Genesis Solar Energy Project
11995 Wiley's Road, Blythe, CA 92225Plant Summary Information
Genesis Solar Energy Project is ranked #18 out of 852 solar farms in California in terms of total annual net electricity generation.
Genesis Solar Energy Project generated 96.3 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Genesis Solar Energy Project |
|---|---|
| Utility Name | Genesis Solar LLC |
| Location | Riverside County, CA |
| Initial Operation Date | November 2013 |
| Last Update | Dec 2025 |
| Annual Generation | 607.9 GWh |
| Annual Consumption | 6.6 M MMBtu |
| Ranked #1,130 out of 12,613 Power Plants Nationwide | |
| Ranked #59 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #60 out of 1,603 California Power Plants | |
| Ranked #18 out of 852 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Genesis Solar Energy Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Genesis Solar Energy Project.
Monthly Net Generation for Genesis Solar Energy Project
Monthly Plant Fuel Consumption for Genesis Solar Energy Project
Genesis Solar Energy Project Details
| Summary Information | |
|---|---|
| Plant Name | Genesis Solar Energy Project (57394) |
| Plant Address | 11995 Wiley's Road, Blythe, CA 92225 |
| Utility | Genesis Solar LLC (56723) |
| Latitude, Longitude | 33.665, -114.99806 |
| Generation Dates on File | Nov 2013 to Dec 2025 |
| Initial Operation Date | November 2013 |
| Annual Generation | 607.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Air Cooled Condensor |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator GEN02 Details Operating November 2013
| Technology | Solar Thermal without Energy Storage |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 125 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 125 MW |
| Winter Capacity | 125 MW |
| Minimum Load | 14.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2013 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Startup Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
| Solar Details | |
| Lenses Mirrors | Yes |
|---|---|
| Single Axis Tracking | Yes |
| Parabolic Trough | Yes |
Generator GEN01 Details Operating March 2014
| Technology | Solar Thermal without Energy Storage |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 125 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 125 MW |
| Winter Capacity | 125 MW |
| Minimum Load | 14.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2014 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Startup Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
| Solar Details | |
| Lenses Mirrors | Yes |
|---|---|
| Single Axis Tracking | Yes |
| Parabolic Trough | Yes |
Genesis Solar Energy Project Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #49 | Aquamarine | Lemoore, CA | 662.4 GWh |
| #50 | Arlington Energy Center II | Blythe, CA | 633.5 GWh |
| #51 | AEUG Union Solar, LLC | West Mansfield, OH | 657.8 GWh |
| #52 | IP Radian, LLC | Brookesmith, TX | 657.7 GWh |
| #53 | Wadley Solar | Wadley, GA | 627.6 GWh |
| #54 | Peregrine Solar | Gollad, TX | 627.3 GWh |
| #55 | Stateline Solar | Nipton, CA | 619.9 GWh |
| #56 | McFarland B Solar and Storage | Dateland, AZ | 600.5 GWh |
| #57 | Moapa Southern Paiute | Moapa, NV | 611.7 GWh |
| #58 | Arrow Canyon Solar Hybrid | Moapa, NV | 595.1 GWh |
| #60 | Oberon II Solar Project | Desert Center, CA | 589.8 GWh |
| #61 | Hecate Energy Highland LLC | Buford, OH | 604.3 GWh |
| #62 | Blythe Mesa Solar II | Blythe, CA | 585.5 GWh |
| #63 | Oberon Solar Project | Desert Center, CA | 581.5 GWh |
| #64 | California Valley Solar Ranch | California Valley, CA | 597.7 GWh |
| #65 | Copper Mountain Solar 3 | Boulder City, NV | 597.4 GWh |
| #66 | Blythe Solar 110, LLC | Blythe, CA | 580.5 GWh |
| #67 | Mojave Solar Project | Hinkley, CA | 590.4 GWh |
| #68 | Victory Pass | Desert Center, CA | 574.6 GWh |
| #69 | Bighorn Solar 1 | Pueblo, CO | 582.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Genesis Solar Energy Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arica Solar | Desert Center, CA | 777.1 GWh | 18.5 mi |
| Arlington Energy Center II | Blythe, CA | 633.5 GWh | 13 mi |
| Arlington Energy Center III | Blythe, CA | 320.9 GWh | 13 mi |
| Athos Solar Project | Desert Center, CA | 700.2 GWh | 21.4 mi |
| Blythe Energy Inc | Blythe, CA | 315.2 GWh | 18.2 mi |
| Blythe Mesa Solar II | Blythe, CA | 585.5 GWh | 18.4 mi |
| Blythe Solar 110, LLC | Blythe, CA | 580.5 GWh | 14.8 mi |
| Blythe Solar II, LLC | Blythe, CA | 337.0 GWh | 15.4 mi |
| Blythe Solar III, LLC Hybrid | Blythe, CA | 354.6 GWh | 14.7 mi |
| Blythe Solar IV, LLC | Blythe, CA | 346.8 GWh | 13.3 mi |
| Chuckawalla Solar | Blythe, CA | 7.1 GWh | 8.1 mi |
| Chuckawalla Valley State Prison | Blythe, CA | 1.4 GWh | 8.8 mi |
| Desert Quartzite | Blythe, CA | 822.9 GWh | 15.7 mi |
| Ironwood Solar LLC | Blythe, CA | 7.5 GWh | 8.3 mi |
| McCoy Solar Energy Project Hybrid | Blythe, CA | 646.7 GWh | 15 mi |
| Palo Verde College | Blythe, CA | 2.0 GWh | 19.9 mi |
| Solar Blythe 2 | Blythe, CA | 38.1 GWh | 17.7 mi |
| Solar Blythe LLC | Blythe, CA | 41.8 GWh | 15.4 mi |
| SunEdison Ironwood State Prison | Blythe, CA | 996.0 MWh | 8.2 mi |
| Victory Pass | Desert Center, CA | 574.6 GWh | 18.5 mi |