 GWh | 3.4 mi |
| Golden Fields Solar I, LLC | Rosamond, CA | 137.9 GWh | 2.7 mi |
| Kingbird A Solar LLC | Rosamond, CA | 45.8 GWh | 4.5 mi |
| Kingbird B Solar, LLC | Rosamond, CA | 55.8 GWh | 4.9 mi |
| North Rosamond Solar LLC | Rosamond, CA | 398.7 GWh | 3.8 mi |
| Rabbitbrush Solar, LLC | Rosamond, CA | 246.0 GWh | 2.2 mi |
| Raceway Solar & Storage | Lancaster, CA | 369.0 GWh | 4.3 mi |
| Rosamond South 1 | Rosamond, CA | 93.1 GWh | 2.6 mi |
| Solar Star 1 | Rosamond, CA | 896.9 GWh | 2.9 mi |
| Solar Star 2 | Rosamond, CA | 719.2 GWh | 2.5 mi |
| Solar Star California, XLI, LLC | Rosamond, CA | 148.2 GWh | 2.7 mi |
| Western Antelope Blue Sky B | Lancaster, CA | 50.2 GWh | 6 mi |
| Willow Spring Solar, LLC | Rosamond, CA | 251.6 GWh | 1.4 mi |