15800 70th St West, Mojave, CA 93501Plant Summary Information
Rising Tree Wind Farm is ranked #26 out of 110 wind farms in California in terms of total annual net electricity generation.
Rising Tree Wind Farm generated 43.5 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Rising Tree Wind Farm |
|---|---|
| Utility Name | Rising Tree Wind Farm LLC |
| Location | Kern County, CA |
| Initial Operation Date | January 2015 |
| Last Update | Dec 2024 |
| Annual Generation | 249.0 GWh |
| Annual Consumption | 875.3 k MMBtu |
| Ranked #2,208 out of 12,539 Power Plants Nationwide | |
| Ranked #673 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #221 out of 1,600 California Power Plants | |
| Ranked #26 out of 110 California Wind Power Plants | |
| Fuel Types | Wind |
Map of Rising Tree Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Rising Tree Wind Farm.
Monthly Net Generation for Rising Tree Wind Farm
Rising Tree Wind Farm Details
| Summary Information | |
|---|---|
| Plant Name | Rising Tree Wind Farm (57621) |
| Plant Address | 15800 70th St West, Mojave, CA 93501 |
| Utility | Rising Tree Wind Farm LLC (56937) |
| Latitude, Longitude | 35.0775, -118.21833 |
| Generation Dates on File | Jan 2015 to Dec 2024 |
| Initial Operation Date | January 2015 |
| Annual Generation | 249.0 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG14-53 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator GEN1 Details Operating January 2015
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | RTO/ISO LMP |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | RTO/ISO LMP |
| Nameplate Capacity | 79.2 MW |
| Summer Capacity | 79.2 MW |
| Winter Capacity | 79.2 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 2015 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 24 |
| Turbine Details | |
| Number Of Turbines | 24 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V112-3.3 |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 276 |
Rising Tree Wind Farm Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #663 | Ironwood Wind | Spearville, KS | 251.7 GWh |
| #664 | Red Barn Energy | Montfort, WI | 251.6 GWh |
| #665 | Hancock County Wind Energy Center | Garner, IA | 251.5 GWh |
| #666 | Minco Wind II, LLC | Minco, OK | 251.0 GWh |
| #667 | Smoky Hills Wind Project Phase I | Lincoln, KS | 250.8 GWh |
| #668 | San Roman Wind I, LLC | Los Fresnos, TX | 250.7 GWh |
| #669 | Rockland Wind Farm | American Falls, ID | 250.6 GWh |
| #670 | Laurel Mountain Hybrid | Belington, WV | 247.4 GWh |
| #671 | Blackstone Wind Farm LLC | Ransom, IL | 250.1 GWh |
| #672 | Wheatridge 1 | Lexington, OR | 249.3 GWh |
| #674 | Golden Hills Wind | Livermore, CA | 247.4 GWh |
| #675 | Farmers City Wind LLC | Tarkio, MO | 246.4 GWh |
| #676 | Klondike Windpower II | Wasco, OR | 245.8 GWh |
| #677 | Sky River Wind Energy Center | Tehachapi, CA | 245.0 GWh |
| #678 | Rolling Hills | Glenrock, WY | 244.8 GWh |
| #679 | Cassadaga Wind Farm | Cherry Creek, NY | 244.5 GWh |
| #680 | Lake Benton I | Lake Benton, MN | 243.8 GWh |
| #681 | Lost Lakes Wind Farm LLC | Lake Park, IA | 243.7 GWh |
| #682 | Sandy Ridge Wind 2, LLC | Tyrone, PA | 243.7 GWh |
| #683 | South Peak Wind | Geyser, MT | 240.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Rising Tree Wind Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alta Wind VIII | Mojave, CA | 222.0 GWh | 3.6 mi |
| Alta Wind X | Mojave, CA | 379.0 GWh | 1.6 mi |
| Difwind Farms Ltd VI | Mojave, CA | 14.9 GWh | 3.2 mi |
| Mojave 16/17/18 | Mojave, CA | 73.9 GWh | 3.4 mi |
| Mojave 3/4/5 | Mojave, CA | 132.8 GWh | 2.9 mi |
| Oak Creek Energy Systems I | Mojave, CA | 54.5 GWh | 4 mi |
| Oasis Alta | Mojave, CA | 57.0 GWh | 4.4 mi |
| Oasis Wind | Mojave, CA | 238.4 GWh | 4.3 mi |
| Pinyon Pine I | Mojave, CA | 306.6 GWh | 2.4 mi |
| Pinyon Pine II | Mojave, CA | 233.1 GWh | 3.5 mi |
| RE Camelot LLC | Mojave, CA | 125.1 GWh | 4 mi |
| RE Columbia 3 LLC | Mojave, CA | 23.9 GWh | 4.8 mi |
| RE Columbia Two, LLC | Mojave, CA | 40.4 GWh | 4 mi |
| Rising Tree Wind Farm II | Mojave, CA | 58.7 GWh | 1 mi |
| Rising Tree Wind Farm III | Mojave, CA | 261.4 GWh | 1.8 mi |
| TPC Windfarms LLC | Mojave, CA | 46.5 GWh | 2.9 mi |
| Voyager Wind I | Mojave, CA | 413.4 GWh | 4.2 mi |
| Voyager Wind II | Mojave, CA | 505.9 GWh | 2.9 mi |
| Voyager Wind III | Mojave, CA | 141.2 GWh | 2.9 mi |
| Voyager Wind IV | Mojave, CA | 80.9 GWh | 1.8 mi |