Russell City Energy Center
3862 Depot Road, Hayward, CA 94545Plant Summary Information
Russell City Energy Center is ranked #18 out of 1,603 power plants in California in terms of total annual net electricity generation.
Russell City Energy Center is comprised of 3 generators and generated 663.7 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Russell City Energy Center |
|---|---|
| Utility Name | Russell City Energy Company LLC |
| Location | Alameda County, CA |
| Initial Operation Date | August 2013 |
| Last Update | Feb 2026 |
| Annual Generation | 1.8 TWh |
| Annual Consumption | 13.8 M MMBtu |
| Ranked #550 out of 12,637 Power Plants Nationwide | |
| Ranked #342 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #18 out of 1,603 California Power Plants | |
| Ranked #14 out of 340 California Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Russell City Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Russell City Energy Center.
Monthly Net Generation for Russell City Energy Center
Monthly Plant Fuel Consumption for Russell City Energy Center
Russell City Energy Center Details
| Summary Information | |
|---|---|
| Plant Name | Russell City Energy Center (56467) |
| Plant Address | 3862 Depot Road, Hayward, CA 94545 |
| Utility | Russell City Energy Company LLC (54890) |
| Latitude, Longitude | 37.63466, -122.13381 |
| Generation Dates on File | Aug 2013 to Feb 2026 |
| Initial Operation Date | August 2013 |
| Annual Generation | 1.8 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | City of Hayward |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | PACIFIC GAS |
| Natural Gas Storage | No |
Generator CTG1 Details Operating August 2013
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 200 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 182 MW |
| Winter Capacity | 192 MW |
| Minimum Load | 117 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG2 Details Operating August 2013
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 200 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 182 MW |
| Winter Capacity | 192 MW |
| Minimum Load | 117 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator STG1 Details Operating August 2013
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 255 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 241 MW |
| Winter Capacity | 248 MW |
| Minimum Load | 65 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 2013 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Russell City Energy Center Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #332 | Apache Station | Cochise, AZ | 2.1 TWh |
| #333 | Watson Cogeneration | Carson, CA | 2.4 TWh |
| #334 | Noblesville | Noblesville, IN | 1.8 TWh |
| #335 | Cunningham | Hobbs, NM | 1.8 TWh |
| #336 | Houston Chemical Complex Battleground | Houston, TX | 1.8 TWh |
| #337 | Bowline Point | West Haverstraw, NY | 1.8 TWh |
| #338 | Mystic Generating Station | Charlestown, MA | 1.8 TWh |
| #339 | Rockingham County CT Station | Reidsville, NC | 1.8 TWh |
| #340 | AES Huntington Beach Energy Project | Huntington Beach, CA | 1.8 TWh |
| #341 | Hopewell Cogeneration | Hopewell, VA | 1.8 TWh |
| #343 | Salem Harbor Power Development LP | Salem, MA | 1.7 TWh |
| #344 | St Francis Energy Facility | Campbell, MO | 1.7 TWh |
| #345 | Langley Gulch Power Plant | New Plymouth, ID | 1.7 TWh |
| #346 | Nichols | Amarillo, TX | 1.7 TWh |
| #347 | Frederickson Power LP | Tacoma, WA | 1.7 TWh |
| #348 | Nueces Bay | Corpus Christi, TX | 1.7 TWh |
| #349 | Treasure Coast Energy Center | Ft. Pierce, FL | 1.7 TWh |
| #350 | Beaver | Clatskanie, OR | 1.7 TWh |
| #351 | West Lorain | Lorain, OH | 1.7 TWh |
| #352 | Luna Energy Facility | Deming, NM | 1.7 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Russell City Energy Center.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alameda | Alameda, CA | 3.1 GWh | 13.6 mi |
| AT&T - Hayward | Hayward, CA | 8.2 GWh | 2.7 mi |
| AT&T - Redwood City | Redwood City, CA | 5.6 GWh | 11.2 mi |
| Bishop Ranch - BR 1-Y | San Ramon, CA | 1.7 GWh | 13 mi |
| Bishop Ranch BR 1-X | San Ramon, CA | 1.6 GWh | 13 mi |
| City of Hayward WWTP | Hayward, CA | 11.3 GWh | 0.3 mi |
| City of Palo Alto | Palo Alta, CA | 20.6 MWh | 13.6 mi |
| Delta Electronics Fremont | Fremont, CA | 616.0 MWh | 14.2 mi |
| Dynegy Oakland Power Plant | Oakland, CA | 1.5 GWh | 13.8 mi |
| Franklin Templeton San Mateo | San Mateo, CA | 9.3 GWh | 10.8 mi |
| Fremont CA AutoFactory | Fremont, CA | 480.0 MWh | 14.3 mi |
| Gilead Foster City Solar Project | Foster City, CA | 1.9 GWh | 9.1 mi |
| Kaiser Owens Dr. Fuel Cell | Pleasanton, CA | 7.9 GWh | 13.8 mi |
| KSR028 Merced Fuel Cell | San Leandro, CA | 15.7 GWh | 5.2 mi |
| Life Technologies - Pleasanton | Pleasanton, CA | 8.5 GWh | 13.7 mi |
| Preferred Freezer San Leandro | San Leandro, CA | 3.2 GWh | 5.4 mi |
| Santa Rita Jail Hybrid | Dublin, CA | 13.1 GWh | 14.7 mi |
| Silicon Valley Clean Water | Redwood City, CA | 7.0 GWh | 8.3 mi |
| SRI International Cogen Project | Menlo Park, CA | 23.9 GWh | 12.6 mi |
| Stanford Campus Solar | Stanford, CA | 5.9 GWh | 13.9 mi |