Carson Power Plant
Franklin Blvd, Sacramento, CA 95758Plant Summary Information
Carson Power Plant is ranked #69 out of 316 natural gas power plants in California in terms of total annual net electricity generation.
Carson Power Plant is comprised of 3 generators and generated 165.0 MWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Carson Power Plant |
|---|---|
| Utility Name | Sacramento Municipal Util Dist |
| Location | Sacramento County, CA |
| Initial Operation Date | October 1995 |
| Last Update | Jun 2026 |
| Annual Generation | 83.0 GWh |
| Annual Consumption | 794.3 k MMBtu |
| Ranked #3,724 out of 13,094 Power Plants Nationwide | |
| Ranked #968 out of 2,208 Natural Gas Power Plants Nationwide | |
| Ranked #369 out of 1,607 California Power Plants | |
| Ranked #69 out of 316 California Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 97.4% Other Biomass Gas : 2.6% |
Map of Carson Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Carson Power Plant.
Monthly Net Generation for Carson Power Plant
Monthly Plant Fuel Consumption for Carson Power Plant
Carson Power Plant Details
| Summary Information | |
|---|---|
| Plant Name | Carson Power Plant (7527) |
| Plant Address | Franklin Blvd, Sacramento, CA 95758 |
| Utility | Sacramento Municipal Util Dist (16534) |
| Latitude, Longitude | 38.44568, -121.46239 |
| Generation Dates on File | Jan 2001 to Jun 2026 |
| Initial Operation Date | October 1995 |
| Annual Generation | 83.0 GWh |
| Fuel Types | Natural Gas : 97.4% Other Biomass Gas : 2.6% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | Balancing Authority of Northern California (BANC) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Sacramento/Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Sacramento Municipal Util Dist (16534) CA |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | PACIFIC GAS |
| Natural Gas Storage | No |
Generator 1 Details Operating October 1995
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 54 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 41.2 MW |
| Winter Capacity | 41.2 MW |
| Minimum Load | 20 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 1995 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Electric Utility (1) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 2 Details Operating October 1995
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 17.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 16.6 MW |
| Winter Capacity | 16.6 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | October 1995 |
| Combined Heat & Power | Yes |
| Sector Name | Electric Utility (1) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator CCCT Details Operating October 1995
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 54 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 51.2 MW |
| Winter Capacity | 51.2 MW |
| Minimum Load | 21 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | October 1995 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Other Biomass Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | NG / OBG |
|---|---|
Carson Power Plant Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #958 | Terry Bundy Generating Station | Lincoln, NE | 116.8 GWh |
| #959 | University of Notre Dame | Notre Dame, IN | 84.9 GWh |
| #960 | WFEC GenCo LLC | Anadarko, OK | 83.7 GWh |
| #961 | Goodman Energy Center | Hays, KS | 83.2 GWh |
| #962 | Pratt & Whitney | East Hartford, CT | 82.8 GWh |
| #963 | Packaging Corp. of America Jackson Mill | Jackson, AL | 223.3 GWh |
| #964 | Harbor | Wilmington, CA | 82.3 GWh |
| #965 | Clearwater Paper IPP Lewiston | Lewiston, ID | 464.4 GWh |
| #966 | WE Soda Alkalai LLC | Green River, WY | 259.5 GWh |
| #967 | Western Michigan University Power Plant | Kalamazoo, MI | 80.9 GWh |
| #969 | Macon Energy Center | Macon, MO | 80.7 GWh |
| #970 | McCartney | Strafford, MO | 80.6 GWh |
| #971 | Greenwood (MO) | Greenwood, MO | 90.4 GWh |
| #972 | Indeck Olean Energy Center | Olean, NY | 79.7 GWh |
| #973 | WestRock (TX) | Evadale, TX | 415.2 GWh |
| #974 | Pulliam | Green Bay, WI | 78.7 GWh |
| #975 | Packaging Corp of America | Counce, TN | 429.9 GWh |
| #976 | Ford Utilities Center | Albuquerque, NM | 78.4 GWh |
| #977 | Central Heating Plant | Amherst, MA | 79.6 GWh |
| #978 | Mont Belvieu Cogeneration Unit | Mont Belvieu, TX | 76.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Carson Power Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Campbell Power Plant | Sacramento, CA | 525.0 GWh | 4.6 mi |
| CSU Sacramento I | Sacramento, CA | 2.1 GWh | 7.7 mi |
| Department of Justice | Sacramento, CA | 3.5 GWh | 7.1 mi |
| Depot Park Solar System | Sacramento, CA | 2.7 GWh | 5.9 mi |
| FRV SI Transport Solar LP | Sacramento, CA | 1.3 GWh | 4.8 mi |
| KP South Sacramento Hospital Solar | Sacramento, CA | 2.6 GWh | 2.5 mi |
| Procter & Gamble Power Plant | Sacramento, CA | 523.2 GWh | 6.8 mi |
| RE Bruceville 1 LLC | Elk Grove, CA | 10.8 GWh | 7.3 mi |
| RE Bruceville 2 LLC | Elk Grove, CA | 9.5 GWh | 7.3 mi |
| RE Bruceville 3 LLC | Elk Grove, CA | 11.3 GWh | 7.3 mi |
| RE Kammerer 1 LLC | Elk Grove, CA | 10.5 GWh | 7.1 mi |
| RE Kammerer 2 LLC | Elk Grove, CA | 10.5 GWh | 7.1 mi |
| RE Kammerer 3 LLC | Elk Grove, CA | 10.5 GWh | 7.1 mi |
| Renew Solar ABC Sacramento LLC | Sacramento, CA | 2.7 GWh | 9.7 mi |
| Sacramento (SMUD) | Sacramento, CA | 2.3 GWh | 9.8 mi |
| Sacramento Fairbain Water Treatment Plan | Sacramento, CA | 1.2 GWh | 7.9 mi |
| Sacramento Regional County Sanitation PV | Elk Grove, CA | 7.4 GWh | 0.2 mi |
| SMUD at Grundman | Elk Grove, CA | 28.8 GWh | 6.2 mi |
| SMUD at Lawrence | Elk Grove, CA | 1.6 GWh | 7.6 mi |