El Dorado Solar, LLC
4625 Latrobe Rd, El Dorado Hills, CA 95762Plant Summary Information
El Dorado Solar, LLC is ranked #556 out of 816 solar farms in California in terms of total annual net electricity generation.
El Dorado Solar, LLC generated 611.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | El Dorado Solar, LLC |
---|---|
Utility Name | Greenbacker Renewable Energy Corporation |
Location | El Dorado County, CA |
Initial Operation Date | April 2021 |
Last Update | Dec 2024 |
Annual Generation | 2.9 GWh |
Annual Consumption | 10.5 k MMBtu |
Ranked #9,391 out of 12,288 Power Plants Nationwide | |
Ranked #4,312 out of 6,174 Solar Power Plants Nationwide | |
Ranked #1,260 out of 1,564 California Power Plants | |
Ranked #556 out of 816 California Solar Power Plants | |
Fuel Types | Solar |
Map of El Dorado Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for El Dorado Solar, LLC.
Monthly Net Generation for El Dorado Solar, LLC
El Dorado Solar, LLC Details
Summary Information | |
---|---|
Plant Name | El Dorado Solar, LLC (64700) |
Plant Address | 4625 Latrobe Rd, El Dorado Hills, CA 95762 |
Utility | Greenbacker Renewable Energy Corporation (60025) |
Latitude, Longitude | 38.637, -121.059 |
Generation Dates on File | Apr 2021 to Dec 2024 |
Initial Operation Date | April 2021 |
Annual Generation | 2.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 21-702 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 390 Details Operating April 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | No |
---|---|
Fixed Tilt | Yes |
Azimuth Angle | 18 |
Tilt Angle | 25 |
DC Net Capacity | 1.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
El Dorado Solar, LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4302 | Lisbon Street Solar | Lewiston, ME | 3.0 GWh |
#4303 | O'Shea Solar Farm | Detroit, MI | 3.0 GWh |
#4304 | First Baptist Church of Glenarden | Upper Marlboro, MD | 3.0 GWh |
#4305 | Hadley 2 Solar, LLC CSG | Hadley, MA | 3.0 GWh |
#4306 | White CSG | Baltimore, MD | 3.0 GWh |
#4307 | Mustang One | Cambridge, MD | 3.0 GWh |
#4308 | HQC Rock River Solar Power Gen Station | Beloit, WI | 3.0 GWh |
#4309 | ER Salvage Yard | Morrisville, VT | 3.0 GWh |
#4310 | Sandy River Solar (CSG) | Sandy, OR | 2.9 GWh |
#4311 | Greenfield Solar PV | Greenfield, MA | 2.9 GWh |
#4313 | San Diego - NCRC at Vista | Vista, CA | 2.9 GWh |
#4314 | NY Van Buren II CSG | Warners, NY | 2.9 GWh |
#4315 | KS Solar Six LLC | Hubbardston, MA | 2.9 GWh |
#4316 | Baltimore City G | Perryman, MD | 2.9 GWh |
#4317 | Minisink Community Solar 2 LLC | Minisink, NY | 2.9 GWh |
#4318 | Sydney Solar | Hampton, CT | 2.9 GWh |
#4319 | Hatfield Renewables Community Solar | Hatfield, MA | 2.9 GWh |
#4320 | Innovative Solar 15, LLC | Ellenboro, NC | 2.9 GWh |
#4321 | KDC Solar CV Central MD Regional Transit | West Friendship, MD | 2.9 GWh |
#4322 | El Dorado County | Placerville, CA | 2.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding El Dorado Solar, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aerojet I | Rancho Cordova, CA | 5.1 GWh | 5.8 mi |
Aerojet II | Rancho Cordova, CA | 3.8 GWh | 6.3 mi |
Blue Shld Of Cal- El Dorado Hlls Mtr B | El Dorado Hills, CA | 2.8 GWh | 1.2 mi |
Broadridge Cogen | El Dorado Hills, CA | 15.8 GWh | 1.3 mi |
Deer Creek 2 | Shingle Springs, CA | 2.7 GWh | 4.1 mi |
Dept of General Services -FTB | Sacramento, CA | 5.1 GWh | 16.1 mi |
El Dorado County | Placerville, CA | 2.9 GWh | 13.1 mi |
FAA NorCal TRACON | Mather AFB, CA | 1.6 GWh | 12 mi |
Folsom | Folsom, CA | 580.4 GWh | 7.2 mi |
Folsom SP and CSP Sacramento | Represa, CA | 2.3 GWh | 6.5 mi |
Intel Folsom | Folsom, CA | 1.4 GWh | 6.2 mi |
Intel Folsom Phase 2 | Folsom, CA | 1.5 GWh | 5.7 mi |
Intel Folsom Phase 3 | Folsom, CA | 9.1 GWh | 5.6 mi |
Kiefer Landfill | Sloughhouse, CA | 51.0 GWh | 11.2 mi |
Newcastle | Auburn, CA | 7.5 GWh | 13.8 mi |
Nimbus | Folsom, CA | 50.6 GWh | 8.7 mi |
Rancho Cordova Medical Offices | Rancho Cordova, CA | 2.0 GWh | 13.2 mi |
RE Dillard 1 LLC | Sloughhouse, CA | 6.0 GWh | 13.4 mi |
RE Dillard 2 LLC | Sloughhouse, CA | 6.1 GWh | 13.4 mi |
RE Dillard 3 LLC | Sloughhouse, CA | 6.1 GWh | 13.8 mi |