RE Barren Ridge 1
26709 Highway 14, Mojave, CA 93501Plant Summary Information
RE Barren Ridge 1 is ranked #100 out of 852 solar farms in California in terms of total annual net electricity generation.
RE Barren Ridge 1 generated 31.3 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | RE Barren Ridge 1 |
|---|---|
| Utility Name | RE Barren Ridge 1, LLC |
| Location | Kern County, CA |
| Initial Operation Date | August 2016 |
| Last Update | Dec 2024 |
| Annual Generation | 175.0 GWh |
| Annual Consumption | 622.6 k MMBtu |
| Ranked #2,687 out of 12,613 Power Plants Nationwide | |
| Ranked #502 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #279 out of 1,603 California Power Plants | |
| Ranked #100 out of 852 California Solar Power Plants | |
| Fuel Types | Solar |
Map of RE Barren Ridge 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for RE Barren Ridge 1.
Monthly Net Generation for RE Barren Ridge 1
Monthly Plant Fuel Consumption for RE Barren Ridge 1
RE Barren Ridge 1 Details
| Summary Information | |
|---|---|
| Plant Name | RE Barren Ridge 1 (60389) |
| Plant Address | 26709 Highway 14, Mojave, CA 93501 |
| Utility | RE Barren Ridge 1, LLC (60191) |
| Latitude, Longitude | 35.20473, -118.06875 |
| Generation Dates on File | Apr 2016 to Dec 2024 |
| Initial Operation Date | August 2016 |
| Annual Generation | 175.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator REBR1 Details Operating August 2016
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 60 MW |
| Summer Capacity | 60 MW |
| Winter Capacity | 60 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2016 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 78 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
RE Barren Ridge 1 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #492 | Decatur Parkway Solar Project, LLC | Bainbridge, GA | 178.7 GWh |
| #493 | Harmony Solar (FL) | St. Cloud, FL | 178.6 GWh |
| #494 | Mitchell Creek | TBD, FL | 178.5 GWh |
| #495 | RE Astoria | Rosamond, CA | 178.5 GWh |
| #496 | Charlie Creek Solar Power Plant | Wauchula, FL | 178.3 GWh |
| #497 | Cedar Trail | Glen St Mary, FL | 178.3 GWh |
| #498 | FPL Saw Palmetto Solar Energy Center | Youngstown, FL | 178.1 GWh |
| #499 | Woodyard | Clewiston, FL | 177.6 GWh |
| #500 | Goose Prairie Solar | Moxee, WA | 177.3 GWh |
| #501 | Amite Solar, LLC | Roseland, LA | 177.3 GWh |
| #503 | Three Creeks | Parrish, FL | 174.9 GWh |
| #504 | Moonshot | Picayune, MS | 174.4 GWh |
| #505 | Southampton Solar, LLC | Newsoms, VA | 174.2 GWh |
| #506 | Trenton Solar Power Plant | Trenton, FL | 173.7 GWh |
| #507 | Gunsight Solar, LLC | Swansea, SC | 173.5 GWh |
| #508 | Wild Azalea Solar Energy Center | Chattahoochee, FL | 173.3 GWh |
| #509 | Harts Mill Solar, LLC | Tarboro, NC | 173.3 GWh |
| #510 | Sweetwater Solar | Green River, WY | 173.3 GWh |
| #511 | Hendry Isles | TBD, FL | 173.1 GWh |
| #512 | Orange Grove | Jim Wells, TX | 172.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding RE Barren Ridge 1.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alta Wind X | Mojave, CA | 379.0 GWh | 12.4 mi |
| Beacon Solar Plant Site 2 | Cantil, CA | 112.3 GWh | 5.8 mi |
| Beacon Solar Plant Site 5 | Cantil, CA | 88.5 GWh | 3.6 mi |
| CalCity Solar 1 | California City, CA | 7.9 GWh | 7.3 mi |
| California City | California City, CA | 4.6 GWh | 6 mi |
| Difwind Farms Ltd VI | Mojave, CA | 14.9 GWh | 12.1 mi |
| Eland Solar & Storage Center, Phase 1 Hy | Mojave, CA | 684.0 GWh | 5.3 mi |
| Eland Solar & Storage Center, Phase 2 Hy | Mojave, CA | 260.1 GWh | 5.2 mi |
| Hecate Energy Beacon Solar 1 | Cantil, CA | 128.7 GWh | 5.4 mi |
| Hecate Energy Beacon Solar 3 | Cantil, CA | 122.1 GWh | 4.5 mi |
| Hecate Energy Beacon Solar 4 | Cantil, CA | 115.9 GWh | 4.1 mi |
| North Sky River Energy LLC | Weldon, CA | 435.0 GWh | 11.9 mi |
| Pine Tree Solar Project | Owenyo, CA | 7.2 GWh | 7.4 mi |
| Pine Tree Wind Power Project | Cantil, CA | 115.4 GWh | 6.7 mi |
| Rising Tree Wind Farm | Mojave, CA | 249.0 GWh | 12.2 mi |
| Rising Tree Wind Farm II | Mojave, CA | 58.7 GWh | 11.2 mi |
| Sky River Wind Energy Center | Tehachapi, CA | 245.0 GWh | 10.8 mi |
| Springbok 3 Solar Farm Hybrid | Cantil, CA | 251.1 GWh | 4.4 mi |
| Springbok Solar Farm 1 | Cantil, CA | 297.7 GWh | 7.1 mi |
| Springbok Solar Farm 2 | Cantil, CA | 399.0 GWh | 6.1 mi |