Valencia 3
20 W. Harris Rd, Imperial, CA 92251Plant Summary Information
Valencia 3 is ranked #378 out of 849 solar farms in California in terms of total annual net electricity generation.
Valencia 3 generated 771.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Valencia 3 |
|---|---|
| Utility Name | Greenbacker Renewable Energy Corporation |
| Location | Imperial County, CA |
| Initial Operation Date | April 2021 |
| Last Update | Dec 2024 |
| Annual Generation | 6.6 GWh |
| Annual Consumption | 24.1 k MMBtu |
| Ranked #7,370 out of 12,539 Power Plants Nationwide | |
| Ranked #2,729 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #1,004 out of 1,600 California Power Plants | |
| Ranked #378 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Valencia 3
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Valencia 3.
Monthly Net Generation for Valencia 3
Valencia 3 Details
| Summary Information | |
|---|---|
| Plant Name | Valencia 3 (64441) |
| Plant Address | 20 W. Harris Rd, Imperial, CA 92251 |
| Utility | Greenbacker Renewable Energy Corporation (60025) |
| Latitude, Longitude | 32.88567, -115.53765 |
| Generation Dates on File | Apr 2021 to Dec 2024 |
| Initial Operation Date | April 2021 |
| Annual Generation | 6.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Imperial Irrigation District (IID) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Imperial Irrigation District (9216) CA |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator 266 Details Operating April 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 3 MW |
| Summer Capacity | 3 MW |
| Winter Capacity | 3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Tilt Angle | 52 |
| DC Net Capacity | 4.2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Valencia 3 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2719 | Cawelo Water District Solar | Famoso, CA | 6.7 GWh |
| #2720 | AES Daigle Solar, LLC | Fort Kent, ME | 6.7 GWh |
| #2721 | Verde Light Community Solar | Ontario, OR | 6.7 GWh |
| #2722 | SCH - (2A) 156 Barhydt Rd Glenville | Glenville, NY | 6.4 GWh |
| #2723 | The Lawrenceville School Solar Facility | Lawrenceville, NJ | 6.7 GWh |
| #2724 | Barefoot Solar | Fairfiled, ME | 6.7 GWh |
| #2725 | Statesboro Solar LLC | Statesboro, GA | 6.7 GWh |
| #2726 | Happy Solar | Four Oaks, NC | 6.6 GWh |
| #2727 | Chocowinity Solar LLC | Chocowinity, NC | 6.6 GWh |
| #2728 | Chaffey College Rancho Cucamonga Campus | Rancho Cucamonga, CA | 6.6 GWh |
| #2730 | Montrose Solar | Montrose, MN | 6.6 GWh |
| #2731 | KDC Solar ASGM | Bridgeton, NJ | 6.6 GWh |
| #2732 | Old Wardour Solar | East Brookfield, MA | 6.6 GWh |
| #2733 | Vuelta Solar | East Brookfield, MA | 6.6 GWh |
| #2734 | Williamsburg | Goshen, MA | 6.6 GWh |
| #2735 | Seabrook Solar Plant | Seabrook, NJ | 6.6 GWh |
| #2736 | Pivot Solar NY 9 | Ticonderoga, NY | 6.6 GWh |
| #2737 | Quichapa 1 | Cedar City, UT | 6.6 GWh |
| #2738 | Highway 56 Solar | Sherman, TX | 6.6 GWh |
| #2739 | Watervliet PV | Watervliet, MI | 6.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Valencia 3.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Campo Verde Solar | El Centro, CA | 294.7 GWh | 14.3 mi |
| Centinela Solar Energy | Calexico, CA | 352.7 GWh | 15.1 mi |
| Centinela State Prison | Sacramento, CA | 16.7 GWh | 14.8 mi |
| Community Solar 1 | Brawley, CA | 13.9 GWh | 7.4 mi |
| Crown Cooling Facility | Brawley, CA | 982.0 MWh | 5.6 mi |
| El Centro Hybrid | El Centro, CA | 1.1 TWh | 5.8 mi |
| Heber Geothermal | Heber, CA | 384.9 GWh | 11.9 mi |
| Heber Solar | Heber, CA | 24.6 GWh | 12 mi |
| Imperial Valley Solar, LLC | Calexico, CA | 443.5 GWh | 15.1 mi |
| IVC Solar | Imperial, CA | 4.2 GWh | 4.1 mi |
| Mount Signal Solar Farm V | Calexico, CA | 673.8 GWh | 14.4 mi |
| North Brawley Geothermal Plant | Brawley, CA | 16.9 GWh | 8.9 mi |
| Rockwood | Brawley, CA | 6.8 GWh | 4.8 mi |
| Second Imperial Geothermal | Heber, CA | 302.3 GWh | 11.8 mi |
| SEPV Imperial Dixieland East | Imperial, CA | 4.2 GWh | 15.1 mi |
| Sol Orchard El Centro PV | El Centro, CA | 47.1 GWh | 5.7 mi |
| Solar Gen 2 Solar Facility | Calipatria, CA | 364.2 GWh | 14 mi |
| Spreckels Sugar Company | Brawley, CA | 19.9 GWh | 2.5 mi |
| Valencia 1 Solar CA | Westmorland, CA | 6.7 GWh | 12.1 mi |
| Valencia 2 | Imperial, CA | 3.9 GWh | 9.4 mi |